X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0555191405006"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0555191405006
 
| Well ID: 0555191405006
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.750124, -116.7234898 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.749015, -116.720453 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/05-14-055-19W5/6
 +
|-
 +
| Location Alias: 00/05-14-55-19 W5M
 +
|-
 +
| Location Alias 2: 00/05-14-055-19 W5/06
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 055
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 19
 +
|-
 +
| Section: 14
 +
|-
 +
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 
|-
 
|-
 
| Well Name: MANCAL PINE CK 5-14-55-19
 
| Well Name: MANCAL PINE CK 5-14-55-19
 
|-
 
|-
| Operator:
+
| Operator Name: [[Mancal Energy Inc.]]
 +
|-
 +
| License Number: 0378671
 
|-
 
|-
 
| License Date: 2007-06-27
 
| License Date: 2007-06-27
 
|-
 
|-
| Final Drilling Date: 2007-09-09
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 2007-08-18
 +
|-
 +
| Final Drill Date: 2007-09-09
 +
|-
 +
| Well Total Depth: 2825.00 m
 +
|-
 +
| Surface Hole Latitude: 53.749015
 +
|-
 +
| Surface Hole Longitude: -116.720453
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2007-06-27
 +
| Obtained License
 +
|-
 +
| 2007-08-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2007-09-09
 +
| Finished Drilling
 +
|-
 +
| 2007-09-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2007-09-10
 +
| Well Log Performed
 +
|-
 +
| 2007-09-11
 +
| Production Casing Operation Performed
 +
|-
 +
| 2007-09-12
 +
| Rig Released
 +
|-
 +
| 2007-09-20
 +
| Well Log Performed
 +
|-
 +
| 2007-09-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-09-25
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2007-09-25
 +
| Well Log Performed
 +
|-
 +
| 2007-09-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-09-26
 +
| Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
 +
|-
 +
| 2007-09-26
 +
| Plug Back Performed
 +
|-
 +
| 2007-09-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2007-09-29
 +
| Well Log Performed
 +
|-
 +
| 2007-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-10-03
 +
| Well Log Performed
 +
|-
 +
| 2007-10-08
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2008-10-01
 +
| Well Log Performed
 +
|-
 +
| 2008-10-02
 +
| Well Log Performed
 +
|-
 +
| 2008-11-12
 +
| Well Log Performed
 +
|-
 +
| 2008-11-21
 +
| Well Log Performed
 +
|-
 +
| 2010-01-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2010-01-27
 +
| Plug Back Performed
 +
|-
 +
| 2010-01-28
 +
| Well Log Performed
 +
|-
 +
| 2010-01-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-01-29
 +
| Plug Back Performed
 +
|-
 +
| 2010-01-29
 +
| Well Log Performed
 +
|-
 +
| 2010-02-10
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2010-02-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-02-20
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2010-02-21
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-02-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-03-10
 +
| Well Structure changed to Commingled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2007-09-22
 +
| Perforation
 +
| style="text-align: right;" | 2796.00
 +
| style="text-align: right;" | 2798.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2010-02-10
 +
| Fracture
 +
| style="text-align: right;" | 2641.00
 +
| style="text-align: right;" | 2642.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-02-10
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2641.00
 +
| style="text-align: right;" | 2642.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-20
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2393.00
 +
| style="text-align: right;" | 2394.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-20
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2374.00
 +
| style="text-align: right;" | 2375.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-20
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2356.00
 +
| style="text-align: right;" | 2357.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-20
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2518.00
 +
| style="text-align: right;" | 2519.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-20
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2543.00
 +
| style="text-align: right;" | 2544.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2010-02-21
 +
| Fracture
 +
| style="text-align: right;" | 2543.00
 +
| style="text-align: right;" | 2544.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-02-21
 +
| Fracture
 +
| style="text-align: right;" | 2518.00
 +
| style="text-align: right;" | 2519.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-02-22
 +
| Fracture
 +
| style="text-align: right;" | 2356.00
 +
| style="text-align: right;" | 2357.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 2796.00
 +
| style="text-align: right;" | 2798.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-02-22
 +
| Fracture
 +
| style="text-align: right;" | 2393.00
 +
| style="text-align: right;" | 2394.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 2825.0m
+
| 2010-02-22
 +
| Fracture
 +
| style="text-align: right;" | 2374.00
 +
| style="text-align: right;" | 2375.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2007-09-26
 +
| Packing Dev Cpd w/Res-Gyp Cem
 +
| style="text-align: right;" | 2791.00
 +
| style="text-align: right;" | 2795.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Not Applicable
+
| 2007-09-26
 +
| Perforation
 +
| style="text-align: right;" | 2773.00
 +
| style="text-align: right;" | 2780.00
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Well Type: Not Applicable
+
| 2007-09-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 2773.00
 +
| style="text-align: right;" | 2780.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2007-09-30
 +
| Perforation
 +
| style="text-align: right;" | 2732.00
 +
| style="text-align: right;" | 2735.00
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Violations:
+
| 2007-10-08
 +
| Fracture
 +
| style="text-align: right;" | 2732.00
 +
| style="text-align: right;" | 2735.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 53.750124
+
| 2010-01-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2773.00
 +
| style="text-align: right;" | 2780.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -116.7234898
+
| 2010-01-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2717.00
 +
| style="text-align: right;" | 2725.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:39, 18 January 2021

