X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0065033106000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0065033106000
 
| Well ID: 0065033106000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.51485600000000886, -114.39762099999995826 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.514856, -114.397621 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-31-006-03W5/0
 
| Location: 00/06-31-006-03W5/0
 +
|-
 +
| Location Alias: 00/06-31-06-03 W5M
 +
|-
 +
| Location Alias 2: 00/06-31-006-03 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 006
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 31
 +
|-
 +
| County/Municipality: [[Crowsnest Pass,_Alberta|Crowsnest Pass]]
 
|-
 
|-
 
| Well Name: IOE ET AL BELLEVUE 6-31-6-3
 
| Well Name: IOE ET AL BELLEVUE 6-31-6-3
 +
|-
 +
| Operator Name: [[Imperial Oil Resources Limited]]
 +
|-
 +
| License Number: 0025381
 
|-
 
|-
 
| License Date: 1963-12-24
 
| License Date: 1963-12-24
 
|-
 
|-
| Final Drilling Date: 1964-07-31
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1964-01-13
 +
|-
 +
| Final Drill Date: 1964-07-31
 +
|-
 +
| Well Total Depth: 4114.80 m
 +
|-
 +
| Surface Hole Latitude: 49.514856
 +
|-
 +
| Surface Hole Longitude: -114.397621
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1963-12-24
 +
| Obtained License
 +
|-
 +
| 1964-05-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1964-05-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1964-06-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1964-06-23
 +
| Drill Stem Test Performed
 +
|-
 +
| 1964-07-31
 +
| Finished Drilling
 +
|-
 +
| 1964-08-07
 +
| Production Casing Operation Performed
 +
|-
 +
| 1964-08-17
 +
| Perforation Treatment Performed - Permeator Perforation
 +
|-
 +
| 1964-08-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-08-30
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1964-09-09
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Total Depth: 4114.8m
+
| 1964-09-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1964-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Status: Abandoned
+
| 1964-09-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Well Type: Not Applicable
+
| 1964-09-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Configuration: Vertical
+
| 1964-10-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Latitude: 49.51485600000000886
+
| 1964-10-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Longitude: -114.39762099999995826
+
| 1964-10-21
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 
|-
 
