37-129-28759

Well Details

Well ID: 37-129-28759
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148461
Farm/Lease Name: GURKI UNIT 4H
License Status:
Spud Date:
Permit Date: 2012-02-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.286981
Longitude: -79.756439

For data sources see[1][2][3]

Well History

Date Event
2012-02-10 New Permit Application
2012-04-19 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-09 2013-08-21 8,056 6,836,510

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.08561 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91.17 0
Proppant Chevron Applachia, LLC Proppant Crystalline Silica 14808-60-7 100 8.83 0
WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100 0.00165 0
GBW-30 Halliburton Gel Breaker Hemicellulase enzyme 9012-54-8 15 0.00008000 0
Carbohydrates 87246-72-8 95 0.00051 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.0327 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00686 0
EC 6116a Nalco Biocide 1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00731 0
Dibromoacetonitrile 3252-43-5 5 0.00122 0
Polyethylene Glycol 25322-68-3 60 0.01463 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00691 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 173,365.00 28 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 1,685,702.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 1,075,950.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 794,999.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 693,995.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 622,481.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 528,174.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 47.18 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,916.25 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,128.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drill Cuttings 1,050.89 Tons LANDFILL 100280
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,113.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 520.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,522.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 370.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 8.75 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 33,094.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 5,710.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 2.73 Tons LANDFILL 76-00-08
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 12.08 Tons LANDFILL 100280
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 6.80 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2015 CHEVRON APPALACHIA LLC Produced Fluid 2,570.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 600.53 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 931.26 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 2,575.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 305.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 133.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 28.75 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid 255.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 194.25 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 334.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 455.00 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2060982 Primary Facility 2012-04-19 Routine/Complete Inspection No Violations Noted
2066275 Primary Facility 2012-05-09 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2068916 Primary Facility 2012-05-03 Drilling/Alteration No Violations Noted Rocky Mountain Drilling Spudding
2082696 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2089564 Primary Facility 2012-08-02 Drilling/Alteration No Violations Noted 8/2/2012 Crown 5 drilling the 3H well.
2093633 Primary Facility 2012-08-13 Drilling/Alteration No Violations Noted 8/13/2012 Crown 5 drilling the 3H well.
2107752 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2136934 Primary Facility 2013-02-06 Drilling/Alteration No Violations Noted 2/5/2013 Waiting for lateral to be drilled. Inspected w/OGI P. Wyrwas.
2145870 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted 2/28/2013 Patterson 339 rigging up on location.
2146972 Primary Facility 2013-03-11 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2154282 Primary Facility 2013-03-19 Drilling/Alteration No Violations Noted 3/19/2013 Patterson 339 fishing tools out of hole. Depth of 8169'.
2154302 Primary Facility 2013-03-26 Drilling/Alteration No Violations Noted 3/26/2013 Patterson 339 @ depth of 8983', on the 1H.
2165097 Primary Facility 2013-05-09 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the well reached total depth on 5/9/2013. The Department reminds the Operator the restoration date will be 9 months from this date, which is 2/9/2014. The drill rig was onsite during the inspection and places on secondary containment. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2167543 Primary Facility 2013-05-14 Drilling/Alteration No Violations Noted 5/14/2013 Rig moving off of pad.
2183354 Primary Facility 2013-07-10 Complaint Inspection No Violations Noted Inspection the result of a complaint filed with the Department on 7/10/2013. The complaint consist of excessive water run off presumed from the well pad and access road adjacent to the land owners property. The landowner also complained of excessive erosion and sedimentation which filled in and series of fish ponds. During the inspection the Department observed what appeared to be a make shift dam made of tires above the fish ponds approximately 75 yards. During the recent significant precipitation event the make shift dam appeared to fail and fill in the fish ponds. The Department also check the perimeter BMPs of the well site. The Department found several small areas that need attention, however they do not appear to be contributing accelerated erosion or sedimentation to the drainage feature holding the fish ponds.
2195665 Primary Facility 2013-08-14 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively stimulating the well. The equipment used for stimulation was placed on containment and appeared to in sound condition. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2258951 Primary Facility 2014-03-19 Routine/Complete Inspection No Violations Noted 3/19/2014 Produced fluids tanks diked and GPU's
2271430 Primary Facility 2014-01-17 Administrative/File Review In Compliance with Policy Administrative inspection the result of a spill reported by the Operator on 1/16/2014. The Operator reported 50 gallons of treated water spilled to the ground. The Operator is currently in compliance with the Departments spill policy.
2271436 Primary Facility 2014-05-19 Administrative/File Review No Violations Noted Administrative inspection the result of the Operators submission of confirmatory analysis of clean up in relation to the spill reported on 1/17/2014 of 50 gallons of treated water.
2272531 Primary Facility 2014-05-21 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Department notes the Operator appears to be treating the water located in pit located on site. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2303482 Primary Facility 2014-09-11 Routine/Complete Inspection No Violations Noted At the time of inspection well appeared to be drilled, stimulated and equipped for production. The Department notes the Operator appears to be in the process of restoring the site. The impoundment located onsite has been backfilled.. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2304294 Primary Facility 2014-08-07 Routine/Complete Inspection No Violations Noted 8/7/2014 Closing up pits and reclaiming site. Inspected w/P. Wyrwas.
2328066 Primary Facility 2014-12-10 Routine/Complete Inspection No Violations Noted 12/10/2014 GPU's, produced fluids tanks, reclaimed and vegetated.
2377824 Primary Facility 2015-06-10 Routine/Complete Inspection No Violations Noted 6/10/2015 GPU's, produced fluids tanks, reclaimed and vegetated.
2393454 Primary Facility 2015-07-02 Routine/Complete Inspection No Violations Noted 7/2/2015 GPU's, produced fluids tanks, reclaimed and vegetated.
2439968 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 GPU's, produced fluids tanks, reclaimed and vegetated.
2470507 Primary Facility 2016-03-31 Routine/Partial Inspection No Violations Noted At time of inspection the well was drilled and equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection #2470493 for additional observations made during this inspection.
2522723 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted At time of inspection the well was drilled and equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection # 2522717 for additional observations made during this inspection.
2556905 Primary Facility 2017-01-30 Routine/Partial Inspection No Violations Noted At time of inspection the well was drilled and equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection # 2556904 for additional observations made during this inspection.
2630320 Primary Facility 2017-08-30 Routine/Complete Inspection No Violations Noted Well drilled snd equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection report #2630316for additional observations related to the well site.

For data sources see[8]