If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 378: | Line 378: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0364272813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.126627,"lon":-113.810833,"icon":""}]} |
Location: 00/13-28-036-27W4/0 | |
Location Alias: 00/13-28-36-27 W4M | |
Location Alias 2: 00/13-28-036-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 27 | |
Section: 28 | |
County/Municipality: Red Deer County | |
Well Name: LEDDY PENHOLD 13-28-36-27 | |
Operator Name: Encana Western Resources Ltd. | |
License Number: 0020889 | |
License Date: 1961-06-08 | |
License Status: RecCertified | |
Spud Date: 1961-06-10 | |
Final Drill Date: 1961-07-16 | |
Well Total Depth: 2347.00 m | |
Surface Hole Latitude: 52.126627 | |
Surface Hole Longitude: -113.810833 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-06-08 | Obtained License |
1961-06-25 | Drill Stem Test Performed |
1961-06-30 | Drill Stem Test Performed |
1961-07-15 | Drill Stem Test Performed |
1961-07-16 | Finished Drilling |
1961-07-16 | Well Mode changed to Drilled and Cased |
1961-07-17 | Drill Stem Test Performed |
1961-07-19 | Drill Stem Test Performed |
1961-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-07-21 | Perforation Treatment Performed - Jet Perforation |
1961-07-21 | Production Casing Operation Performed |
1961-07-28 | Well Began Production |
1961-07-28 | Well Fluid changed to Crude Oil |
1961-07-28 | Well Mode changed to Flowing |
1961-09-01 | Perforation Treatment Performed - Cement Squeeze |
1961-09-05 | Perforation Treatment Performed - Jet Perforation |
1961-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-08-03 | Well Fluid changed to Crude Oil |
1962-08-03 | Well Mode changed to Suspended |
1966-12-16 | Well Fluid changed to Crude Oil |
1966-12-16 | Well Mode changed to Flowing |
1966-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-10-27 | Well Fluid changed to Crude Oil |
1975-10-27 | Well Mode changed to Suspended |
1982-07-13 | Well Fluid changed to Crude Oil |
1982-07-13 | Well Mode changed to Pumping |
1982-09-29 | Perforation Treatment Performed - Cement Plug |
1982-09-29 | Well Abandoned |
1982-09-29 | Well Fluid changed to Crude Oil |
1982-09-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-07-21 | Perforation | 2288.40 | 2289.00 | 7 |
1961-07-21 | Perforation | 2291.50 | 2295.80 | 7 |
1961-07-21 | Acid Treatment | 2288.40 | 2295.80 | 0 |
1961-09-01 | Cement Squeeze | 2288.40 | 2289.00 | 0 |
1961-09-05 | Perforation | 2293.30 | 2295.80 | 3 |
1961-09-06 | Acid Treatment | 2291.50 | 2295.80 | 0 |
1961-09-09 | Acid Treatment | 2291.50 | 2295.80 | 0 |
1966-12-22 | Acid Treatment | 2293.30 | 2295.80 | 0 |
1982-09-29 | Cement Plug | 0.10 | 855.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 720 | 0.0 | 0.0 | 0.0 |
1969 | 7376 | 0.0 | 0.0 | 0.0 |
1970 | 4173 | 0.0 | 0.0 | 0.0 |
1971 | 3748 | 0.0 | 0.0 | 0.0 |
1972 | 2681 | 0.0 | 0.0 | 0.0 |
1973 | 48 | 0.0 | 0.0 | 0.0 |
1974 | 78 | 0.0 | 0.0 | 0.0 |
1982 | 862 | 0.0 | 0.0 | 0.0 |
For data sources see[5]