Well Details

Well ID: 0555191405006
Loading map...
Location: 00/05-14-055-19W5/6
Location Alias: 00/05-14-55-19 W5M
Location Alias 2: 00/05-14-055-19 W5/06
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 19
Section: 14
County/Municipality: Yellowhead County
Well Name: MANCAL PINE CK 5-14-55-19
Operator Name: Mancal Energy Inc.
License Number: 0378671
License Date: 2007-06-27
License Status: Suspension
Spud Date: 2007-08-18
Final Drill Date: 2007-09-09
Well Total Depth: 2825.00 m
Surface Hole Latitude: 53.749015
Surface Hole Longitude: -116.720453

For data sources see[1][2]

Well History

Date Event
2007-06-27 Obtained License
2007-08-21 Surface Casing Operation Performed
2007-09-09 Finished Drilling
2007-09-09 Well Mode changed to Drilled and Cased
2007-09-10 Well Log Performed
2007-09-11 Production Casing Operation Performed
2007-09-12 Rig Released
2007-09-20 Well Log Performed
2007-09-22 Perforation Treatment Performed - Jet Perforation
2007-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-25 Well Log Performed
2007-09-26 Perforation Treatment Performed - Jet Perforation
2007-09-26 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2007-09-26 Plug Back Performed
2007-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-29 Well Log Performed
2007-09-30 Perforation Treatment Performed - Jet Perforation
2007-10-03 Well Log Performed
2007-10-08 Perforation Treatment Performed - Fractured
2008-10-01 Well Log Performed
2008-10-02 Well Log Performed
2008-11-12 Well Log Performed
2008-11-21 Well Log Performed
2010-01-27 Perforation Treatment Performed - Cement Squeeze
2010-01-27 Plug Back Performed
2010-01-28 Well Log Performed
2010-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-29 Plug Back Performed
2010-01-29 Well Log Performed
2010-02-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-10 Perforation Treatment Performed - Fractured
2010-02-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-21 Perforation Treatment Performed - Fractured
2010-02-22 Perforation Treatment Performed - Fractured
2010-03-10 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-22 Perforation 2796.00 2798.00 20
2010-02-10 Fracture 2641.00 2642.00 0
2010-02-10 Hydra Jet Perforation 2641.00 2642.00 1
2010-02-20 Hydra Jet Perforation 2393.00 2394.00 1
2010-02-20 Hydra Jet Perforation 2374.00 2375.00 1
2010-02-20 Hydra Jet Perforation 2356.00 2357.00 1
2010-02-20 Hydra Jet Perforation 2518.00 2519.00 1
2010-02-20 Hydra Jet Perforation 2543.00 2544.00 1
2010-02-21 Fracture 2543.00 2544.00 0
2010-02-21 Fracture 2518.00 2519.00 0
2010-02-22 Fracture 2356.00 2357.00 0
2007-09-25 Acid Treatment 2796.00 2798.00 0
2010-02-22 Fracture 2393.00 2394.00 0
2010-02-22 Fracture 2374.00 2375.00 0
2007-09-26 Packing Dev Cpd w/Res-Gyp Cem 2791.00 2795.00 0
2007-09-26 Perforation 2773.00 2780.00 20
2007-09-28 Acid Treatment 2773.00 2780.00 0
2007-09-30 Perforation 2732.00 2735.00 20
2007-10-08 Fracture 2732.00 2735.00 0
2010-01-27 Cement Squeeze 2773.00 2780.00 0
2010-01-29 Packing Device Capped w/Cement 2717.00 2725.00 0

For data sources see[4]



References