If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28820 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.266144,"lon":-79.751067,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Sewickley Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 145081 | |
Farm/Lease Name: PLASSIO UNIT 8H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-10-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.266144 | |
Longitude: -79.751067 |
Date | Event |
---|---|
2012-10-15 | New Permit Application |
2012-10-29 | Performed Spud Operation |
2013-04-23 | Drilling Completion |
2015-07-24 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-24 | 2013-08-01 | 8,035 | 4,232,310 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.0071 | 0 |
EC 6116a | Nalco | Biocide | 1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00765 | 0 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.0153 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00127 | 0 | ||||
Proppant | Chevron Applachia, LLC | Proppant | Crystalline Silica | 14808-60-7 | 100 | 9.07 | 0 | |
CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.0017 | 0 | |
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.09082 | 0 | |
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | |||
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00003000 | 0 | |
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.03146 | 0 | |
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 90.93 | 0 | |
Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00742 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 294,823.00 | 34 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 1,234,720.00 | 365 | 0.00 | 0 | 90.00 | 184 |
2015 | CHEVRON APPALACHIA LLC | 733,695.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 531,780.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 431,568.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 352,073.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 292,577.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 13.78 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 1,249.57 Tons | LANDFILL | 100592 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,012.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 13,816.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,035.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 4,557.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 36.21 Tons | LANDFILL | 100592 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,797.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 23.72 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 14.92 Tons | LANDFILL | 100663 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 3.94 Tons | LANDFILL | 100172 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 39,369.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,830.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 25.62 Tons | LANDFILL | 100280 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 7.85 Tons | RESIDUAL WASTE TRANSFER FACILITY | MID074259565 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,014.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 337.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 467.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 186.67 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,582.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 146.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 33.33 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 35.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 98.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 185.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 383.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2110315 | Primary Facility | 2012-10-24 | Routine/Complete Inspection | No Violations Noted | Spud inspection, no issues noted. |
2115166 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | Met on site with Chevron. No issues noted. |
2123136 | Primary Facility | 2012-11-09 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2123149 | Primary Facility | 2012-11-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2156469 | Primary Facility | 2013-04-12 | Incident- Response to Accident or Event | No Violations Noted | Inspection the result of a spill reported to the Department on 4/12/2013. The Operator indicated that 2 barrels of drill cuttings were spilled onto containment between the shaker and the drill pit. The Department notes that this spill is in compliance with policy. The Operator was in the process of vacuuming the spilled drill cuttings out of the containment during the inspection. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2188802 | Primary Facility | 2013-08-02 | Routine/Complete Inspection | Pending | At the time of inspection the well has been drilled and stimulated. During the inspection the Operator was in the process of reconfiguring the well site to start flow back. During the inspection the Department observed various holes and tears in the drill pit located adjacent to the well heads. The tears are located in pit labeled #1. The observed holes and tears are located in southeast corner of pit #1. The Department suggest the Operator remove the liquid and solid fractions contained in the pit. Upon removal of pit contents contact the Department to coordinate an inspection of the pit liner. Also during the inspection the Department notes that Operator appears to be using a solidifier and at this time the Department does not have an OG 71 for the addition of solidifiers to drill pit. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2209112 | Primary Facility | 2013-10-01 | Routine/Complete Inspection | Violation(s) Noted | At the time of inspection the well has been drilled and stimulated. The Operator was in the process of equipping the wells for production. The Department notes that the Drill Pit located onsite has been backfilled. The final report addressing the torn pit liner and the subsequent release of pollutional material has been reviewed. The following violations are issued for the Operators failure to detect and address a compromised pit liner, which resulted in a spill to ground and the addition of portland cement to drill cuttings without prior approval. |
2210848 | Primary Facility | 2013-09-20 | Routine/Partial Inspection | In Compliance with Policy | Multi-well pad. On-site inspection of drill pit closest to access road. At time of inspection, pit liner had previously been removed with top perimeter of backfilled liner remaining. Pit not backfilled. Surrounded by orange security fence. |
2210855 | Primary Facility | 2013-09-26 | Routine/Partial Inspection | In Compliance with Policy | Multi-well pad. On-site inspection of drill pit closest to access road. |
2223009 | Primary Facility | 2013-11-18 | Compliance Evaluation | No Violations Noted | CEI addressing the violations written on 10/2/2013 in regards to inspection #2209112, all violations appear to be addressed. The drill pit located on site has been backfilled. The Department notes that the Operator has submitted the requested response to the violations written on 10/2/2013, see attached remarks from Operator. |
2244610 | Primary Facility | 2014-02-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The flow back pit located onsite appeared to be in sound condition with the 2' of freeboard. |
2250089 | Primary Facility | 2013-08-21 | Routine/Partial Inspection | Pending | Routine partial inspection. Photos taken. |
2250094 | Primary Facility | 2013-09-04 | Routine/Partial Inspection | Pending | Routine partial inspection. Photos taken. |
2272143 | Primary Facility | 2014-05-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The Operator was in the process of removing the pit liner of pit #2. NO observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2339170 | Primary Facility | 2015-01-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The Operator appeared to have regraded portions of the site in preparation for restoration. Perimeter control appear to be in place, however the Department cannot verify vegetative growth due to snow cover. The Department suggests the Operator continue to monitor the site weekly, after significant precipitation events and snow melt. |
2474582 | Primary Facility | 2016-04-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2474577 for additional observations made during 4/5/2016 inspection. |
2501018 | Primary Facility | 2016-07-13 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2501011 for additional observations made during 07/13/2016 inspection. |
2524231 | Primary Facility | 2016-09-23 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2524224 for additional observations made during the 9/23/2016 site inspection |
2564841 | Primary Facility | 2017-02-24 | Site Restoration | No Violations Noted | Well drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2209112 | 679523 | 10/01/2013 | 2013-10-01 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative | |
2209112 | 679524 | 10/01/2013 | 2013-10-01 | 78.62 - Improper encapsulation of waste | Administrative | |
2209112 | 679525 | 10/01/2013 | 2013-10-01 | CSL301BYPASS - Industrial waste was discharged without a permit | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
679523 | 302985 | NOV - Notice of Violation | |||||
679523 | 365300 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-03-26 | 2018-03-26 | $9,000.00 | $9,000.00 |
679524 | 302985 | NOV - Notice of Violation | |||||
679524 | 365300 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-03-26 | 2018-03-26 | $9,000.00 | $9,000.00 |
679525 | 302985 | NOV - Notice of Violation | |||||
679525 | 365300 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2018-03-26 | 2018-03-26 | $9,000.00 | $9,000.00 |
For data sources see[8]