If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0635200204020 | | Well ID: 0635200204020 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 54.427827, -116.919905 | width=100% | height=100% }} |
|- | |- | ||
| Location: 02/04-02-063-20W5/0 | | Location: 02/04-02-063-20W5/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 02/04-02-063-20 W5/00 | | Location Alias 2: 02/04-02-063-20 W5/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 063 | ||
+ | |- | ||
+ | | Meridian: 5 | ||
+ | |- | ||
+ | | Range: 20 | ||
+ | |- | ||
+ | | Section: 02 | ||
|- | |- | ||
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]] | | County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]] | ||
Line 29: | Line 39: | ||
| Final Drill Date: 2012-04-21 | | Final Drill Date: 2012-04-21 | ||
|- | |- | ||
− | | Well Total Depth: 3268 m | + | | Well Total Depth: 3268.00 m |
|- | |- | ||
| Surface Hole Latitude: 54.427827 | | Surface Hole Latitude: 54.427827 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-04-10 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2012-04-12 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-04-15 | ||
+ | | Direction Drilling Operation Performed - Deviate | ||
+ | |- | ||
+ | | 2012-04-17 | ||
+ | | Direction Drilling Operation Performed - Horizontal | ||
+ | |- | ||
+ | | 2012-04-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-21 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2012-04-21 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-21 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2012-04-23 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-24 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-04-25 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-23 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-25 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-26 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-27 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-28 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-29 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-29 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2012-06-29 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-06-29 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 2012-11-10 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-11-10 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 2014-09-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2014-09-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
== Spud Table == | == Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 54: | Line 151: | ||
!scope="col" | Activity Type | !scope="col" | Activity Type | ||
|- | |- | ||
− | | 10 | + | | 2012-04-10 |
| [[Nabors Drilling Limited]] | | [[Nabors Drilling Limited]] | ||
| style="text-align: right;" | 27 | | style="text-align: right;" | 27 | ||
Line 64: | Line 161: | ||
| title =ST49: Daily Spud and Drilling Activity List | | title =ST49: Daily Spud and Drilling Activity List | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-30 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-09 }}</ref> |
== Directional Drilling == | == Directional Drilling == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 171: | ||
|- | |- | ||
| 2012-04-15 | | 2012-04-15 | ||
− | | style="text-align: right;" | 1721 | + | | style="text-align: right;" | 1721.00 |
− | + | | Deviate (5 - 79 degrees) | |
|- | |- | ||
| 2012-04-17 | | 2012-04-17 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2188.60 |
| Horizontal | | Horizontal | ||
|- | |- | ||
Line 85: | Line 182: | ||
| title = General Well Data File - Tour-Direction Drilling Data | | title = General Well Data File - Tour-Direction Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
== Perforation Treatments == | == Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 98: | Line 195: | ||
| 2012-06-21 | | 2012-06-21 | ||
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | 3214. | + | | style="text-align: right;" | 3214.50 |
− | | style="text-align: right;" | 3214. | + | | style="text-align: right;" | 3214.60 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-29 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2365.60 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2365.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-29 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2284.90 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2285.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-29 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2204.40 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2204.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-23 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3141.70 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3141.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-23 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3061.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3061.10 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-25 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2980.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2980.10 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-25 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2807.40 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2807.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-26 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2726.50 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2726.60 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-26 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2633.60 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2633.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-27 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2539.80 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2539.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2012-06- | + | | 2012-06-28 |
| Multi-Stage Fracture | | Multi-Stage Fracture | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2458.90 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2459.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 172: | Line 269: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 205: | Line 316: | ||
| 2012 | | 2012 | ||
| style="text-align: right;" | 1035 | | style="text-align: right;" | 1035 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 2013 | | 2013 | ||
| style="text-align: right;" | 3384 | | style="text-align: right;" | 3384 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 219: | Line 330: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
== Occurences == | == Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 230: | Line 341: | ||
|- | |- | ||
| 2012-04-21 | | 2012-04-21 | ||
− | | No Incident | + | | No Incident Encountered |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
|- | |- | ||
| 2012-06-04 | | 2012-06-04 | ||
− | | No Incident | + | | No Incident Encountered |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
|- | |- | ||
|} | |} | ||
Line 243: | Line 354: | ||
| title = General Well Data File - Tour-Occurence Data | | title = General Well Data File - Tour-Occurence Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0635200204020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.427827,"lon":-116.919905,"icon":""}]} |
Location: 02/04-02-063-20W5/0 | |
Location Alias: 02/04-02-63-20 W5M | |
Location Alias 2: 02/04-02-063-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 20 | |
Section: 02 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MURPHY 13-02A KAYBOBS 4-2-63-20 | |
Operator Name: Murphy Oil Company Ltd. | |
License Number: 0445303 | |
License Date: 2012-04-10 | |
License Status: Suspension | |
Spud Date: 2012-04-10 | |
Final Drill Date: 2012-04-21 | |
Well Total Depth: 3268.00 m | |
Surface Hole Latitude: 54.427827 | |
Surface Hole Longitude: -116.919905 |
Date | Event |
---|---|
2012-04-10 | Obtained License |
2012-04-12 | Surface Casing Operation Performed |
2012-04-15 | Direction Drilling Operation Performed - Deviate |
2012-04-17 | Direction Drilling Operation Performed - Horizontal |
2012-04-20 | Well Log Performed |
2012-04-21 | Finished Drilling |
2012-04-21 | Well Log Performed |
2012-04-21 | Well Mode changed to Drilled and Cased |
2012-04-23 | Well Log Performed |
2012-04-24 | Production Casing Operation Performed |
2012-04-25 | Rig Released |
2012-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-29 | Well Began Production |
2012-06-29 | Well Fluid changed to Crude Oil |
2012-06-29 | Well Mode changed to Flowing |
2012-11-10 | Well Fluid changed to Crude Oil |
2012-11-10 | Well Mode changed to Pumping |
2014-09-01 | Well Fluid changed to Crude Oil |
2014-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-04-10 | Nabors Drilling Limited | 27 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-04-15 | 1721.00 | Deviate (5 - 79 degrees) |
2012-04-17 | 2188.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-21 | Multi-Stage Fracture | 3214.50 | 3214.60 | 0 |
2012-06-29 | Multi-Stage Fracture | 2365.60 | 2365.70 | 0 |
2012-06-29 | Multi-Stage Fracture | 2284.90 | 2285.00 | 0 |
2012-06-29 | Multi-Stage Fracture | 2204.40 | 2204.50 | 0 |
2012-06-23 | Multi-Stage Fracture | 3141.70 | 3141.80 | 0 |
2012-06-23 | Multi-Stage Fracture | 3061.00 | 3061.10 | 0 |
2012-06-25 | Multi-Stage Fracture | 2980.00 | 2980.10 | 0 |
2012-06-25 | Multi-Stage Fracture | 2807.40 | 2807.50 | 0 |
2012-06-26 | Multi-Stage Fracture | 2726.50 | 2726.60 | 0 |
2012-06-26 | Multi-Stage Fracture | 2633.60 | 2633.70 | 0 |
2012-06-27 | Multi-Stage Fracture | 2539.80 | 2539.90 | 0 |
2012-06-28 | Multi-Stage Fracture | 2458.90 | 2459.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1035 | 0.0 | 0.0 | 0.0 |
2013 | 3384 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-21 | No Incident Encountered | 0.00 | 0.00 |
2012-06-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]