37-129-28825

Well Details

Well ID: 37-129-28825
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 144875
Farm/Lease Name: CRAIG LASH UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-11-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.232472
Longitude: -79.732981

For data sources see[1][2][3]

Well History

Date Event
2012-11-29 New Permit Application
2013-01-28 Performed Spud Operation
2013-06-06 Drilling Completion
2013-11-08 Perforation
2016-06-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-11-08 2013-11-11 7,991 1,778,790

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WG-36 Halliburton Water Viscosifier Guar Gum 9000-30-0 100 0.00001331 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91 0
Proppant Halliburton Proppant Crystalline Silica 14808-60-7 100 8.99 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00006735 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.00034047 0
GBW-30 Halliburton Gel Breaker Carbohydrates 87246-72-8 95 0.00000410 0
Hemicellulase enzyme 9012-54-8 15 0.00000065 0
EC 6116a Nalco Biocide 1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00007637 0
Dibromoacetonitrile 3252-43-5 5 0.00001273 0
Polyethylene Glycol 25322-68-3 60 0.00015274 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00007022 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.0008564 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 434,126.00 222 0.00 0 32.50 184
2015 CHEVRON APPALACHIA LLC 424,153.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 307,304.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 255,191.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 221,681.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 191,332.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHEVRON APPALACHIA LLC Drill Cuttings 2,587.69 Tons LANDFILL 100592
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,527.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 8,114.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 6,254.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 700.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 17.60 Tons LANDFILL 100592
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,575.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,133.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 32.50 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 1.80 Tons LANDFILL 100663
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 41,439.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 86.82 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2014 CHEVRON APPALACHIA LLC Drill Cuttings 5.09 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 6.77 Tons LANDFILL 073 114 654
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 5.19 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2015 CHEVRON APPALACHIA LLC Produced Fluid 2,183.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 612.03 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 865.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 55.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 282.50 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 2,365.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 217.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 51.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 230.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 55.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 396.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 66.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CHEVRON APPALACHIA LLC Produced Fluid 360.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2143434 Primary Facility 2013-02-27 Routine/Complete Inspection No Violations Noted Pre-operation inspection. no violations noted
2147909 Primary Facility 2013-03-14 Routine/Complete Inspection No Violations Noted Routine spud inspection. Found Blue-White water in drill cuttings pit.Chevron was made aware of the problem
2149825 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted Moving rig on to location.
2156471 Primary Facility 2013-04-12 Complaint Inspection No Violations Noted Inspection the result of a citizen complaint reported to OGI Jason Brannan on 4/12/2013 at 12:30pm. During the inspection the Operator indicated that the rig was adding a substance called AIRFOAM HD which is a surfactant use to assist the removal of drill cuttings from the horizontal bore. The complaint consist of soap bubbles floating through the air approximately 1000' from the well pad area. The Operator indicated that additional defoamer was added to the drill pit to prevent the bubbles from blowing out of the pit during period of high wind. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2156473 Primary Facility 2013-04-15 Incident- Response to Accident or Event No Violations Noted Inspection the result of a spill reported to the Department on 4/14/2013. The Operator reported approximately 10 gallons of drilling mud spilled onto containments. The Department notes that the Operator in in compliance with policy. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2162329 Primary Facility 2013-04-03 Drilling/Alteration No Violations Noted 4/3/2013 Crown 5 drilling @ depth of 1770'.
2170270 Primary Facility 2013-05-29 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was on site and placed on secondary containment. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2188810 Primary Facility 2013-08-02 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled to total depth, however not stimulated. During the inspection the Operator indicated that site was actively being configured for stimulation. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Operator indicated that the drill pit located on site would be solidified beginning on 8/5/2013. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2241176 Primary Facility 2014-01-31 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated. During the inspection the Department observed the Operator equipping the wells for production. Unable to conduct E&S inspection ground currently covered with snow. The pit located onsite appears to be in sound condition with the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2272129 Primary Facility 2014-04-14 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the Operator appears to be treating the water in the impoundment located onsite. The impoundment has the required 2' of freeboard.
2272132 Primary Facility 2014-05-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes the Operator has Tetra assembling equipment for chemical injection and flow back testing. The impoundment has the required 2' of freeboard. No observation of accelerated erosion or sedimentation in relation to the access road or well pad. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2335192 Primary Facility 2015-01-07 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes the impoundment has been backfilled. No observation of accelerated erosion or sedimentation in relation to the access road or well pad. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2365104 Primary Facility 2015-04-10 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition. The Department notes the Operator is in the process of restoring the site. The impoundments have been backfilled. The perimeters controls were in place and function properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained
2365107 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition. The Operator was in the process of installing the security fencing.
2376306 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appeared to be in sound condition.
2396608 Primary Facility 2015-08-06 Site Restoration No Violations Noted Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
2481663 Primary Facility 2016-05-04 Routine/Partial Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and GPU appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation the well pad or access road.
2613312 Primary Facility 2017-07-10 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
2713176 Primary Facility 2018-04-02 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.

For data sources see[8]