If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0634202011000 | | Well ID: 0634202011000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 54.466713, -112.992430 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/11-20-063-20W4/0 | | Location: 00/11-20-063-20W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/11-20-063-20 W4/00 | | Location Alias 2: 00/11-20-063-20 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 063 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 20 | ||
+ | |- | ||
+ | | Section: 20 | ||
|- | |- | ||
| County/Municipality: [[Athabasca County,_Alberta|Athabasca County]] | | County/Municipality: [[Athabasca County,_Alberta|Athabasca County]] | ||
Line 17: | Line 27: | ||
| Well Name: ACL JILES 11-20-63-20 | | Well Name: ACL JILES 11-20-63-20 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Paramount Resources Ltd.]] |
|- | |- | ||
| License Number: 0151402 | | License Number: 0151402 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1992-01-30 | | Final Drill Date: 1992-01-30 | ||
|- | |- | ||
− | | Well Total Depth: 771 m | + | | Well Total Depth: 771.00 m |
|- | |- | ||
| Surface Hole Latitude: 54.466713 | | Surface Hole Latitude: 54.466713 | ||
|- | |- | ||
− | | Surface Hole Longitude: -112. | + | | Surface Hole Longitude: -112.992430 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1992-01-17 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1992-01-28 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 1992-01-30 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1992-01-30 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1992-01-30 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1992-01-31 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1992-01-31 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 1992-02-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1992-02-02 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 1992-02-03 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1992-06-22 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1992-06-22 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1992-06-22 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1992-12-08 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1992-12-08 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1992-12-08 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1992-12-08 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1992-12-08 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 1993-12-09 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1994-02-27 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1994-02-27 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1998-02-09 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-04-29 }}</ref> |
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 162: | ||
| 1992-02-01 | | 1992-02-01 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 302 | + | | style="text-align: right;" | 302.00 |
− | | style="text-align: right;" | 303 | + | | style="text-align: right;" | 303.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-02-02 | | 1992-02-02 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 302 | + | | style="text-align: right;" | 302.00 |
− | | style="text-align: right;" | 303 | + | | style="text-align: right;" | 303.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-02-03 | | 1992-02-03 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 739 | + | | style="text-align: right;" | 739.00 |
− | | style="text-align: right;" | 740 | + | | style="text-align: right;" | 740.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-12-08 | | 1992-12-08 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 722 | + | | style="text-align: right;" | 722.00 |
− | | style="text-align: right;" | 730 | + | | style="text-align: right;" | 730.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-12-08 | | 1992-12-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 564 | + | | style="text-align: right;" | 564.00 |
− | | style="text-align: right;" | 565 | + | | style="text-align: right;" | 565.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1992-12-08 | | 1992-12-08 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 569 | + | | style="text-align: right;" | 569.00 |
− | | style="text-align: right;" | 570 | + | | style="text-align: right;" | 570.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1993-12-09 | | 1993-12-09 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 718 | + | | style="text-align: right;" | 718.00 |
− | | style="text-align: right;" | 719 | + | | style="text-align: right;" | 719.00 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1994-02-27 | | 1994-02-27 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 705 | + | | style="text-align: right;" | 705.00 |
− | | style="text-align: right;" | 713 | + | | style="text-align: right;" | 713.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1994-02-27 | | 1994-02-27 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 551 | + | | style="text-align: right;" | 551.00 |
− | | style="text-align: right;" | 559 | + | | style="text-align: right;" | 559.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 130: | Line 218: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 163: | Line 265: | ||
| 1992 | | 1992 | ||
| style="text-align: right;" | 857 | | style="text-align: right;" | 857 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
Line 171: | Line 273: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Occurences == | <!--== Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 186: | Line 288: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0634202011000 | |
Location: 00/11-20-063-20W4/0 | |
Location Alias: 00/11-20-63-20 W4M | |
Location Alias 2: 00/11-20-063-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: Athabasca County | |
Well Name: ACL JILES 11-20-63-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0151402 | |
License Date: 1992-01-17 | |
License Status: RecCertified | |
Spud Date: 1992-01-28 | |
Final Drill Date: 1992-01-30 | |
Well Total Depth: 771.00 m | |
Surface Hole Latitude: 54.466713 | |
Surface Hole Longitude: -112.992430 |
Date | Event |
---|---|
1992-01-17 | Obtained License |
1992-01-28 | Surface Casing Operation Performed |
1992-01-30 | Finished Drilling |
1992-01-30 | Well Log Performed |
1992-01-30 | Well Mode changed to Drilled and Cased |
1992-01-31 | Production Casing Operation Performed |
1992-01-31 | Rig Released |
1992-02-01 | Perforation Treatment Performed - Jet Perforation |
1992-02-02 | Perforation Treatment Performed - Remedial Casing |
1992-02-03 | Perforation Treatment Performed - Jet Perforation |
1992-06-22 | Well Began Production |
1992-06-22 | Well Fluid changed to Gas |
1992-06-22 | Well Mode changed to Flowing |
1992-12-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-12-08 | Perforation Treatment Performed - Jet Perforation |
1992-12-08 | Plug Back Performed |
1992-12-08 | Well Fluid changed to Gas |
1992-12-08 | Well Mode changed to Abandoned Zone |
1993-12-09 | Perforation Treatment Performed - Jet Perforation |
1994-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-02-27 | Plug Back Performed |
1998-02-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-02-01 | Perforation | 302.00 | 303.00 | 13 |
1992-02-02 | Remedial Casing Cementing | 302.00 | 303.00 | 0 |
1992-02-03 | Perforation | 739.00 | 740.00 | 13 |
1992-12-08 | Packing Device Capped w/Cement | 722.00 | 730.00 | 0 |
1992-12-08 | Perforation | 564.00 | 565.00 | 13 |
1992-12-08 | Perforation | 569.00 | 570.00 | 13 |
1993-12-09 | Perforation | 718.00 | 719.00 | 13 |
1994-02-27 | Packing Device Capped w/Cement | 705.00 | 713.00 | 0 |
1994-02-27 | Packing Device Capped w/Cement | 551.00 | 559.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 857 | 0.0 | 0.0 | 0.0 |
For data sources see[5]