X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0084233008002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0084233008002
 
| Well ID: 0084233008002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.6748923, -113.0979684 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.668831, -113.080321 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: BOWOOD KIPP 8-30-8-23
+
| Location: 00/08-30-008-23W4/2
 
|-
 
|-
| Operator:
+
| Location Alias: 00/08-30-08-23 W4M
 +
|-
 +
| Location Alias 2: 00/08-30-008-23 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 008
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 30
 +
|-
 +
| County/Municipality: [[Blood 148,_Alberta|Blood 148]]
 +
|-
 +
| Well Name: TAC KIPP 2-29-8-23
 +
|-
 +
| Operator Name: [[Tamarack Acquisition Corp.]]
 +
|-
 +
| License Number: 0434059
 
|-
 
|-
 
| License Date: 2011-06-06
 
| License Date: 2011-06-06
 
|-
 
|-
| Final Drilling Date: 2011-09-25
+
| License Status: Amended
 +
|-
 +
| Spud Date: 2011-07-25
 +
|-
 +
| Final Drill Date: 2011-09-25
 +
|-
 +
| Well Total Depth: 3610.00 m
 +
|-
 +
| Surface Hole Latitude: 49.668831
 +
|-
 +
| Surface Hole Longitude: -113.080321
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Total Depth: 3610.0m
+
| 2011-06-06
 +
| Obtained License
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2011-09-07
 +
| Direction Drilling Operation Performed - Horizontal
 
|-
 
|-
| Status: Pumping
+
| 2011-09-10
 +
| Intermediate Casing Operation Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2011-09-25
 +
| Finished Drilling
 
|-
 
|-
| Configuration: Horizontal
+
| 2011-09-25
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Violations:
+
| 2011-09-27
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 49.6748923
+
| 2011-10-02
 +
| Liner Casing Operation Performed
 
|-
 
|-
| Longitude: -113.0979684
+
| 2011-10-05
 +
| Rig Released
 +
|-
 +
| 2011-10-17
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-10-25
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-10-26
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-10-27
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-10-28
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-10-29
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2011-12-14
 +
| Well Began Production
 +
|-
 +
| 2011-12-14
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2011-12-14
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2017-11-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-11-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2017-11-30
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2017-11-30
 +
| Well Mode changed to Suspended
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2011-09-07
 +
| style="text-align: right;" | 2257.90
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2011-10-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3597.40
 +
| style="text-align: right;" | 3597.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3064.40
 +
| style="text-align: right;" | 3064.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3001.30
 +
| style="text-align: right;" | 3001.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2938.00
 +
| style="text-align: right;" | 2938.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2874.80
 +
| style="text-align: right;" | 2874.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2811.70
 +
| style="text-align: right;" | 2811.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2748.50
 +
| style="text-align: right;" | 2748.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2685.70
 +
| style="text-align: right;" | 2685.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2622.60
 +
| style="text-align: right;" | 2622.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2559.40
 +
| style="text-align: right;" | 2559.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2496.30
 +
| style="text-align: right;" | 2496.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3596.60
 +
| style="text-align: right;" | 3596.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2433.10
 +
| style="text-align: right;" | 2433.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2369.80
 +
| style="text-align: right;" | 2369.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017-11-20
 +
| Perforation
 +
| style="text-align: right;" | 1949.00
 +
| style="text-align: right;" | 1955.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2017-11-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 1949.00
 +
| style="text-align: right;" | 1955.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-25
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3506.70
 +
| style="text-align: right;" | 3506.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-25
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3443.50
 +
| style="text-align: right;" | 3443.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-25
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3380.30
 +
| style="text-align: right;" | 3380.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-26
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3317.00
 +
| style="text-align: right;" | 3317.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3254.00
 +
| style="text-align: right;" | 3254.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3190.80
 +
| style="text-align: right;" | 3190.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3127.60
 +
| style="text-align: right;" | 3127.70
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 408
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8105
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8745
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8518
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8572
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8480
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 7919
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2017-11-27
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:55, 18 January 2021

Well Details

Well ID: 0084233008002
Loading map...
Location: 00/08-30-008-23W4/2
Location Alias: 00/08-30-08-23 W4M
Location Alias 2: 00/08-30-008-23 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 23
Section: 30
County/Municipality: Blood 148
Well Name: TAC KIPP 2-29-8-23
Operator Name: Tamarack Acquisition Corp.
License Number: 0434059
License Date: 2011-06-06
License Status: Amended
Spud Date: 2011-07-25
Final Drill Date: 2011-09-25
Well Total Depth: 3610.00 m
Surface Hole Latitude: 49.668831
Surface Hole Longitude: -113.080321

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-09-07 Direction Drilling Operation Performed - Horizontal
2011-09-10 Intermediate Casing Operation Performed
2011-09-25 Finished Drilling
2011-09-25 Well Mode changed to Drilled and Cased
2011-09-27 Well Log Performed
2011-10-02 Liner Casing Operation Performed
2011-10-05 Rig Released
2011-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-14 Well Began Production
2011-12-14 Well Fluid changed to Crude Oil
2011-12-14 Well Mode changed to Pumping
2017-11-20 Perforation Treatment Performed - Jet Perforation
2017-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-11-30 Well Fluid changed to Crude Oil
2017-11-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-07 2257.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-17 Multi-Stage Fracture 3597.40 3597.50 0
2011-10-27 Multi-Stage Fracture 3064.40 3064.50 0
2011-10-28 Multi-Stage Fracture 3001.30 3001.40 0
2011-10-28 Multi-Stage Fracture 2938.00 2938.10 0
2011-10-28 Multi-Stage Fracture 2874.80 2874.90 0
2011-10-28 Multi-Stage Fracture 2811.70 2811.80 0
2011-10-28 Multi-Stage Fracture 2748.50 2748.60 0
2011-10-28 Multi-Stage Fracture 2685.70 2685.80 0
2011-10-28 Multi-Stage Fracture 2622.60 2622.70 0
2011-10-29 Multi-Stage Fracture 2559.40 2559.50 0
2011-10-29 Multi-Stage Fracture 2496.30 2496.40 0
2011-10-17 Multi-Stage Fracture 3596.60 3596.70 0
2011-10-29 Multi-Stage Fracture 2433.10 2433.20 0
2011-10-29 Multi-Stage Fracture 2369.80 2369.90 0
2017-11-20 Perforation 1949.00 1955.00 17
2017-11-21 Acid Treatment 1949.00 1955.00 0
2011-10-25 Multi-Stage Fracture 3506.70 3506.80 0
2011-10-25 Multi-Stage Fracture 3443.50 3443.60 0
2011-10-25 Multi-Stage Fracture 3380.30 3380.40 0
2011-10-26 Multi-Stage Fracture 3317.00 3317.10 0
2011-10-27 Multi-Stage Fracture 3254.00 3254.10 0
2011-10-27 Multi-Stage Fracture 3190.80 3190.90 0
2011-10-27 Multi-Stage Fracture 3127.60 3127.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 408 0.0 0.0 0.0
2012 8105 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8518 0.0 0.0 0.0
2015 8572 0.0 0.0 0.0
2016 8480 0.0 0.0 0.0
2017 7919 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References