X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23185"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-099-23185
 
| Well ID: 34-099-23185
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.012725245, -80.54326200 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.01, -80.54 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 2012-12-16
 
| Final Drill Date: 2012-12-16
 
|-
 
|-
| Well Total Depth: 8110 ft
+
| Well Total Depth: 8110.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 41.012725245
+
| Latitude: 41.010000
 
|-
 
|-
| Longitude: -80.54326200
+
| Longitude: -80.540000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 89: Line 89:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 100: Line 100:
 
|-
 
|-
 
| 2014-03-21
 
| 2014-03-21
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 108: Line 118:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 209: Line 219:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 226: Line 236:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1067903260
 +
| 2013-2-11 0:00:
 +
| AM
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -1579760454
 +
| 2012-11-26 0:00
 +
| DD
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -1810388581
 +
| 2013-1-8 0:00:0
 +
| DD
 +
| No Violations
 +
| 4.00
 +
|-
 +
| -1893672905
 +
| 2015-9-28 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1928793687
 +
| 2013-1-27 0:00:
 +
| DD
 +
| No Violations
 +
| 6.50
 +
|-
 +
| -222478944
 +
| 2013-2-6 0:00:0
 +
| DD
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -28158097
 +
| 2014-5-6 0:00:0
 +
| PL
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -294563574
 +
| 2018-6-27 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -301092209
 +
| 2013-6-26 0:00:
 +
| UP
 +
| No Violations
 +
| 3.00
 +
|-
 +
| -313207261
 +
| 2012-11-28 0:00
 +
| DD
 +
| No Violations
 +
| 3.00
 +
|-
 +
| -501409573
 +
| 2013-2-28 0:00:
 +
| DD
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -584893553
 +
| 2013-4-30 0:00:
 +
| DD
 +
| No Violations
 +
| 2.00
 +
|-
 +
| -878435706
 +
| 2017-1-13 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -911802757
 +
| 2013-2-12 0:00:
 +
| DD
 +
| No Violations
 +
| 2.00
 
|-
 
|-
 
| 0028158097
 
| 0028158097
Line 400: Line 494:
 
| No Violations
 
| No Violations
 
| I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
 
| I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
 +
|-
 +
| 1576247231
 +
| 2019-12-3 0:00:
 +
| PW
 +
| No Violations
 +
| 1.00
 
|-
 
|-
 
| 1579760454
 
| 1579760454
Line 406: Line 506:
 
| No Violations
 
| No Violations
 
| I performed a status check on the above drilling location at present there are drilling at 210.  Drilling was very slow rig had encountered hard material. I walked the location, all containment is in place. No violations at this time. Drilling permit is posted.
 
| I performed a status check on the above drilling location at present there are drilling at 210.  Drilling was very slow rig had encountered hard material. I walked the location, all containment is in place. No violations at this time. Drilling permit is posted.
 +
|-
 +
| 162106571
 +
| 2013-4-22 0:00:
 +
| CT
 +
| No Violations
 +
| 2.00
 
|-
 
|-
 
| 1654203848
 
| 1654203848
Line 462: Line 568:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 15:55, 12 January 2021

Well Details

Well ID: 34-099-23185
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000621
Farm/Lease Name: POLAND-CLL1
License Status: Plugged Back
License Date: 2012-12-14
Spud Date: 2012-11-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2012-12-16
Well Total Depth: 8110.00 ft
Configuration: Vertical
Latitude: 41.010000
Longitude: -80.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-17 Proposed Formations:POINT PLEASANT, Issued Date:9/17/2012, Expired Date:9/17/2014 12:00:00 PM, Drilling unit acres:159.13, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-10-24 Proposed Formations:POINT PLEASANT, Issued Date:10/24/2012, Expired Date:10/24/2014 12:00:00 PM, Drilling unit acres:356.31, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-12-14 Proposed Formations:TRENTON, Issued Date:12/14/2012, Expired Date:12/14/2014 12:00:00 PM, Drilling unit acres:356.31, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-12-16
Plugged Back 2012-12-18
Plugged/Abandoned 2013-01-09
Completion Report Received 2013-03-25
Construction Permit Expires 2013-12-14
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-03-21 0 0
0 0
0 0

