X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0384180615002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0384180615002
 
| Well ID: 0384180615002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.241959, -112.559267 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.241959, -112.559267 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/15-06-038-18W4/2
 
| Location: 00/15-06-038-18W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/15-06-038-18 W4/02
 
| Location Alias 2: 00/15-06-038-18 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 038
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 18
 +
|-
 +
| Section: 06
 
|-
 
|-
 
| County/Municipality: [[County of Stettler No. 6,_Alberta|County of Stettler No. 6]]
 
| County/Municipality: [[County of Stettler No. 6,_Alberta|County of Stettler No. 6]]
Line 17: Line 27:
 
| Well Name: TEAC GADSBY 15-6-38-18
 
| Well Name: TEAC GADSBY 15-6-38-18
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Trident Exploration (Alberta) Corp.]]
 
|-
 
|-
 
| License Number: 0077667
 
| License Number: 0077667
Line 29: Line 39:
 
| Final Drill Date: 1979-09-09
 
| Final Drill Date: 1979-09-09
 
|-
 
|-
| Well Total Depth: 1315 m
+
| Well Total Depth: 1315.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.241959
 
| Surface Hole Latitude: 52.241959
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-08-23
 +
| Obtained License
 +
|-
 +
| 1979-09-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-09-09
 +
| Finished Drilling
 +
|-
 +
| 1979-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-09-11
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-24
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1979-09-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-09-27
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1996-11-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-12-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2003-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-03-02
 +
| Well Log Performed
 +
|-
 +
| 2009-07-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-07-15
 +
| Plug Back Performed
 +
|-
 +
| 2009-07-15
 +
| Well Log Performed
 +
|-
 +
| 2009-07-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-07-16
 +
| Well Log Performed
 +
|-
 +
| 2009-07-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-07-17
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-07-17
 +
| Plug Back Performed
 +
|-
 +
| 2009-07-17
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2009-07-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-07-20
 +
| Well Log Performed
 +
|-
 +
| 2009-07-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-07-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-07-21
 +
| Plug Back Performed
 +
|-
 +
| 2009-07-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-07-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-07-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-07-24
 +
| Plug Back Performed
 +
|-
 +
| 2009-07-24
 +
| Well Log Performed
 +
|-
 +
| 2009-07-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-07-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-09-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-09-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-09-18
 +
| Well Log Performed
 +
|-
 +
| 2009-09-19
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-09-19
 +
| Plug Back Performed
 +
|-
 +
| 2009-09-20
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-09-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-09-20
 +
| Plug Back Performed
 +
|-
 +
| 2009-09-20
 +
| Well Log Performed
 +
|-
 +
| 2009-09-21
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-09-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2009-09-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-09-21
 +
| Plug Back Performed
 +
|-
 +
| 2009-09-21
 +
| Well Log Performed
 +
|-
 +
| 2009-09-23
 +
| Well Abandoned
 +
|-
 +
| 2009-09-23
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 255:
 
| 1979-09-20
 
| 1979-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1245
+
| style="text-align: right;" | 1245.00
| style="text-align: right;" | 1247
+
| style="text-align: right;" | 1247.00
| style="text-align: right;" | 7
 
|-
 
| 1979-09-20
 
| Perforation
 
| style="text-align: right;" | 1249
 
| style="text-align: right;" | 1252
 
| style="text-align: right;" | 7
 
|-
 
| 1979-09-24
 
| Fracture
 
| style="text-align: right;" | 1245
 
| style="text-align: right;" | 1252
 
| style="text-align: right;" | 0
 
|-
 
| 1979-09-26
 
| Perforation
 
| style="text-align: right;" | 1119.5
 
| style="text-align: right;" | 1120.5
 
| style="text-align: right;" | 7
 
|-
 
| 1979-09-26
 
| Perforation
 
| style="text-align: right;" | 1123
 
| style="text-align: right;" | 1126
 
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1979-09-27
 
| Acid Treatment
 
| style="text-align: right;" | 1119.5
 
| style="text-align: right;" | 1126
 
| style="text-align: right;" | 0
 
|-
 
| 1996-11-01
 
| Perforation
 
| style="text-align: right;" | 1119.5
 
| style="text-align: right;" | 1120.5
 
| style="text-align: right;" | 13
 
|-
 
| 1996-11-01
 
| Perforation
 
| style="text-align: right;" | 1123
 
| style="text-align: right;" | 1126
 
| style="text-align: right;" | 13
 
|-
 
| 1996-12-01
 
| Cement Squeeze
 
| style="text-align: right;" | 1119.5
 
| style="text-align: right;" | 1126
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 2003-03-02
 
| 2003-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1249
+
| style="text-align: right;" | 1249.00
| style="text-align: right;" | 1252
+
| style="text-align: right;" | 1252.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2003-03-02
 
| 2003-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1245
+
| style="text-align: right;" | 1245.00
| style="text-align: right;" | 1247
+
| style="text-align: right;" | 1247.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-07-15
 
