If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28688 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.266144,"lon":-79.751119,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Sewickley Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 145081 | |
Farm/Lease Name: PLASSIO UNIT 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.266144 | |
Longitude: -79.751119 |
Date | Event |
---|---|
2011-10-12 | New Permit Application |
2012-09-18 | New Permit Application |
2012-10-02 | Performed Spud Operation |
2013-05-03 | Drilling Completion |
2013-07-24 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-24 | 2013-07-30 | 8,096 | 3,561,710 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00709 | 0 |
CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.002 | 0 | |
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | |||
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 91.24 | 0 | |
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.0886 | 0 | |
EC 6116a | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.0153 | 0 | |
1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00765 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00128 | 0 | ||||
Proppant | Chevron Applachia, LLC | Proppant | Crystalline Silica | 14808-60-7 | 100 | 8.76 | 0 | |
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00757 | 0 | |
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.0325 | 0 | |
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00003000 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 256,349.00 | 34 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 829,481.00 | 365 | 0.00 | 0 | 90.00 | 184 |
2015 | CHEVRON APPALACHIA LLC | 487,779.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 343,653.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 281,180.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 237,640.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 192,861.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 13.78 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,080.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1,249.57 Tons | LANDFILL | 100592 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,012.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,733.10 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,035.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 5,575.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 36.21 Tons | LANDFILL | 100592 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,797.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 23.72 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 14.92 Tons | LANDFILL | 100663 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 3.94 Tons | LANDFILL | 100172 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 39,369.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,830.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 25.62 Tons | LANDFILL | 100280 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 7.85 Tons | RESIDUAL WASTE TRANSFER FACILITY | MID074259565 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,014.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 337.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 467.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 186.67 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,582.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 146.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 33.33 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 35.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 98.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 185.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 383.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2054139 | Primary Facility | 2012-03-26 | Routine/Complete Inspection | No Violations Noted | |
2057906 | Primary Facility | 2012-04-10 | Routine/Complete Inspection | No Violations Noted | |
2077522 | Primary Facility | 2012-06-08 | Drilling/Alteration | No Violations Noted | Horizontal Marcellus, not spudded yet. |
2103704 | Primary Facility | 2012-10-01 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2104067 | Primary Facility | 2012-10-02 | Routine/Complete Inspection | No Violations Noted | Follow up inspection. See inspection report. |
2123140 | Primary Facility | 2012-11-09 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2123144 | Primary Facility | 2012-11-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2188808 | Primary Facility | 2013-08-02 | Routine/Complete Inspection | No Violations Noted | Please refer to inspection # 218802 for observations made at the Plassio Unit on 8/2/2013. |
2210849 | Primary Facility | 2013-09-20 | Routine/Partial Inspection | In Compliance with Policy | Multi-well pad. On-site inspection of drill pit closest to access road. At time of inspection, pit liner had previously been removed with top perimeter of backfilled liner remaining. Pit not backfilled. Surrounded by orange security fence. |
2210858 | Primary Facility | 2013-09-26 | Routine/Partial Inspection | In Compliance with Policy | Multi-well pad. On-site inspection of drill pit closest to access road. |
2244608 | Primary Facility | 2014-02-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The flow back pit located onsite appeared to be in sound condition with the 2' of freeboard. |
2272142 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The Operator was in the process of removing the pit liner of pit #2. NO observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2339169 | Primary Facility | 2015-01-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The Operator appeared to have regraded portions of the site in preparation for restoration. Perimeter control appear to be in place, however the Department cannot verify vegetative growth due to snow cover. The Department suggests the Operator continue to monitor the site weekly, after significant precipitation events and snow melt. |
2474581 | Primary Facility | 2016-04-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2474577 for additional observations made during 4/5/2016 inspection. |
2501016 | Primary Facility | 2016-07-13 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2501011 for additional observations made during 07/13/2016 inspection. |
2524229 | Primary Facility | 2016-09-23 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2524224 for additional observations made during the 9/23/2016 site inspection |
2564840 | Primary Facility | 2017-02-24 | Site Restoration | No Violations Noted | Well drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. |
For data sources see[8]