For data sources see[3]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 HILCORP ENERGY COMPANY Brine 17486 218
2014 HILCORP ENERGY COMPANY Brine 21671 359
2015 HILCORP ENERGY COMPANY Brine 14779 328
2016 HILCORP ENERGY COMPANY Brine 14017 362
2017 HILCORP ENERGY COMPANY Brine 13224 363
2018 HILCORP ENERGY COMPANY Brine 11972 361
2019 HILCORP ENERGY COMPANY Brine 3248 90

For data sources see[4] [5]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1067903260 2013-2-11 0:00: AM No Violations 2.00
-1579760454 2012-11-26 0:00 DD No Violations 2.00
-1810388581 2013-1-8 0:00:0 DD No Violations 4.00
-1893672905 2015-9-28 0:00: PW No Violations 1.00
-1928793687 2013-1-27 0:00: DD No Violations 6.50
-222478944 2013-2-6 0:00:0 DD No Violations 2.00
-28158097 2014-5-6 0:00:0 PL No Violations 1.00
-294563574 2018-6-27 0:00: PW No Violations 1.00
-301092209 2013-6-26 0:00: UP No Violations 3.00
-313207261 2012-11-28 0:00 DD No Violations 3.00
-501409573 2013-2-28 0:00: DD No Violations 2.00
-584893553 2013-4-30 0:00: DD No Violations 2.00
-878435706 2017-1-13 0:00: PW No Violations
-911802757 2013-2-12 0:00: DD No Violations 2.00
0028158097 2014-05-06 Preliminary Restoration No Violations I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration is passed.
0162106571 2013-04-22 Completion Testing No Violations I was on location to perform a status check. At present Schlumberger Well Service is fracing. The location is clean of all debris. There is barrels on location for oily gloves and rags. Fire extinguishers are at various location. Water trucks are vacuuming water from condiment. All safety signs are posted. No noted violations at this time.
0222478944 2013-02-06 Drill / Deepen / Reopen No Violations I was on location to look at their manifest to see if Mohawk Services ( D&L) had hauled any water or drilling material from this location. I did not see any manifest for Mohawk.
0294563574 2018-06-27 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
0301092209 2013-06-26 UrbanProduction Wells No Violations I was onsite to check the status of this production well. The wellhead is assembled and a gas buster is nearby. Currently the well is producing into the new production facilities on location. A large compressor station has also been installed. A new pipeline has been installed on the location and will flow to a processing plant south of the location Trumbul construction is also unloading equipment to the location at this time. There are no violations at this time.
0313207261 2012-11-28 Drill / Deepen / Reopen No Violations I performed a status an the above location. I went into the office to meet with Tom Chec Drilling Consultant for Hilcorp to see when the surface job was coming up. The drilling permit stated that we needed to set approx. 870 of 13 3/8 conductor or 50 below the Berea and cemented to surface. Tom looked at his drilling program and it stated that he needed to set 1440 of 13 3/8 conductor, he called his supervisor in Houston Texas, they had made a mistake in recording there evelation numbers.
0501409573 2013-02-28 Drill / Deepen / Reopen No Violations On 2/28/2013, Inspector Kevin Perry and myself was on location. We walked around the location and inspected the containments all were in good conditions. There were barrels with lids around the location for soiled gloves and rags. They are moving some equipment in to start their 2nd frac stage..
0584893553 2013-04-30 Drill / Deepen / Reopen No Violations I was on location to check the status of the well and the production facility being built for the pad location. The well is currently being tested by Schlumberger while a compressor station is being built to connect to the newly laid pipeline. It is estimated 8-10 wells could be drilled on this location in the future.
0878435706 2017-01-13 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
0911802757 2013-02-12 Drill / Deepen / Reopen No Violations I was on location. The drilling rig H&P 225 has completed the move from this location, There are some roll-off boxes with rig material on location. They are moving some equipment in to start fracing on 2/15/2013.
1067903260 2013-02-11 Administrative Inspection No Violations I was on location to check the condition of the location following the rig leaving. Frac lines have currently been run for the water supply and the site is being used for storage of company man trailers. A pipeline is also being built to the location through Poland, leading to a processing plant in Columbiana. There are no violations at this time.
1098444232 2017-06-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit located at the central pad. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
