{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.196892,"lon":-79.748319,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 144564 | |
Farm/Lease Name: BONDI UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-10-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.196892 | |
Longitude: -79.748319 |
Date | Event |
---|---|
2013-10-18 | New Permit Application |
2014-06-06 | Performed Spud Operation |
2014-08-30 | Drilling Completion |
2015-03-13 | Perforation |
2016-06-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-13 | 2015-03-18 | 8,046 | 4,847,160 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | B466 | Schlumberger | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00335237 | 0 |
Ammonium Acetate | 631-61-8 | 6 | 0.00067047 | 0 | ||||
Alcohol Ethoxylates | Proprietary | 5 | 0.00055873 | 0 | ||||
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 89.4951 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 10.3424 | 0 | |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.02345 | 0 | |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00147913 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012326 | 0 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00073957 | 0 | ||||
J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00113696 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00080473 | 0 | |
15% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 15 | 0.00940758 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00075444 | 0 | |
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00033913 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Methanol | 67-56-1 | 40 | 0.00004690 | 0 | |
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003518 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001173 | 0 | ||||
Aliphatic acids | Proprietary | 30 | 0.00003518 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 741,173.00 | 205 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 727,261.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 449,995.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 350,987.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 261,027.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 390.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 813.85 Tons | LANDFILL | 100663 |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 235.11 Tons | LANDFILL | 100172 |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 64.50 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 10.72 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 17.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 12.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 14.16 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,212.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 5,470.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,320.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 935.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil | 0.03 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | CHEVRON APPALACHIA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.03 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | CHEVRON APPALACHIA LLC | Waste Water Treatment Sludge | 4.81 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,890.01 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 112.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 458.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 25.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,519.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 251.75 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 362.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 56.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 405.25 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 509.50 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 30.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2275496 | Primary Facility | 2014-06-02 | Preoperation Inspection | No Violations Noted | Pre-drill inspection at the request of the Operator. This inspection fulfills the requirements set forth by Act 13 Section 32.58. At the time of inspection perimeter E&S controls appear to be in sound condition. The Department notes that the site appears to be constructed as outlined in the ESCGP. No observation of accelerated erosion or sedimentation in relation to the access road or well pad area. The Department suggest that the Operator continue to monitor the site weekly and after significant precipitation events to ensure that the well pad and access road remain in stable condition. |
2275805 | Primary Facility | 2014-06-03 | Drilling/Alteration | No Violations Noted | Horizontal Marcellus |
2283284 | Primary Facility | 2014-06-17 | Drilling/Alteration | No Violations Noted | 6/17/2014 rig moved off of pad. |
2286167 | Primary Facility | 2014-06-30 | Drilling/Alteration | No Violations Noted | 6/30/2014 waiting on rig to drill top hole. |
2290744 | Primary Facility | 2014-07-08 | Drilling/Alteration | No Violations Noted | 7/8/2014 Yost 5 drilling on the 1H. |
2290751 | Primary Facility | 2014-07-18 | Drilling/Alteration | No Violations Noted | 7/18/2014 Yost 5 drilling on the 3H. |
2292320 | Primary Facility | 2014-08-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator indicated the conductor was set. The drill rig was onsite and placed on containment. The well site appeared to be in stable condition. he Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. |
2293950 | Primary Facility | 2014-07-24 | Drilling/Alteration | No Violations Noted | 7/24/2014 Yost 5 getting ready to trip drill pipe to run 11 3/4 csg. on the 4H. |
2293994 | Primary Facility | 2014-08-05 | Drilling/Alteration | No Violations Noted | 8/5/2014 Nabors drilling on the 4H. |
2304251 | Primary Facility | 2014-08-08 | Drilling/Alteration | No Violations Noted | 8/8/2014 Nabors X8 drilling on the 4H. |
2304258 | Primary Facility | 2014-09-03 | Drilling/Alteration | No Violations Noted | 9/3/2014 Drilling on 1H |
2304749 | Primary Facility | 2014-09-18 | Drilling/Alteration | No Violations Noted | 9/18/2014 Nabors rig X8 drilling on Bondi 2H. |
2305463 | Primary Facility | 2014-09-22 | Drilling/Alteration | No Violations Noted | 9/22/2014 Nabors rig X8 drilling on Bondi 2H. |
2306193 | Primary Facility | 2014-09-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator indicated the well was drilled to total depth. The drill rig was onsite and placed on containment. The well site appeared to be in stable condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. |
2320596 | Primary Facility | 2014-10-05 | Drilling/Alteration | No Violations Noted | 11/5/2014 Waiting to be stimulated |
2328058 | Primary Facility | 2014-12-04 | Drilling/Alteration | No Violations Noted | 12/4/2014 Waiting to be stimulated |
2340796 | Primary Facility | 2015-01-27 | Drilling/Alteration | No Violations Noted | 1/14/2015 Waiting to be stimulated |
2340803 | Primary Facility | 2015-02-03 | Drilling/Alteration | No Violations Noted | 2/3/2015 Waiting to be stimulated |
2358012 | Primary Facility | 2015-04-02 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the Operator was in the process of finishing the stimulation process. The well site and tank pad area appeared to be in sound condition, however see inspection # 2358010 for observations made on the access road in regards to a slip observed. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained. |
2358015 | Primary Facility | 2015-04-02 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the Operator was in the process of finishing the stimulation process. The well site and tank pad area appeared to be in sound condition, however see inspection # 2358010 for observations made on the access road in regards to a slip observed. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained. |
2358017 | Primary Facility | 2015-04-02 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the Operator was in the process of finishing the stimulation process. The well site and tank pad area appeared to be in sound condition, however see inspection # 2358010 for observations made on the access road in regards to a slip observed. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site stability is maintained. |
2362706 | Primary Facility | 2015-04-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator appeared to be finished with stimulation, however the well was not equipped for production. |
2439950 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | Produced fluids tanks diked and GPU's |
2444555 | Primary Facility | 2016-01-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2444558 | Primary Facility | 2016-01-28 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2470522 | Primary Facility | 2016-03-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2509126 | Primary Facility | 2016-08-08 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2509121 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2512607 | Primary Facility | 2016-08-22 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2512597 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2516757 | Primary Facility | 2016-08-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516752 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2534621 | Primary Facility | 2016-10-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 253614 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2568874 | Primary Facility | 2017-03-07 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well was drilled. The well apparatus in brine tank to be in sound condition. No observation of accelerated erosion or sedimentation on the well pad or access road. |
2585572 | Primary Facility | 2017-04-18 | Complaint Inspection | No Violations Noted | Inspection conducted in response to complaint (CTS ID 326330). At the time of inspection, well pad site gated and locked. No evidence of a spill and/or earth disturbance relating to a spill. Brine tank appears to be structurally sound, within secondary containment. No visible sheen indicating a spill within secondary containment. |
2629654 | Primary Facility | 2017-08-28 | Site Restoration | No Violations Noted | Well drilled snd equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection report #2629651 for additional observations related to the well site. |
2809080 | Primary Facility | 2018-11-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within earthen dike and appears structurally sound. No E&S issues. |
2845571 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]