X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0535172010000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0535172010000
 
| Well ID: 0535172010000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.592496, -116.469802 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.592496, -116.469802 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-20-053-17W5/0
 
| Location: 00/10-20-053-17W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-20-053-17 W5/00
 
| Location Alias 2: 00/10-20-053-17 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 053
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 17
 +
|-
 +
| Section: 20
 
|-
 
|-
 
| County/Municipality: [[Edson,_Alberta|Edson]]
 
| County/Municipality: [[Edson,_Alberta|Edson]]
Line 17: Line 27:
 
| Well Name: ECA EDSON 10-20-53-17
 
| Well Name: ECA EDSON 10-20-53-17
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Ovintiv Canada ULC]]
 
|-
 
|-
 
| License Number: 0124375
 
| License Number: 0124375
Line 29: Line 39:
 
| Final Drill Date: 1986-12-07
 
| Final Drill Date: 1986-12-07
 
|-
 
|-
| Well Total Depth: 2235 m
+
| Well Total Depth: 2235.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.592496
 
| Surface Hole Latitude: 53.592496
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1986-11-13
 +
| Obtained License
 +
|-
 +
| 1986-11-20
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1986-11-21
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 1986-12-07
 +
| Finished Drilling
 +
|-
 +
| 1986-12-07
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1986-12-08
 +
| Well Log Performed
 +
|-
 +
| 1986-12-09
 +
| Well Log Performed
 +
|-
 +
| 1986-12-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 1986-12-10
 +
| Rig Released
 +
|-
 +
| 1986-12-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-12-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-01-02
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-01-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-01-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1987-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-01-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-02-19
 +
| Well Began Production
 +
|-
 +
| 1987-02-19
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1987-02-19
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1997-03-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1997-03-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1998-06-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-06-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2004-05-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2004-05-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2006-11-20
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2006-11-20
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2006-11-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-11-22
 +
| Plug Back Performed
 +
|-
 +
| 2006-11-22
 +
| Well Log Performed
 +
|-
 +
| 2006-11-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-11-23
 +
| Well Log Performed
 +
|-
 +
| 2006-11-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-11-24
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-11-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-11-25
 +
| Well Log Performed
 +
|-
 +
| 2006-11-26
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-11-26
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-11-27
 +
| Well Abandoned
 +
|-
 +
| 2006-11-27
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2006-11-27
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 219:
 
| 1986-12-29
 
| 1986-12-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2156
+
| style="text-align: right;" | 2156.00
| style="text-align: right;" | 2158
+
| style="text-align: right;" | 2158.00
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2152
 
| style="text-align: right;" | 2154
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2141
 
| style="text-align: right;" | 2146
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2130
 
| style="text-align: right;" | 2130
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2123
 
| style="text-align: right;" | 2125
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2118
 
| style="text-align: right;" | 2120
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-29
 
| Perforation
 
| style="text-align: right;" | 2103
 
| style="text-align: right;" | 2105
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-12-30
 
| 1986-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2096
+
| style="text-align: right;" | 2188.00
| style="text-align: right;" | 2100
+
| style="text-align: right;" | 2190.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-12-30
 
| 1986-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2075
+
| style="text-align: right;" | 2174.00
| style="text-align: right;" | 2089
+
| style="text-align: right;" | 2178.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-12-30
 
| 1986-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2188
+
| style="text-align: right;" | 2171.00
| style="text-align: right;" | 2190
+
| style="text-align: right;" | 2172.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-12-30
 
| 1986-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2174
+
| style="text-align: right;" | 2060.50
| style="text-align: right;" | 2178
+
| style="text-align: right;" | 2063.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-12-30
 
| 1986-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2171
+
| style="text-align: right;" | 2055.00
| style="text-align: right;" | 2172
+
| style="text-align: right;" | 2059.00
| style="text-align: right;" | 13
 
|-
 
| 1986-12-30
 
| Perforation
 
| style="text-align: right;" | 2060.5
 
| style="text-align: right;" | 2063
 
| style="text-align: right;" | 13
 
|-
 
| 1986-12-30
 
| Perforation
 
| style="text-align: right;" | 2055
 
| style="text-align: right;" | 2059
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-01-02
 
| 1987-01-02
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2055
+
| style="text-align: right;" | 2055.00
| style="text-align: right;" | 2190
+
| style="text-align: right;" | 2190.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-01-07
 
| 1987-01-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2075
+
| style="text-align: right;" | 2075.00
| style="text-align: right;" | 2146
+
| style="text-align: right;" | 2146.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-01-13
 