1202477816 2018-11-06 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
1351516444 2012-10-09 Urban Drill / Deepen / Reopen No Violations On 10/9/2012, Inspector Fred Romeo and myself conducted a Pre-Site Permit Inspection on the above location. At the location we met with Hugh Gregorcky, Construction Superintendent for Hilcorp, David E. Mostoller and B. J. Batterson with RETTEW Environmental Services. We looked over the construction plans and drilling pad location plans. This area is possible a fill from the mining of limestone. This is an Urban Location.
1353345509 2012-11-18 Drill / Deepen / Reopen No Violations Pro- Energy drilled a 26 hole to a depth of 149, They ran a total of 80 of 20 94# conductor casing. Nabors Completion Services was on location to cement the conductor with 480 sacks of class A cement. Good cement returns to surface.
1354399090 2012-12-01 Urban Drill / Deepen / Reopen No Violations I was onsite for the cementing of the surface casing. Franks casing crew was having issues getting the casing into the hole, they also encountered several bad joints that needed to be removed and replaced. The rig circulated on the hole for .5 hours and did not see any gains or losses during circulation. A total of 49.5 barrels of cement came back to surface during the job.
1354550222 2012-11-20 Drill / Deepen / Reopen No Violations I was on location meeting with the Drilling Consultants during rig move and the installation of the containment around the drilling location.
1356105354 2012-12-07 Drill / Deepen / Reopen No Violations On 12/7/2012, I was on location and performed an inspection on the above location all containment is in good condition around the drilling rig, frac tanks and fuel tanks. Location is clean. Fire extinguisher are in clear view around various locations of the rig. No violation noted at this time.
1356106561 2012-12-08 Drill / Deepen / Reopen No Violations On 12/8 2012, I received a phone call at 20:00 hour from Tom Cheh Drilling Consultant for Hilcorp Energy on H&P Drilling Rig 225, that they had to switch from air to fluid they had gas reading in 5900/6000 they had a flair, they used 10.2# mud to kill the flair. The depth was around 5700 ( Clinton formation ). They will continue to drill on fluid to Total Depth 8000.
1356357119 2012-12-14 Drill / Deepen / Reopen No Violations On 12/14 2012, I performed a status check on the above location I met with Tom Cheh Drilling Consult for Hilcorp, we walked the location. They are drilling at a depth of 6750at this time. No violation were noted at this time.
1356550129 2012-12-26 Drill / Deepen / Reopen No Violations I was onsite to check the status of the drilling of the drilling rig. They are currently pulling out of the hole to change bits at their current depth of 13338 feet. They are intending to continue drilling tonight to a total depth of around 17000 feet. They are expecting production casing to be coming into tomorrow on semi truck as long as the weather does not limit travel. There are no violations at this time.
1357922687 2013-01-09 Plug / Plug Back No Violations I was onsite to witness the second kick off plug set on this well. A Baker Hughes inflatable packer was set at 7487 to allow for a 500 cement kickoff plug to be set on top of it. There were issues with unlatching from the packer because they could not get enough torque on the packer to properly unlatch. A wire line truck with a chemical cutter was being called out for the job but they were able to unlatch on a final attempt. They pumped 25 barrels of Tuned Spacer, 226 sacks of Densecem at 16.8 lb/gal and 1.02 yield. They followed this with 5 barrels of Tuned Spacer and displaced with 109 barrels of freshwater.
1358956334 2012-12-31 Drill / Deepen / Reopen No Violations I was on site to meet with Bill Mitchell Drill Consultant for Hilcorp Energy H&P Rig 225. We talked about the 5.5 production casing that they will be running and their cementing procedure. I inspected the location and all containment is in place. The drilling area is clear of spills. The there are fire extinguisher around various locations of the drilling rig.
1359140475 2013-01-08 Drill / Deepen / Reopen No Violations When I arrived on location they were pulling their drill pipe out and getting ready to run the Weatherford Inflatable bridge plug. Bill Mitchell and I talked with the Weatherford Personal about the installation. They informed me that they would be ready in the evening. I instructed them that I would be on location at 6:00 pm.
