X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28860

Well Details

Well ID: 37-129-28860
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 144564
Farm/Lease Name: BONDI UNIT 1H
License Status:
Spud Date:
Permit Date: 2013-10-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.196975
Longitude: -79.748331

For data sources see[1][2][3]

Well History

Date Event
2013-10-18 New Permit Application
2014-06-02 Performed Spud Operation
2014-09-11 Drilling Completion
2015-03-06 Perforation
2016-06-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-06 2015-03-12 8,027 5,220,020

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 B466 Schlumberger Friction Reducer Alcohol Ethoxylates Proprietary 5 0.0004899 0
Ammonium Acetate 631-61-8 6 0.00058788 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00293939 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00075969 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 89.3319 0
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00150216 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00075108 0
Dibromoacetonitrile 3252-43-5 5 0.00012518 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00033477 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 10.5096 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00081263 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00928658 0
A264 Schlumberger Corrosion Inhibitor Aliphatic acids Proprietary 30 0.00003503 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00003503 0
Methanol 67-56-1 40 0.00004670 0
Prop-2-yn-1-ol 107-19-7 10 0.00001168 0
J580 Schlumberger Gelling Agent, Water Carbohydrate Polymer Proprietary 100 0.0224295 0
J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00109597 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 944,722.00 205 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 1,008,390.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 659,989.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 525,135.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 408,967.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 390.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drill Cuttings 813.85 Tons LANDFILL 100663
2014 CHEVRON APPALACHIA LLC Drill Cuttings 235.11 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Drill Cuttings 64.50 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 10.72 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste 17.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Produced Fluid 12.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 14.16 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,212.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 5,470.25 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 4,320.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 935.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 4.81 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,890.01 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 112.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 458.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 25.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 3,519.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 251.75 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 362.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 56.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 625.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 514.50 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2275494 Primary Facility 2014-06-02 Preoperation Inspection No Violations Noted Pre-drill inspection at the request of the Operator. This inspection fulfills the requirements set forth by Act 13 Section 32.58. At the time of inspection perimeter E&S controls appear to be in sound condition. The Department notes that the site appears to be constructed as outlined in the ESCGP. No observation of accelerated erosion or sedimentation in relation to the access road or well pad area. The Department suggest that the Operator continue to monitor the site weekly and after significant precipitation events to ensure that the well pad and access road remain in stable condition.
2275801 Primary Facility 2014-06-03 Drilling/Alteration No Violations Noted Horizontal Marcellus
2283278 Primary Facility 2014-06-17 Drilling/Alteration No Violations Noted 6/17/2014 rig moved off of pad.
2286158 Primary Facility 2014-06-30 Drilling/Alteration No Violations Noted 6/30/2014 waiting on rig to drill top hole.
2290734 Primary Facility 2014-07-08 Drilling/Alteration No Violations Noted 7/8/2014 Yost 5 drilling at depth of 590'.
2290746 Primary Facility 2014-07-18 Drilling/Alteration No Violations Noted 7/18/2014 Yost 5 drilling on the 4H.
2292317 Primary Facility 2014-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the conductor was set. The drill rig was onsite and placed on containment. The well site appeared to be in stable condition. he Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2293941 Primary Facility 2014-07-24 Drilling/Alteration No Violations Noted 7/24/2014 Yost 5 getting ready to trip drill pipe to run 11 3/4 csg. on the 4H.
2293953 Primary Facility 2014-08-05 Drilling/Alteration No Violations Noted 8/5/2014 Nabors drilling on the 4H.
2304241 Primary Facility 2014-08-08 Drilling/Alteration No Violations Noted 8/8/2014 Nabors X8 drilling on the 4H.
2304260 Primary Facility 2014-09-03 Drilling/Alteration No Violations Noted 9/3/2014 Drilling on 1H
2304747 Primary Facility 2013-09-18 Drilling/Alteration No Violations Noted 9/18/2014 Nabors rig X8 drilling on Bondi 2H. 17bbls cmt return on 5.5" cmt.
2305458 Primary Facility 2014-09-22 Drilling/Alteration No Violations Noted 9/22/2014 Nabors rig X8 drilling on Bondi 2H.
2306192 Primary Facility 2014-09-23 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the well was drilled to total depth. The drill rig was onsite and placed on containment. The well site appeared to be in stable condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2320592 Primary Facility 2014-10-05 Drilling/Alteration No Violations Noted 11/5/2014 Waiting to be stimulated
2328056 Primary Facility 2014-12-04 Drilling/Alteration No Violations Noted 12/4/2014 Waiting to be stimulated
2340771 Primary Facility 2015-01-14 Drilling/Alteration No Violations Noted 1/14/2015 Waiting to be stimulated
2340799 Primary Facility 2015-02-03 Drilling/Alteration No Violations Noted 2/3/2015 Waiting to be stimulated
2358011 Primary Facility 2015-04-02 Routine/Partial/Aerial Inspection No Violations Noted At the time of inspection the Operator was in the process of finishing the stimulation process. The well site and tank pad area appeared to be in sound condition, however see inspection # 2358010 for observations made on the access road in regards to a slip observed. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained.
2362703 Primary Facility 2015-04-20 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appeared to be finished with stimulation, however the well was not equipped for production.
2439953 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 Produced fluids tanks diked and GPU's
2444547 Primary Facility 2016-01-28 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2470518 Primary Facility 2016-03-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2509123 Primary Facility 2016-08-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2509121 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2512601 Primary Facility 2016-08-22 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2512597 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2516755 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516752 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2534618 Primary Facility 2016-10-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 253614 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2568550 Primary Facility 2017-03-07 Site Restoration No Violations Noted At the time of inspection well was drilled. The well apparatus in brine tank to be in sound condition. No observation of accelerated erosion or sedimentation on the well pad or access road.
2585569 Primary Facility 2017-04-18 Complaint Inspection No Violations Noted Inspection conducted in response to complaint (CTS ID 326330). At the time of inspection, well pad site gated and locked. No evidence of a spill and/or earth disturbance relating to a spill. Brine tank appears to be structurally sound, within secondary containment. No visible sheen indicating a spill within secondary containment.
2629652 Primary Facility 2017-08-28 Site Restoration No Violations Noted Well drilled snd equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection report #2629651 for additional observations related to the well site.
2809074 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within earthen dike and appears structurally sound. No E&S issues.
2845591 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References