X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0535172104000"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0535172104000
 
| Well ID: 0535172104000
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.586559, -116.45509 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.586559, -116.455090 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-21-053-17W5/0
 
| Location: 00/04-21-053-17W5/0
Line 43: Line 43:
 
| Surface Hole Latitude: 53.586559
 
| Surface Hole Latitude: 53.586559
 
|-
 
|-
| Surface Hole Longitude: -116.45509
+
| Surface Hole Longitude: -116.455090
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 177: Line 177:
 
| style="text-align: right;" | 2632.90
 
| style="text-align: right;" | 2632.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1968-10-16
 
| Acid Treatment
 
| style="text-align: right;" | 2631.60
 
| style="text-align: right;" | 2632.90
 
| style="text-align: right;" | 0
 
|-
 
| 1969-09-27
 
| Selective Jet Perforations
 
| style="text-align: right;" | 2634.10
 
| style="text-align: right;" | 2638.70
 
| style="text-align: right;" | 0
 
|-
 
| 1969-09-27
 
| Selective Jet Perforations
 
| style="text-align: right;" | 2643.20
 
| style="text-align: right;" | 2646.30
 
| style="text-align: right;" | 0
 
|-
 
| 1977-01-29
 
| Cement Plug
 
| style="text-align: right;" | 2578.60
 
| style="text-align: right;" | 2585.30
 
| style="text-align: right;" | 0
 
|-
 
| 1977-01-30
 
| Perforation
 
| style="text-align: right;" | 2080.00
 
| style="text-align: right;" | 2081.20
 
| style="text-align: right;" | 0
 
|-
 
| 1977-01-30
 
| Perforation
 
| style="text-align: right;" | 2075.40
 
| style="text-align: right;" | 2080.00
 
| style="text-align: right;" | 13
 
|-
 
| 1977-02-05
 
| Perforation
 
| style="text-align: right;" | 2072.60
 
| style="text-align: right;" | 2077.20
 
| style="text-align: right;" | 39
 
|-
 
| 1977-02-09
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2049.50
 
| style="text-align: right;" | 2057.40
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1977-02-09
 
| 1977-02-09
Line 278: Line 230:
 
| style="text-align: right;" | 228.60
 
| style="text-align: right;" | 228.60
 
| style="text-align: right;" | 320.00
 
| style="text-align: right;" | 320.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1968-10-16
 +
| Acid Treatment
 +
| style="text-align: right;" | 2631.60
 +
| style="text-align: right;" | 2632.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1969-09-27
 +
| Selective Jet Perforations
 +
| style="text-align: right;" | 2634.10
 +
| style="text-align: right;" | 2638.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1969-09-27
 +
| Selective Jet Perforations
 +
| style="text-align: right;" | 2643.20
 +
| style="text-align: right;" | 2646.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-01-29
 +
| Cement Plug
 +
| style="text-align: right;" | 2578.60
 +
| style="text-align: right;" | 2585.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-01-30
 +
| Perforation
 +
| style="text-align: right;" | 2080.00
 +
| style="text-align: right;" | 2081.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-01-30
 +
| Perforation
 +
| style="text-align: right;" | 2075.40
 +
| style="text-align: right;" | 2080.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1977-02-05
 +
| Perforation
 +
| style="text-align: right;" | 2072.60
 +
| style="text-align: right;" | 2077.20
 +
| style="text-align: right;" | 39
 +
|-
 +
| 1977-02-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2049.50
 +
| style="text-align: right;" | 2057.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 354: Line 354:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:00, 17 January 2021

Well Details

Well ID: 0535172104000
Loading map...
Location: 00/04-21-053-17W5/0
Location Alias: 00/04-21-53-17 W5M
Location Alias 2: 00/04-21-053-17 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 17
Section: 21
County/Municipality: Edson
Well Name: TALISMAN EDSON 4-21-53-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0025640
License Date: 1964-02-04
License Status: RecCertified
Spud Date: 1964-02-10
Final Drill Date: 1964-03-02
Well Total Depth: 2761.50 m
Surface Hole Latitude: 53.586559
Surface Hole Longitude: -116.455090

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-04 Obtained License
1964-03-02 Finished Drilling
1964-03-15 Drill Stem Test Performed
1964-03-28 Production Casing Operation Performed
1964-03-31 Well Mode changed to Drilled and Cased
1968-10-08 Perforation Treatment Performed - Jet Perforation
1968-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-27 Perforation Treatment Performed - Selective Jet Perforations
1977-01-29 Perforation Treatment Performed - Cement Plug
1977-01-30 Perforation Treatment Performed - Jet Perforation
1977-02-05 Perforation Treatment Performed - Jet Perforation
1977-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-02-09 Perforation Treatment Performed - Jet Perforation
1977-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-26 Perforation Treatment Performed - Cement Plug
1977-10-27 Perforation Treatment Performed - Cement Squeeze
1977-10-27 Perforation Treatment Performed - Jet Perforation
1977-10-28 Perforation Treatment Performed - Cement Squeeze
1977-10-29 Perforation Treatment Performed - Jet Perforation
1977-10-29 Well Fluid changed to Gas
1977-10-29 Well Mode changed to Testing
1977-10-30 Perforation Treatment Performed - Cement Plug
1977-10-30 Well Abandoned
1977-10-30 Well Fluid changed to Gas
1977-10-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-08 Perforation 2631.60 2632.90 7
1977-02-09 Perforation 1891.90 1893.10 13
1977-02-09 Perforation 1869.30 1870.30 13
1977-02-11 Acid Treatment 1869.30 1893.10 0
1977-10-26 Cement Plug 1792.20 1912.60 0
1977-10-27 Perforation 944.90 946.40 7
1977-10-27 Cement Squeeze 944.90 946.40 0
1977-10-28 Cement Squeeze 944.90 946.40 0
1977-10-29 Perforation 304.80 306.30 10
1977-10-30 Cement Plug 228.60 320.00 0
1968-10-16 Acid Treatment 2631.60 2632.90 0
1969-09-27 Selective Jet Perforations 2634.10 2638.70 0
1969-09-27 Selective Jet Perforations 2643.20 2646.30 0
1977-01-29 Cement Plug 2578.60 2585.30 0
1977-01-30 Perforation 2080.00 2081.20 0
1977-01-30 Perforation 2075.40 2080.00 13
1977-02-05 Perforation 2072.60 2077.20 39
1977-02-09 Packing Device Capped w/Cement 2049.50 2057.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 168 0.0 0.0 0.0

For data sources see[5]

References