If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 224: | Line 224: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-129-28686 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.493305,"lon":-79.565397,"icon":""}]} |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148216 | |
Farm/Lease Name: DEARMITT 1I | |
First Permit Date: 2011-10-18 | |
Last Permit Date: 2012-02-15 | |
Spud Date: 2011-10-28 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.493305 | |
Longitude: -79.565397 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2017485 | 2011-10-28 | No Violations Noted | Spud in 10-28-11 | |
2018503 | 2011-11-10 | No Violations Noted | Waiting on rig to commence tophole drilling. Flowback pit lined and freeboard maintained. Inspection conducted w/OGI S. Banks. | |
2028453 | 2011-12-16 | No Violations Noted | Waiting on rig to commence tophole drilling. Flowback pit lined and freeboard maintained. Inspection conducted w/OGI J. Olson. | |
2033320 | 2012-01-10 | No Violations Noted | Waiting on rig to commence tophole drilling. Flowback pit lined and freeboard maintained. | |
2064172 | 2012-04-27 | No Violations Noted | Waiting on rig to commence lateral drilling. Flowback pit lined and freeboard maintained. | |
2075747 | 2012-06-11 | No Violations Noted | At the time of inspection the Operator indicated the 1I well was actively being drilled. The Operator also indicated that this well was drilled. The site appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the access road or well pad area. The pits located onsite appear to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. | |
2115645 | 2012-11-14 | No Violations Noted | Nov violations noted | |
2127474 | 2013-01-03 | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The associated well apparatus, brine tanks and production heaters appear to be in sound condition. During the inspection the Erosion and Sedimentation plan was on site and appears to be functioning properly. All BMP's were properly installed and maintained and the site was temporarily stabilized. The associated impoundment appears to be in sound condition with the required 2 feet of freeboard. No observation of accelerated erosion and sedimentation in relation to the access road or well pad area. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability is maintained. | |
2131652 | 2013-01-15 | No Violations Noted | Inspection the result of a restoration extension received by the Department on 1/10/2013. At the time of inspection the site appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the permit area. The E & S plan was on site and appeared to properly implemented and maintained as outlined in the plan. The Department also notes that the site has sufficient vegetative grown established on the areas of earth disturbance to stabilize the site through the extension request period. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 367179.0 | 73.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 28.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-1 | DRILL CUTTINGS | 155.31 | Tons | LANDFILL | 06-08438 | APEX SANITARY LANDFILL | AMSTERDAM | OH |
2012-1 | DRILL CUTTINGS | 654.41 | Tons | LANDFILL | PAD004835146 | MAX ENVIRONMENTAL TECHNOLOGIES - YUKON FACILITY | YUKON | PA |
2012-1 | DRILLING FLUID WASTE | 144.57 | Bbl | LANDFILL | 0250050885 | SOIL REMEDIATION INC. (SRI) | LOWELLVILLE | OH |
2012-1 | DRILL CUTTINGS | 588.8 | Tons | LANDFILL | 100280 | USA VALLEY FACILITY, INC | IRWIN | PA |
2012-1 | DRILLING FLUID WASTE | 1101.52 | Bbl | LANDFILL | 100280 | USA VALLEY FACILITY, INC | IRWIN | PA |