| 2009-07-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1227
+
| style="text-align: right;" | 1227.00
| style="text-align: right;" | 1235
+
| style="text-align: right;" | 1235.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-16
 
| 2009-07-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 605
+
| style="text-align: right;" | 605.00
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-07-17
 
| 2009-07-17
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 605
+
| style="text-align: right;" | 605.00
| style="text-align: right;" | 606
+
| style="text-align: right;" | 606.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-17
 
| 2009-07-17
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 586
+
| style="text-align: right;" | 586.00
| style="text-align: right;" | 600.1
+
| style="text-align: right;" | 600.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-20
 
| 2009-07-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 545.5
+
| style="text-align: right;" | 545.50
| style="text-align: right;" | 546.5
+
| style="text-align: right;" | 546.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-07-21
 
| 2009-07-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 545.5
+
| style="text-align: right;" | 545.50
| style="text-align: right;" | 546.5
+
| style="text-align: right;" | 546.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-21
 
| 2009-07-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 527
+
| style="text-align: right;" | 527.00
| style="text-align: right;" | 540
+
| style="text-align: right;" | 540.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-24
 
| 2009-07-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 387.5
+
| style="text-align: right;" | 387.50
| style="text-align: right;" | 388.5
+
| style="text-align: right;" | 388.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1979-09-20
 +
| Perforation
 +
| style="text-align: right;" | 1249.00
 +
| style="text-align: right;" | 1252.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2009-07-24
 
| 2009-07-24
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 387.5
+
| style="text-align: right;" | 387.50
| style="text-align: right;" | 388.5
+
| style="text-align: right;" | 388.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-24
 
| 2009-07-24
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 330.7
+
| style="text-align: right;" | 330.70
| style="text-align: right;" | 412.6
+
| style="text-align: right;" | 412.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-07-25
 
| 2009-07-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 323.7
+
| style="text-align: right;" | 323.70
| style="text-align: right;" | 324.7
+
| style="text-align: right;" | 324.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-07-25
 
| 2009-07-25
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 323.7
+
| style="text-align: right;" | 323.70
| style="text-align: right;" | 324.7
+
| style="text-align: right;" | 324.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-18
 
| 2009-09-18
 
| Perforation
 
| Perforation
| style="text-align: right;" | 306.5
+
| style="text-align: right;" | 306.50
| style="text-align: right;" | 307.5
+
| style="text-align: right;" | 307.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2009-09-18
 
| 2009-09-18
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 306.5
+
| style="text-align: right;" | 306.50
| style="text-align: right;" | 307.5
+
| style="text-align: right;" | 307.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-19
 
| 2009-09-19
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 288
+
| style="text-align: right;" | 288.00
| style="text-align: right;" | 308
+
| style="text-align: right;" | 308.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-20
 
| 2009-09-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 280
+
| style="text-align: right;" | 280.00
| style="text-align: right;" | 281
+
| style="text-align: right;" | 281.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-09-20
 
| 2009-09-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 280
+
| style="text-align: right;" | 280.00
| style="text-align: right;" | 281
+
| style="text-align: right;" | 281.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-20
 
| 2009-09-20
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 259.5
+
| style="text-align: right;" | 259.50
| style="text-align: right;" | 288
+
| style="text-align: right;" | 288.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-24
 +
| Fracture
 +
| style="text-align: right;" | 1245.00
 +
| style="text-align: right;" | 1252.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-21
 
| 2009-09-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
| style="text-align: right;" | 255
+
| style="text-align: right;" | 255.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-09-21
 
| 2009-09-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
| style="text-align: right;" | 255
+
| style="text-align: right;" | 255.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-09-21
 
| 2009-09-21
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 229.7
+
| style="text-align: right;" | 229.70
| style="text-align: right;" | 259.5
+
| style="text-align: right;" | 259.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-26
 +
| Perforation
 +
| style="text-align: right;" | 1119.50
 +
| style="text-align: right;" | 1120.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1979-09-26
 +
| Perforation
 +
| style="text-align: right;" | 1123.00
 +
| style="text-align: right;" | 1126.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1979-09-27
 +
| Acid Treatment
 +
| style="text-align: right;" | 1119.50
 +
| style="text-align: right;" | 1126.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-11-01
 +
| Perforation
 +
| style="text-align: right;" | 1119.50
 +
| style="text-align: right;" | 1120.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-11-01
 +
| Perforation
 +
| style="text-align: right;" | 1123.00
 +
| style="text-align: right;" | 1126.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-12-01
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1119.50
 +
| style="text-align: right;" | 1126.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 268: Line 449:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 313: Line 508:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:27, 18 January 2021

