If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28730 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.184806,"lon":-79.721361,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148841 | |
Farm/Lease Name: MATTY-MOMYER UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-12-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.184806 | |
Longitude: -79.721361 |
Date | Event |
---|---|
2011-12-23 | New Permit Application |
2012-05-09 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-15 | 2013-02-15 | 6,902 | 6,678,605 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC 6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60.0 | 0.01547 | |
1,1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.0 | 0.00773 | |||||
EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5.0 | 0.00129 | ||
Clean Volume (gals) | Carrier/Base Fluid | 89.24 | 100.0 | |||||
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30.0 | 0.00759 | ||
7.5 Hcl Acid | Reagent/PP G | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.18463 | ||
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30.0 | 0.03309 | ||
Proppant (lbs) | Proppant | 10.76 | 4.36691 | |||||
WG-36 | Halliburton | Water Viscosifier | Guar Gum | 9000-30-0 | 100.0 | 0.00134 | ||
GBW-30 | Halliburton | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 15.0 | 0.00008000 | ||
Carbohydrates | 95.0 | 0.00048 | ||||||
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30.0 | 0.00783 | ||
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30.0 | None |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 630,681.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 627,284.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 394,794.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 307,788.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 260,795.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 226,028.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 190,870.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1,558.66 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 61.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,065.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 10,775.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 24,508.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 30.03 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,660.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,174.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 18.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 12,778.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 520.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,540.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 35.67 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,195.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 435.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 660.01 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,311.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 225.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 57.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 287.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 278.50 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 442.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 530.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2064918 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | Pre drilling surface E&S inspection. Made changes to the ESCGP1 |
2065486 | Primary Facility | 2012-05-07 | Routine/Complete Inspection | No Violations Noted | This was a spud inspection. No issues noted. |
2068935 | Primary Facility | 2012-05-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2070100 | Primary Facility | 2012-05-21 | Drilling/Alteration | No Violations Noted | SPUDDED |
2077513 | Primary Facility | 2012-06-08 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2085523 | Primary Facility | 2012-07-11 | Drilling/Alteration | No Violations Noted | 7/11/12 Patterson 339 drilling the Matty-Momyer pad. |
2085540 | Primary Facility | 2012-07-16 | Drilling/Alteration | No Violations Noted | 7/16/2012 Patterson rig 339 still drilling on pad. |
2085546 | Primary Facility | 2012-07-18 | Drilling/Alteration | No Violations Noted | 7/18/2012 Running production csg. in the 4H bore hole, and then moving onto the 3H. |
2093512 | Primary Facility | 2012-08-02 | Drilling/Alteration | No Violations Noted | 8/2/2012 Running 5.5 csg. in the 3H bore hole to a depth of 14,031'. |
2093635 | Primary Facility | 2012-08-13 | Drilling/Alteration | No Violations Noted | 8/13/2012 Patterson rig 339 stacked out on pad waiting for the top hole rig to finish up. |
2107434 | Primary Facility | 2012-10-15 | Routine/Complete Inspection | No Violations Noted | Routine inspection. No issues noted. |
2123115 | Primary Facility | 2012-12-12 | Drilling/Alteration | No Violations Noted | 12/12/2012 waiting on frac. |
2159709 | Primary Facility | 2013-04-19 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2174935 | Primary Facility | 2013-06-12 | Routine/Complete Inspection | No Violations Noted | Inspection the result of a restoration inspection received by the Department on 06/07/2013. At the time of inspection the well appears to be drilled and stimulated. During the inspection it appeared that the Operator was in the process of flowing back to a pit located onsite. The pit appeared to be in sound condition and had the required 2' of freeboard. The erosion and sedimentation plan was on site and appears to be implemented as designed and all associated BMPs appear to properly installed and functioning. The Department suggests the Operator continue to inspect the site weekly and after significant precipitation events to ensure stability of the site is maintained. |
2195297 | Primary Facility | 2013-08-14 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | Administrative review the result of a restoration extension request submitted to the Department on June 7 2013. During the restoration review process the Department notes that the Operator was approximately 2 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 7/31/2012 making the restoration date 4/31/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. |
2216343 | Primary Facility | 2013-10-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department notes that the Operator appears to be in the process of regrading the site in preparation for site restoration. The erosion and sedimentation plan was on site and appears to be properly implemented as outlined in the plan. No observation of accelerated erosion or sedimentation in relation the well pad area of access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained. |
2228520 | Primary Facility | 2013-11-11 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department notes that the Operator appears to be in the process of regrading the site in preparation for site restoration. The erosion and sedimentation plan was on site and appears to be properly implemented as outlined in the plan. No observation of accelerated erosion or sedimentation in relation the well pad area of access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained. |
2326834 | Primary Facility | 2014-12-08 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks, and GPU units located onsite appear to be in sound working condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability in maintained. |
2376320 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the wells appeared to be drilled and equipped for production. Well apparatus, brine tanks and gas production units appear to be in sound condition. |
2378655 | Primary Facility | 2015-06-11 | Routine/Complete Inspection | No Violations Noted | On site inspection with Operator to discuss issues outlined on inspection #2376319. At the time of inspection the wells appeared to be drilled and equipped for production. Well apparatus, brine tanks and gas production units appear to be in sound condition. |
2444506 | Primary Facility | 2016-01-28 | Routine/Partial Inspection | No Violations Noted | Inspection in response to the Operators submission of a "Well Site Restoration Report on 11/26/2014. At the time of inspection earth disturbance activities at the site authorized by the Well Permit are complete, the site has been stabilized and the Post Construction Stormwater Management BMP's have been installed. |
2475708 | Primary Facility | 2016-04-18 | Routine/Complete Inspection | No Violations Noted | Tag, 2 tanks, e&s ok. |
2647762 | Primary Facility | 2017-10-16 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus, brine tanks and gas production units appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. |
2671941 | Primary Facility | 2017-12-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2808802 | Primary Facility | 2018-11-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues. |
2845198 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2195297 | 675161 | 08/14/2013 | 2013-08-14 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative | 3216c |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
675161 | 300895 | NOV - Notice of Violation | Comply/Closed | 2013-10-11 | |||
675161 | 309501 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2014-04-07 | 2014-04-07 | $2,000.00 | $2,000.00 |
For data sources see[8]