X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28757

Well Details

Well ID: 37-129-28757
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148461
Farm/Lease Name: GURKI UNIT 2H
License Status:
Spud Date:
Permit Date: 2012-02-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.286931
Longitude: -79.756525

For data sources see[1][2][3]

Well History

Date Event
2012-02-10 New Permit Application
2012-04-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-09 2013-08-18 8,016 7,720,810

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBW-30 Halliburton Gel Breaker Carbohydrates 87246-72-8 95 0.00037 0
Hemicellulase enzyme 9012-54-8 15 0.00006000 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91.59 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.07979 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03131 0
EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.01484 0
Dibromoacetonitrile 3252-43-5 5 0.00124 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00742 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00707 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00691 0
WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100 0.00117 0
Proppant Chevron Applachia, LLC Proppant Crystalline Silica 14808-60-7 100 8.41 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 159,184.00 28 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 1,483,238.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 853,634.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 415,683.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 357,095.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 291,744.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 263,863.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 47.17 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,346.25 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,128.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drill Cuttings 1,050.89 Tons LANDFILL 100280
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,113.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,742.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 370.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 8.75 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 33,094.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 5,710.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 2.73 Tons LANDFILL 76-00-08
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 12.08 Tons LANDFILL 100280
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 6.80 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2015 CHEVRON APPALACHIA LLC Produced Fluid 2,570.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 600.53 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 931.26 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 2,575.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 305.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 133.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 28.75 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 256.25 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 194.25 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 334.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 457.50 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2060985 Primary Facility 2012-04-19 Routine/Complete Inspection No Violations Noted
2061740 Primary Facility 2012-04-19 Drilling/Alteration No Violations Noted Rocky Mountain Drilling Spudding
2066273 Primary Facility 2012-05-09 Routine/Complete Inspection No Violations Noted Routine inspection. No issues moted.
2068920 Primary Facility 2012-05-03 Drilling/Alteration No Violations Noted Rocky Mountain Drilling Spudding
2082694 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2082695 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2087064 Primary Facility 2012-07-30 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2093610 Primary Facility 2012-08-13 Drilling/Alteration No Violations Noted 8/13/2012 Crown rig 5 drilling on 3H well.
2107746 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2136915 Primary Facility 2013-02-06 Drilling/Alteration No Violations Noted 2/5/2013 Waiting for lateral to be drilled. Inspected w/OGI P. Wyrwas.
2145853 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted 2/28/2013 Patterson 339 rigging up on location.
2146970 Primary Facility 2013-03-11 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2154275 Primary Facility 2013-03-19 Drilling/Alteration No Violations Noted 3/19/2013 Patterson 339 fishing tools out of hole. Depth of 8169'.
2154296 Primary Facility 2013-03-26 Drilling/Alteration No Violations Noted 3/26/2013 Patterson 339 @ depth of 8983', on the 1H.
2165094 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled to total depth. The drill rig was onsite during the inspection and places on secondary containment. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2167541 Primary Facility 2013-05-14 Drilling/Alteration No Violations Noted 5/14/2013 Rig moving off of pad.
2195663 Primary Facility 2013-08-14 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively stimulating the well. The equipment used for stimulation was placed on containment and appeared to in sound condition. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2258949 Primary Facility 2014-03-19 Routine/Complete Inspection No Violations Noted 3/18/2014 Produced fluids tanks diked and GPU's
2272525 Primary Facility 2014-05-21 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Department notes the Operator appears to be treating the water located in pit located on site. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2303476 Primary Facility 2014-09-11 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Department notes the Operator appears to be in the process of restoring the site. The impoundment located onsite has been backfilled.. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2304268 Primary Facility 2014-08-07 Routine/Complete Inspection No Violations Noted 8/7/2014 Closing up pits and reclaiming site. Inspected w/P. Wyrwas.
2328062 Primary Facility 2014-12-10 Routine/Complete Inspection No Violations Noted 12/10/2014 GPU's, produced fluids tanks, reclaimed and vegetated.
2377818 Primary Facility 2015-06-10 Routine/Complete Inspection No Violations Noted 6/10/2015 GPU's, produced fluids tanks, reclaimed and vegetated.
2393451 Primary Facility 2015-07-02 Routine/Complete Inspection No Violations Noted 7/2/2015 GPU's, produced fluids tanks, reclaimed and vegetated.
2439961 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 GPU's, produced fluids tanks, reclaimed and vegetated.
2470498 Primary Facility 2016-03-31 Routine/Partial Inspection No Violations Noted At time of inspection the well was drilled and equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection #2470493 for additional observations made during this inspection.
2522727 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted At time of inspection the well was drilled and equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection # 2522717 for additional observations made during this inspection.
2630318 Primary Facility 2017-08-30 Routine/Complete Inspection No Violations Noted Well drilled snd equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection report #2630316for additional observations related to the well site.

For data sources see[8]

References