Well Details

Well ID: 0384180615002
Loading map...
Location: 00/15-06-038-18W4/2
Location Alias: 00/15-06-38-18 W4M
Location Alias 2: 00/15-06-038-18 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 18
Section: 06
County/Municipality: County of Stettler No. 6
Well Name: TEAC GADSBY 15-6-38-18
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0077667
License Date: 1979-08-23
License Status: Abandoned
Spud Date: 1979-09-01
Final Drill Date: 1979-09-09
Well Total Depth: 1315.00 m
Surface Hole Latitude: 52.241959
Surface Hole Longitude: -112.559267

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-23 Obtained License
1979-09-06 Drill Stem Test Performed
1979-09-09 Finished Drilling
1979-09-09 Well Log Performed
1979-09-11 Production Casing Operation Performed
1979-09-20 Perforation Treatment Performed - Jet Perforation
1979-09-24 Perforation Treatment Performed - Fractured
1979-09-26 Perforation Treatment Performed - Jet Perforation
1979-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-27 Well Mode changed to Drilled and Cased
1996-11-01 Perforation Treatment Performed - Jet Perforation
1996-12-01 Perforation Treatment Performed - Cement Squeeze
2003-03-02 Perforation Treatment Performed - Jet Perforation
2003-03-02 Well Log Performed
2009-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-15 Plug Back Performed
2009-07-15 Well Log Performed
2009-07-16 Perforation Treatment Performed - Jet Perforation
2009-07-16 Well Log Performed
2009-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-17 Perforation Treatment Performed - Cement Squeeze
2009-07-17 Plug Back Performed
2009-07-17 Well Mode changed to Abandoned Zone
2009-07-20 Perforation Treatment Performed - Jet Perforation
2009-07-20 Well Log Performed
2009-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-21 Perforation Treatment Performed - Cement Squeeze
2009-07-21 Plug Back Performed
2009-07-24 Perforation Treatment Performed - Cement Plug
2009-07-24 Perforation Treatment Performed - Cement Squeeze
2009-07-24 Perforation Treatment Performed - Jet Perforation
2009-07-24 Plug Back Performed
2009-07-24 Well Log Performed
2009-07-25 Perforation Treatment Performed - Cement Squeeze
2009-07-25 Perforation Treatment Performed - Jet Perforation
2009-09-18 Perforation Treatment Performed - Cement Squeeze
2009-09-18 Perforation Treatment Performed - Jet Perforation
2009-09-18 Well Log Performed
2009-09-19 Perforation Treatment Performed - Cement Plug
2009-09-19 Plug Back Performed
2009-09-20 Perforation Treatment Performed - Cement Plug
2009-09-20 Perforation Treatment Performed - Cement Squeeze
2009-09-20 Perforation Treatment Performed - Jet Perforation
2009-09-20 Plug Back Performed
2009-09-20 Well Log Performed
2009-09-21 Perforation Treatment Performed - Cement Plug
2009-09-21 Perforation Treatment Performed - Cement Squeeze
2009-09-21 Perforation Treatment Performed - Jet Perforation
2009-09-21 Plug Back Performed
2009-09-21 Well Log Performed
2009-09-23 Well Abandoned
2009-09-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-20 Perforation 1245.00 1247.00 7
2003-03-02 Perforation 1249.00 1252.00 17
2003-03-02 Perforation 1245.00 1247.00 17
2009-07-15 Packing Device Capped w/Cement 1227.00 1235.00 0
2009-07-16 Perforation 605.00 606.00 13
2009-07-17 Cement Squeeze 605.00 606.00 0
2009-07-17 Packing Device Capped w/Cement 586.00 600.10 0
2009-07-20 Perforation 545.50 546.50 13
2009-07-21 Cement Squeeze 545.50 546.50 0
2009-07-21 Packing Device Capped w/Cement 527.00 540.00 0
2009-07-24 Perforation 387.50 388.50 13
1979-09-20 Perforation 1249.00 1252.00 7
2009-07-24 Cement Squeeze 387.50 388.50 0
2009-07-24 Cement Plug 330.70 412.60 0
2009-07-25 Perforation 323.70 324.70 13
2009-07-25 Cement Squeeze 323.70 324.70 0
2009-09-18 Perforation 306.50 307.50 17
2009-09-18 Cement Squeeze 306.50 307.50 0
2009-09-19 Cement Plug 288.00 308.00 0
2009-09-20 Perforation 280.00 281.00 13
2009-09-20 Cement Squeeze 280.00 281.00 0
2009-09-20 Cement Plug 259.50 288.00 0
1979-09-24 Fracture 1245.00 1252.00 0
2009-09-21 Perforation 253.00 255.00 13
2009-09-21 Cement Squeeze 253.00 255.00 0
2009-09-21 Cement Plug 229.70 259.50 0
1979-09-26 Perforation 1119.50 1120.50 7
1979-09-26 Perforation 1123.00 1126.00 7
1979-09-27 Acid Treatment 1119.50 1126.00 0
1996-11-01 Perforation 1119.50 1120.50 13
1996-11-01 Perforation 1123.00 1126.00 13
1996-12-01 Cement Squeeze 1119.50 1126.00 0

For data sources see[4]



References