37-129-28730

Well Details

Well ID: 37-129-28730
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148841
Farm/Lease Name: MATTY-MOMYER UNIT 3H
License Status:
Spud Date:
Permit Date: 2011-12-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.184806
Longitude: -79.721361

For data sources see[1][2][3]

Well History

Date Event
2011-12-23 New Permit Application
2012-05-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-15 2013-02-15 6,902 6,678,605

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC 6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60.0 0.01547
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 0.00773
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.0 0.00129
Clean Volume (gals) Carrier/Base Fluid 89.24 100.0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30.0 0.00759
7.5 Hcl Acid Reagent/PP G Used to open perfs Hydrochloric Acid 7647-01-0 7.5 0.18463
FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30.0 0.03309
Proppant (lbs) Proppant 10.76 4.36691
WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100.0 0.00134
GBW-30 Halliburton Gel Breaker Hemicellulase enzyme 9012-54-8 15.0 0.00008000
Carbohydrates 95.0 0.00048
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.00783
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30.0 None

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 630,681.00 275 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 627,284.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 394,794.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 307,788.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 260,795.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 226,028.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 190,870.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 1,558.66 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 61.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,065.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 10,775.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 24,508.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 30.03 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 2,660.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,174.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 18.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 12,778.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 520.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 2,540.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 35.67 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,195.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 435.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 660.01 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,311.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 57.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 287.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 278.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 442.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 530.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2064918 Primary Facility 2012-05-04 Routine/Complete Inspection No Violations Noted Pre drilling surface E&S inspection. Made changes to the ESCGP1
2065486 Primary Facility 2012-05-07 Routine/Complete Inspection No Violations Noted This was a spud inspection. No issues noted.
2068935 Primary Facility 2012-05-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2070100 Primary Facility 2012-05-21 Drilling/Alteration No Violations Noted SPUDDED
2077513 Primary Facility 2012-06-08 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2085523 Primary Facility 2012-07-11 Drilling/Alteration No Violations Noted 7/11/12 Patterson 339 drilling the Matty-Momyer pad.
2085540 Primary Facility 2012-07-16 Drilling/Alteration No Violations Noted 7/16/2012 Patterson rig 339 still drilling on pad.
2085546 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted 7/18/2012 Running production csg. in the 4H bore hole, and then moving onto the 3H.
2093512 Primary Facility 2012-08-02 Drilling/Alteration No Violations Noted 8/2/2012 Running 5.5 csg. in the 3H bore hole to a depth of 14,031'.
2093635 Primary Facility 2012-08-13 Drilling/Alteration No Violations Noted 8/13/2012 Patterson rig 339 stacked out on pad waiting for the top hole rig to finish up.
2107434 Primary Facility 2012-10-15 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2123115 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted 12/12/2012 waiting on frac.
2159709 Primary Facility 2013-04-19 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2174935 Primary Facility 2013-06-12 Routine/Complete Inspection No Violations Noted Inspection the result of a restoration inspection received by the Department on 06/07/2013. At the time of inspection the well appears to be drilled and stimulated. During the inspection it appeared that the Operator was in the process of flowing back to a pit located onsite. The pit appeared to be in sound condition and had the required 2' of freeboard. The erosion and sedimentation plan was on site and appears to be implemented as designed and all associated BMPs appear to properly installed and functioning. The Department suggests the Operator continue to inspect the site weekly and after significant precipitation events to ensure stability of the site is maintained.
2195297 Primary Facility 2013-08-14 Administrative/File Review Viol(s) Noted & Immediately Corrected Administrative review the result of a restoration extension request submitted to the Department on June 7 2013. During the restoration review process the Department notes that the Operator was approximately 2 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 7/31/2012 making the restoration date 4/31/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame.
2216343 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department notes that the Operator appears to be in the process of regrading the site in preparation for site restoration. The erosion and sedimentation plan was on site and appears to be properly implemented as outlined in the plan. No observation of accelerated erosion or sedimentation in relation the well pad area of access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained.
2228520 Primary Facility 2013-11-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department notes that the Operator appears to be in the process of regrading the site in preparation for site restoration. The erosion and sedimentation plan was on site and appears to be properly implemented as outlined in the plan. No observation of accelerated erosion or sedimentation in relation the well pad area of access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained.
2326834 Primary Facility 2014-12-08 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained.
2376320 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted At the time of inspection the wells appeared to be drilled and equipped for production. Well apparatus, brine tanks and gas production units appear to be in sound condition.
2378655 Primary Facility 2015-06-11 Routine/Complete Inspection No Violations Noted On site inspection with Operator to discuss issues outlined on inspection #2376319. At the time of inspection the wells appeared to be drilled and equipped for production. Well apparatus, brine tanks and gas production units appear to be in sound condition.
2444506 Primary Facility 2016-01-28 Routine/Partial Inspection No Violations Noted Inspection in response to the Operators submission of a "Well Site Restoration Report on 11/26/2014. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed.
2475708 Primary Facility 2016-04-18 Routine/Complete Inspection No Violations Noted Tag, 2 tanks, e&s ok.
2647762 Primary Facility 2017-10-16 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus, brine tanks and gas production units appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
2671941 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2808802 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
2845198 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2195297 675161 08/14/2013 2013-08-14 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative 3216c

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
675161 300895 NOV - Notice of Violation Comply/Closed 2013-10-11
675161 309501 CACP - Consent Assessment of Civil Penalty Comply/Closed 2014-04-07 2014-04-07 $2,000.00 $2,000.00

For data sources see[8]