If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28659 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.194803,"lon":-79.742897,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149319 | |
Farm/Lease Name: SLEITH UNIT 9H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-08-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.194803 | |
Longitude: -79.742897 |
Date | Event |
---|---|
2011-08-19 | New Permit Application |
2011-10-01 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-20 | 2013-09-25 | 6,742 | 4,671,610 | 35,210 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.01783 | 0 |
Proppant | U.S. Sand Co | Proppant | Crystalline Silica | 14808-60-7 | 100 | 6.63659 | 0 | |
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.0075 | 0 | |
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.03425 | 0 | |
CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.00001000 | 0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00712 | 0 | |
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 93.3534 | 0 | |
EC 6116a | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.00128 | 0 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.01535 | 0 | ||||
1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00768 | 0 | ||||
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.08634 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 782,694.00 | 208 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 838,755.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 594,165.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 460,777.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 395,472.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 328,063.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 81.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 778.42 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 328.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,203.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,076.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 30.54 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,796.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,994.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 503.77 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 782.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,707.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 254.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 58.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 83.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 24.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 168.75 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 221.25 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 385.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 446.25 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 32.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2010411 | Primary Facility | 2011-10-04 | Drilling/Alteration | No Violations Noted | SPUDDED |
2013194 | Primary Facility | 2011-10-21 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site due to spud notification. |
2021166 | Primary Facility | 2011-11-17 | Drilling/Alteration | No Violations Noted | SPUDDED, MOVING YOST RIG 6 ONTO PAD. |
2026112 | Primary Facility | 2011-12-12 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2026825 | Primary Facility | 2011-12-07 | Drilling/Alteration | No Violations Noted | YOST RIG 6 DRILLING AT DEPTH OF 8213'. |
2030602 | Primary Facility | 2011-12-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2037021 | Primary Facility | 2012-01-17 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2037565 | Primary Facility | 2012-01-27 | Routine/Complete Inspection | No Violations Noted | |
2042918 | Primary Facility | 2012-02-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2048774 | Primary Facility | 2012-02-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2048782 | Primary Facility | 2012-03-01 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2052489 | Primary Facility | 2012-03-21 | Incident- Response to Accident or Event | No Violations Noted | |
2052661 | Primary Facility | 2012-03-13 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2061708 | Primary Facility | 2012-04-09 | Drilling/Alteration | No Violations Noted | YOST RIG 6 DRILLING AT DEPTH OF 8213'. TOP OF PLUG 6470'. |
2068981 | Primary Facility | 2012-05-15 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2087939 | Primary Facility | 2012-07-18 | Drilling/Alteration | No Violations Noted | 7/18/2012 Back filling drill pit, and not fraced yet. |
2093990 | Primary Facility | 2012-08-23 | Complaint Inspection | No Violations Noted | 4 wells drilled. No frac yet. 2 lined impoundments. |
2166038 | Primary Facility | 2013-05-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2195303 | Primary Facility | 2013-08-14 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | Administrative review the result of a restoration extension request submitted to the Department on June 7 2013. During the restoration review process the Department notes that the Operator was approximately 2 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/14/2012 making the restoration date 2/14/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. |
2199777 | Primary Facility | 2013-08-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2216361 | Primary Facility | 2013-10-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2228535 | Primary Facility | 2013-11-11 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2258944 | Primary Facility | 2014-03-18 | Routine/Complete Inspection | No Violations Noted | 3/18/2014 Produced fluids tanks diked and GPU's |
2265474 | Primary Facility | 2014-04-24 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection in response to a 50 gallon spill reported on 4.23.2014. The Department notes that the Operator is in compliance with the current spill policy for a reportable spill. During the inspection the Department observed an excavated area approximately 40'x15' the depth of the excavated area was approximately 8". The Operator indicated that the spill occurred when a crew attempted to remove a flow line containing treated water, when the fitting was broken the treated water spilled to the ground. The Department suggest the Operator follow the current spill policy to insure the impacted area has been remediated and meets background. The Department also suggest the Operator forward the sample results after the remediation steps have been taken. |
2310361 | Primary Facility | 2014-10-06 | Routine/Complete Inspection | No Violations Noted | 10/6/2014 Produced fluids tanks diked and GPU's |
2325388 | Primary Facility | 2014-12-02 | Compliance Evaluation | No Violations Noted | Compliance Inspection in response to a 50 gallon spill reported on 4.23.2014. The Department has received the 15 day response in relation to the release. The impacted material appears to have been removed. At the time of inspection the site appears to be regraded seeded and mulched. |
2369030 | Primary Facility | 2015-05-05 | Routine/Complete Inspection | No Violations Noted | 5/5/2015 Produced fluids tanks diked and GPU's |
2393449 | Primary Facility | 2015-07-02 | Routine/Complete Inspection | No Violations Noted | |
2396618 | Primary Facility | 2015-08-06 | Site Restoration | No Violations Noted | Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan. |
2439980 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | 1/12/2016 Produced fluids tanks diked and GPU's |
2512579 | Primary Facility | 2016-08-22 | Routine/Partial Inspection | No Violations Noted | Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to be stable. |
2516769 | Primary Facility | 2016-08-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2534599 | Primary Facility | 2016-10-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2543503 | Primary Facility | 2016-12-08 | Routine/Partial Inspection | No Violations Noted | |
2554471 | Primary Facility | 2017-01-23 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2559632 | Primary Facility | 2017-02-07 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2566640 | Primary Facility | 2017-03-01 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road. |
2590629 | Primary Facility | 2017-05-05 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP. |
2614804 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2195303 | 675164 | 08/14/2013 | 2013-08-14 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative | 3216c |
2265474 | 694325 | 04/24/2014 | 2014-04-24 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | treated water spill |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
675164 | 300896 | NOV - Notice of Violation | Comply/Closed | 2013-10-11 | |||
675164 | 309499 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2014-04-07 | 2014-04-07 | $2,000.00 | $2,000.00 |
694325 | 310326 | NOV - Notice of Violation | Comply/Closed | 2014-12-01 |
For data sources see[8]