|-
 +
| 1964-10-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-11-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-11-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-11-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-12-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1964-12-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-12-08
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-12-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1964-12-21
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1973-09-26
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1973-09-29
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1973-09-30
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1973-09-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1973-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1973-10-01
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1973-10-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1973-10-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1973-10-02
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1973-10-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1985-09-06
 +
| Well Log Performed
 +
|-
 +
| 1985-09-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-09-09
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1985-09-10
 +
| Well Abandoned
 +
|-
 +
| 1985-09-10
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1964-08-17
 +
| Permeator Perforation
 +
| style="text-align: right;" | 3227.50
 +
| style="text-align: right;" | 3234.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3173.00
 +
| style="text-align: right;" | 3173.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3171.40
 +
| style="text-align: right;" | 3172.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3160.80
 +
| style="text-align: right;" | 3161.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3157.70
 +
| style="text-align: right;" | 3159.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3169.60
 +
| style="text-align: right;" | 3170.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3157.70
 +
| style="text-align: right;" | 3158.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3145.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-09-09
 +
| Acid Treatment
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3687.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-09-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3687.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-09-20
 +
| Perforation
 +
| style="text-align: right;" | 3689.30
 +
| style="text-align: right;" | 3703.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-17
 +
| Permeator Perforation
 +
| style="text-align: right;" | 3669.80
 +
| style="text-align: right;" | 3687.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-09-20
 +
| Perforation
 +
| style="text-align: right;" | 3716.40
 +
| style="text-align: right;" | 3720.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-09-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 3669.80
 +
| style="text-align: right;" | 3720.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-09-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 3669.80
 +
| style="text-align: right;" | 3720.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 3211.40
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-21
 +
| Acid Wash
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-11-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3226.30
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-11-21
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3208.30
 +
| style="text-align: right;" | 3720.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-11-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3114.40
 +
| style="text-align: right;" | 3198.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-20
 +
| Acid Treatment
 +
| style="text-align: right;" | 3669.80
 +
| style="text-align: right;" | 3687.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3160.80
 +
| style="text-align: right;" | 3161.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3159.60
 +
| style="text-align: right;" | 3160.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3157.70
 +
| style="text-align: right;" | 3158.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3151.90
 +
| style="text-align: right;" | 3154.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 3145.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3140.00
 +
| style="text-align: right;" | 3141.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-04
 +
| Perforation
 +
| style="text-align: right;" | 3137.60
 +
| style="text-align: right;" | 3139.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 3137.60
 +
| style="text-align: right;" | 3161.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3190.00
 +
| style="text-align: right;" | 3192.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3187.90
 +
| style="text-align: right;" | 3189.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3233.60
 +
| style="text-align: right;" | 3235.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3185.50
 +
| style="text-align: right;" | 3186.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3173.00
 +
| style="text-align: right;" | 3173.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3171.40
 +
| style="text-align: right;" | 3172.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Perforation
 +
| style="text-align: right;" | 3168.70
 +
| style="text-align: right;" | 3170.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-12-08
 +
| Acid Treatment
 +
| style="text-align: right;" | 3137.60
 +
| style="text-align: right;" | 3198.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-09-26
 +
| Cement Plug
 +
| style="text-align: right;" | 3062.90
 +
| style="text-align: right;" | 3119.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-09-29
 +
| Cement Plug
 +
| style="text-align: right;" | 1005.20
 +
| style="text-align: right;" | 1063.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-09-30
 +
| Perforation
 +
| style="text-align: right;" | 730.00
 +
| style="text-align: right;" | 733.00
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1973-09-30
 +
| Cement Squeeze
 +
| style="text-align: right;" | 730.00
 +
| style="text-align: right;" | 733.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-09-30
 +
| Cement Plug
 +
| style="text-align: right;" | 680.30
 +
| style="text-align: right;" | 734.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3211.40
 +
| style="text-align: right;" | 3215.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1973-10-01
 +
| Perforation
 +
| style="text-align: right;" | 573.00
 +
| style="text-align: right;" | 576.10
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1973-10-01
 +
| Cement Squeeze
 +
| style="text-align: right;" | 573.00
 +
| style="text-align: right;" | 576.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-10-01
 +
| Cement Plug
 +
| style="text-align: right;" | 566.30
 +
| style="text-align: right;" | 580.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-10-02
 +
| Cement Squeeze
 +
| style="text-align: right;" | 535.20
 +
| style="text-align: right;" | 564.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-10-02
 +
| Cement Plug
 +
| style="text-align: right;" | 535.20
 +
| style="text-align: right;" | 564.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-09-07
 +
| Perforation
 +
| style="text-align: right;" | 205.00
 +
| style="text-align: right;" | 205.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1985-09-09
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 205.00
 +
| style="text-align: right;" | 205.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3196.10
 +
| style="text-align: right;" | 3198.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3190.00
 +
| style="text-align: right;" | 3192.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3187.90
 +
| style="text-align: right;" | 3189.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-08-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 3185.50
 +
| style="text-align: right;" | 3186.40
 +
| style="text-align: right;" | 7
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:47, 17 January 2021

Well Details

Well ID: 0065033106000
Loading map...
Location: 00/06-31-006-03W5/0
Location Alias: 00/06-31-06-03 W5M
Location Alias 2: 00/06-31-006-03 W5/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 03
Section: 31
County/Municipality: Crowsnest Pass
Well Name: IOE ET AL BELLEVUE 6-31-6-3
Operator Name: Imperial Oil Resources Limited
License Number: 0025381
License Date: 1963-12-24
License Status: RecCertified
Spud Date: 1964-01-13
Final Drill Date: 1964-07-31
Well Total Depth: 4114.80 m
Surface Hole Latitude: 49.514856
Surface Hole Longitude: -114.397621