| 1987-01-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2034
+
| style="text-align: right;" | 2034.00
| style="text-align: right;" | 2042
+
| style="text-align: right;" | 2042.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-01-13
 
| 1987-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1911
+
| style="text-align: right;" | 1911.00
| style="text-align: right;" | 1915
+
| style="text-align: right;" | 1915.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-01-15
 
| 1987-01-15
| Fracture  
+
| Fracture
| style="text-align: right;" | 1911
+
| style="text-align: right;" | 1911.00
| style="text-align: right;" | 1915
+
| style="text-align: right;" | 1915.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2152.00
 +
| style="text-align: right;" | 2154.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-11-22
 
| 2006-11-22
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1896.8
+
| style="text-align: right;" | 1896.80
| style="text-align: right;" | 1904.8
+
| style="text-align: right;" | 1904.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-23
 
| 2006-11-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 995
+
| style="text-align: right;" | 995.00
| style="text-align: right;" | 996
+
| style="text-align: right;" | 996.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-11-24
 
| 2006-11-24
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 995
+
| style="text-align: right;" | 995.00
| style="text-align: right;" | 996
+
| style="text-align: right;" | 996.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-24
 
| 2006-11-24
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 737
+
| style="text-align: right;" | 737.00
| style="text-align: right;" | 996
+
| style="text-align: right;" | 996.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-25
 
| 2006-11-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
| style="text-align: right;" | 611
+
| style="text-align: right;" | 611.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2006-11-26
 
| 2006-11-26
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 610
+
| style="text-align: right;" | 610.00
| style="text-align: right;" | 611
+
| style="text-align: right;" | 611.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-26
 
| 2006-11-26
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 510
+
| style="text-align: right;" | 510.00
| style="text-align: right;" | 611
+
| style="text-align: right;" | 611.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2141.00
 +
| style="text-align: right;" | 2146.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2130.00
 +
| style="text-align: right;" | 2130.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2123.00
 +
| style="text-align: right;" | 2125.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2118.00
 +
| style="text-align: right;" | 2120.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-29
 +
| Perforation
 +
| style="text-align: right;" | 2103.00
 +
| style="text-align: right;" | 2105.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-30
 +
| Perforation
 +
| style="text-align: right;" | 2096.00
 +
| style="text-align: right;" | 2100.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-12-30
 +
| Perforation
 +
| style="text-align: right;" | 2075.00
 +
| style="text-align: right;" | 2089.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 232: Line 377:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 265: Line 424:
 
| 1987
 
| 1987
 
| style="text-align: right;" | 3815
 
| style="text-align: right;" | 3815
| style="text-align: right;" | 1749.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 271: Line 430:
 
| 1988
 
| 1988
 
| style="text-align: right;" | 6938
 
| style="text-align: right;" | 6938
| style="text-align: right;" | 1496.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1989
 
| 1989
 
| style="text-align: right;" | 2426
 
| style="text-align: right;" | 2426
| style="text-align: right;" | 358.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1990
 
| 1990
 
| style="text-align: right;" | 1248
 
| style="text-align: right;" | 1248
| style="text-align: right;" | 465.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 289: Line 448:
 
| 1991
 
| 1991
 
| style="text-align: right;" | 1226
 
| style="text-align: right;" | 1226
| style="text-align: right;" | 385.7
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 295: Line 454:
 
| 1992
 
| 1992
 
| style="text-align: right;" | 900
 
| style="text-align: right;" | 900
| style="text-align: right;" | 351.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 301: Line 460:
 
| 1993
 
| 1993
 
| style="text-align: right;" | 6234
 
| style="text-align: right;" | 6234
| style="text-align: right;" | 415.8
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 8.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
 
| style="text-align: right;" | 8747
 
| style="text-align: right;" | 8747
| style="text-align: right;" | 638.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 313: Line 472:
 
| 1995
 
| 1995
 
| style="text-align: right;" | 8242
 
| style="text-align: right;" | 8242
| style="text-align: right;" | 385.9
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 319: Line 478:
 
| 1996
 
| 1996
 
| style="text-align: right;" | 1840
 
| style="text-align: right;" | 1840
| style="text-align: right;" | 37.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 325: Line 484:
 
| 1998
 
| 1998
 
| style="text-align: right;" | 216
 
| style="text-align: right;" | 216
| style="text-align: right;" | 1.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 333: Line 492:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 348: Line 507:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:00, 17 January 2021