1363720309 2013-03-08 Surface Facility Construction No Violations I was in the Uniontown Office, when Wendy Booth told me that she had received a compliant call from an anonymous caller, stating that someone in a large truck was dumping brine in a field by his house. When I called the person back he said that they were backing into a field an dumping. When I arrived at the location on Arrel Road east of Struthers Rd. I could see a water truck ( Haas Environmental Svc.) in the field. I spoke to Butch Peterson Superintendent for Southeast Horizontal Drilling, he said that they were moving fresh water boring fluid from the receiving side and taking it to the boring side and reusing it. This pipeline is for the Poland CLL1 1AH well. No violation at this time.
1365090978 2013-04-04 Urban Drill / Deepen / Reopen No Violations I was onsite to check the status of the hydraulic fracturing of the well. Currently the coiled tubing is being run into the well and the Schlumberger frac operations trucks are set on in place on location. They estimate to get back to the frac job later tonight. There are no violations at this time.
1369790224 2014-12-26 Production Wells No Violations I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
1372287878 2013-06-26 UrbanProduction Wells No Violations I was onsite to check the status of this production well. The wellhead is assembled and a gas buster is nearby. Currently the well is producing into the new production facilities on location. A large compressor station has also been installed. A new pipeline has been installed on the location and will flow to a processing plant south of the location Trumbul construction is also unloading equipment to the location at this time. There are no violations at this time.
1447341966 2015-11-02 Production Wells No Violations I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
1576247231 2019-12-3 0:00: PW No Violations 1.00
1579760454 2012-11-26 Drill / Deepen / Reopen No Violations I performed a status check on the above drilling location at present there are drilling at 210. Drilling was very slow rig had encountered hard material. I walked the location, all containment is in place. No violations at this time. Drilling permit is posted.
162106571 2013-4-22 0:00: CT No Violations 2.00
1654203848 2014-04-16 Production Wells No Violations I performed a status check on the above location. There is fifty 500 barrel frac tanks on this location that was used as nurse tanks that were used in fracing the well on Poland CLL Pad 2. All tanks are in containment. Wellhead is protected by large concrete barriers. ID signs are posted. No noted violations at this time.
1782668337 2012-01-07 Drill / Deepen / Reopen No Violations I was notified of a problem on 1/7/2013 at 8:30 am by Bill Mitchell, Drilling Consultant for Hilcorp Energy, H&P Rig 225 after running 17,400 of 5.5 production casing in a 8.625 well bore. Halliburton Services installed their cement head and tryed break circulation. They pressured up to 5000 psi., shut down pulled 4 joints of production casing out and tried it again but could not break circulation at 5000 psi., Hilcorps Drilling Engineers instructed them to pull the 5.5 casing out, they pulled 16156 of 5.5 casing before getting stuck in the well bore. They used a chemical cutter to cut the casing at 7497 that left 1244 of 5.5 casing in the well bore. I notified Deputy Chief Robert Worstall and Steve Opritza of this, after a discussion with Hilcorp Energy they are gone back in the well bore and make a cleaning sweep before setting a Weatherford Inflatable bridge plug at 7497 and a 500 cement kick plug above that and build another kick off. There is a drawing of this in the well file.
1810388581 2013-01-08 Drill / Deepen / Reopen No Violations I arrived on location to witness the setting of the Weatherford Inflatable Packer and the cementing of a 500 plug. H&P Rig 225 ran drill pipe and tubing in the well to set the packer at 7497. The packer was to be set in three stages, starting with 500 psi and holding for 15 minutes, then with 800 psi and holding for 15 minutes, then the last with 1200 psi and holding 15 minutes and then evacuating the pressure. The packer would not set. This was tried several times. The decision was made to pull the drill pipe and packer back out of the well. They will call with there new plans.
1893672905 2015-09-28 Production Wells No Violations I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time.
1916416709 2015-06-17 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed
1928793687 2013-01-27 Drill / Deepen / Reopen No Violations On 1/27/2013, H&P Rig 225 cemented 17381 P-110 5.5 20# casing
2136307355 2013-08-26 UrbanProduction Wells No Violations I was onsite to perform an inspection on the urban production well. The wellhead was currently producing and the gas is being flowed to a production facility. Currently a compressor is onsite running to push the gas to the sales lines.

For data sources see[6]

References