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-24 Obtained License
1964-05-11 Drill Stem Test Performed
1964-05-17 Drill Stem Test Performed
1964-06-20 Drill Stem Test Performed
1964-06-23 Drill Stem Test Performed
1964-07-31 Finished Drilling
1964-08-07 Production Casing Operation Performed
1964-08-17 Perforation Treatment Performed - Permeator Perforation
1964-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-30 Perforation Treatment Performed - Bullet Perforation
1964-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-20 Perforation Treatment Performed - Jet Perforation
1964-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-21 Perforation Treatment Performed - Acid Wash - No Pressure
1964-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-14 Perforation Treatment Performed - Cement Squeeze
1964-11-21 Perforation Treatment Performed - Cement Squeeze
1964-11-27 Perforation Treatment Performed - Cement Squeeze
1964-12-04 Perforation Treatment Performed - Jet Perforation
1964-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-08 Perforation Treatment Performed - Jet Perforation
1964-12-21 Well Mode changed to Drilled and Cased
1973-09-26 Perforation Treatment Performed - Cement Plug
1973-09-29 Perforation Treatment Performed - Cement Plug
1973-09-30 Perforation Treatment Performed - Cement Plug
1973-09-30 Perforation Treatment Performed - Cement Squeeze
1973-09-30 Perforation Treatment Performed - Jet Perforation
1973-10-01 Perforation Treatment Performed - Cement Plug
1973-10-01 Perforation Treatment Performed - Cement Squeeze
1973-10-01 Perforation Treatment Performed - Jet Perforation
1973-10-02 Perforation Treatment Performed - Cement Plug
1973-10-02 Perforation Treatment Performed - Cement Squeeze
1985-09-06 Well Log Performed
1985-09-07 Perforation Treatment Performed - Jet Perforation
1985-09-09 Perforation Treatment Performed - Remedial Casing
1985-09-10 Well Abandoned
1985-09-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-08-17 Permeator Perforation 3227.50 3234.20 7
1964-08-30 Bullet Perforation 3173.00 3173.60 7
1964-08-30 Bullet Perforation 3171.40 3172.10 7
1964-08-30 Bullet Perforation 3160.80 3161.40 7
1964-08-30 Bullet Perforation 3157.70 3159.60 7
1964-08-30 Bullet Perforation 3169.60 3170.50 7
1964-08-30 Bullet Perforation 3157.70 3158.90 7
1964-08-30 Bullet Perforation 3142.20 3145.80 7
1964-09-09 Acid Treatment 3142.20 3687.50 0
1964-09-11 Acid Treatment 3142.20 3687.50 0
1964-09-20 Perforation 3689.30 3703.30 7
1964-08-17 Permeator Perforation 3669.80 3687.50 7
1964-09-20 Perforation 3716.40 3720.70 7
1964-09-21 Acid Treatment 3669.80 3720.70 0
1964-09-22 Acid Treatment 3669.80 3720.70 0
1964-10-20 Acid Treatment 3211.40 3235.50 0
1964-10-21 Acid Wash 3142.20 3235.50 0
1964-10-21 Acid Treatment 3142.20 3235.50 0
1964-10-26 Acid Treatment 3142.20 3235.50 0
1964-11-14 Cement Squeeze 3226.30 3235.50 0
1964-11-21 Cement Squeeze 3208.30 3720.70 0
1964-11-27 Cement Squeeze 3114.40 3198.60 0
1964-08-20 Acid Treatment 3669.80 3687.50 0
1964-12-04 Perforation 3160.80 3161.40 7
1964-12-04 Perforation 3159.60 3160.20 7
1964-12-04 Perforation 3157.70 3158.90 7
1964-12-04 Perforation 3151.90 3154.10 7
1964-12-04 Perforation 3142.20 3145.80 7
1964-12-04 Perforation 3140.00 3141.00 7
1964-12-04 Perforation 3137.60 3139.40 7
1964-12-05 Acid Treatment 3137.60 3161.40 0
1964-12-08 Perforation 3190.00 3192.50 7
1964-12-08 Perforation 3187.90 3189.40 7
1964-08-30 Bullet Perforation 3233.60 3235.50 7
1964-12-08 Perforation 3185.50 3186.40 7
1964-12-08 Perforation 3173.00 3173.60 7
1964-12-08 Perforation 3171.40 3172.10 7
1964-12-08 Perforation 3168.70 3170.50 7
1964-12-08 Acid Treatment 3137.60 3198.60 0
1973-09-26 Cement Plug 3062.90 3119.30 0
1973-09-29 Cement Plug 1005.20 1063.80 0
1973-09-30 Perforation 730.00 733.00 3
1973-09-30 Cement Squeeze 730.00 733.00 0
1973-09-30 Cement Plug 680.30 734.30 0
1964-08-30 Bullet Perforation 3211.40 3215.30 7
1973-10-01 Perforation 573.00 576.10 3
1973-10-01 Cement Squeeze 573.00 576.10 0
1973-10-01 Cement Plug 566.30 580.90 0
1973-10-02 Cement Squeeze 535.20 564.80 0
1973-10-02 Cement Plug 535.20 564.80 0
1985-09-07 Perforation 205.00 205.70 7
1985-09-09 Remedial Casing Cementing 205.00 205.70 0
1964-08-30 Bullet Perforation 3196.10 3198.60 7
1964-08-30 Bullet Perforation 3190.00 3192.50 7
1964-08-30 Bullet Perforation 3187.90 3189.40 7
1964-08-30 Bullet Perforation 3185.50 3186.40 7

For data sources see[4]



References