Well Details

Well ID: 0535172010000
Loading map...
Location: 00/10-20-053-17W5/0
Location Alias: 00/10-20-53-17 W5M
Location Alias 2: 00/10-20-053-17 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 17
Section: 20
County/Municipality: Edson
Well Name: ECA EDSON 10-20-53-17
Operator Name: Ovintiv Canada ULC
License Number: 0124375
License Date: 1986-11-13
License Status: Abandoned
Spud Date: 1986-11-19
Final Drill Date: 1986-12-07
Well Total Depth: 2235.00 m
Surface Hole Latitude: 53.592496
Surface Hole Longitude: -116.469802

For data sources see[1][2]

Well History

Date Event
1986-11-13 Obtained License
1986-11-20 Surface Casing Operation Performed
1986-11-21 Intermediate Casing Operation Performed
1986-12-07 Finished Drilling
1986-12-07 Well Mode changed to Drilled and Cased
1986-12-08 Well Log Performed
1986-12-09 Well Log Performed
1986-12-10 Production Casing Operation Performed
1986-12-10 Rig Released
1986-12-29 Perforation Treatment Performed - Jet Perforation
1986-12-30 Perforation Treatment Performed - Jet Perforation
1987-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-01-13 Perforation Treatment Performed - Jet Perforation
1987-01-15 Perforation Treatment Performed - Fractured
1987-02-19 Well Began Production
1987-02-19 Well Fluid changed to Crude Oil
1987-02-19 Well Mode changed to Pumping
1997-03-01 Well Fluid changed to Crude Oil
1997-03-01 Well Mode changed to Suspended
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Flowing
2004-05-01 Well Fluid changed to Crude Oil
2004-05-01 Well Mode changed to Suspended
2006-11-20 Well Fluid changed to Crude Oil
2006-11-20 Well Mode changed to Abandoned Zone
2006-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-22 Plug Back Performed
2006-11-22 Well Log Performed
2006-11-23 Perforation Treatment Performed - Jet Perforation
2006-11-23 Well Log Performed
2006-11-24 Perforation Treatment Performed - Cement Plug
2006-11-24 Perforation Treatment Performed - Remedial Casing
2006-11-25 Perforation Treatment Performed - Jet Perforation
2006-11-25 Well Log Performed
2006-11-26 Perforation Treatment Performed - Cement Plug
2006-11-26 Perforation Treatment Performed - Remedial Casing
2006-11-27 Well Abandoned
2006-11-27 Well Fluid changed to Crude Oil
2006-11-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-29 Perforation 2156.00 2158.00 13
1986-12-30 Perforation 2188.00 2190.00 13
1986-12-30 Perforation 2174.00 2178.00 13
1986-12-30 Perforation 2171.00 2172.00 13
1986-12-30 Perforation 2060.50 2063.00 13
1986-12-30 Perforation 2055.00 2059.00 13
1987-01-02 Acid Treatment 2055.00 2190.00 0
1987-01-07 Acid Treatment 2075.00 2146.00 0
1987-01-13 Packing Device Capped w/Cement 2034.00 2042.00 0
1987-01-13 Perforation 1911.00 1915.00 13
1987-01-15 Fracture 1911.00 1915.00 0
1986-12-29 Perforation 2152.00 2154.00 13
2006-11-22 Packing Device Capped w/Cement 1896.80 1904.80 0
2006-11-23 Perforation 995.00 996.00 17
2006-11-24 Remedial Casing Cementing 995.00 996.00 0
2006-11-24 Cement Plug 737.00 996.00 0
2006-11-25 Perforation 610.00 611.00 17
2006-11-26 Remedial Casing Cementing 610.00 611.00 0
2006-11-26 Cement Plug 510.00 611.00 0
1986-12-29 Perforation 2141.00 2146.00 13
1986-12-29 Perforation 2130.00 2130.00 13
1986-12-29 Perforation 2123.00 2125.00 13
1986-12-29 Perforation 2118.00 2120.00 13
1986-12-29 Perforation 2103.00 2105.00 13
1986-12-30 Perforation 2096.00 2100.00 13
1986-12-30 Perforation 2075.00 2089.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 3815 0.0 0.0 0.0
1988 6938 0.0 0.0 0.0
1989 2426 0.0 0.0 0.0
1990 1248 0.0 0.0 0.0
1991 1226 0.0 0.0 0.0
1992 900 0.0 0.0 0.0
1993 6234 0.0 0.0 0.0
1994 8747 0.0 0.0 0.0
1995 8242 0.0 0.0 0.0
1996 1840 0.0 0.0 0.0
1998 216 0.0 0.0 0.0

For data sources see[5]

References