X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0394202410023"

m
m
 
Line 396: Line 396:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:54, 18 January 2021

Well Details

Well ID: 0394202410023
Loading map...
Location: 02/10-24-039-20W4/3
Location Alias: 02/10-24-39-20 W4M
Location Alias 2: 02/10-24-039-20 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 20
Section: 24
County/Municipality: County of Stettler No. 6
Well Name: BRIGDON ET AL 102 STETN 10-24-39-20
Operator Name: Tykewest Limited
License Number: 0146974
License Date: 1990-12-17
License Status: Issued
Spud Date: 1990-12-21
Final Drill Date: 1990-12-27
Well Total Depth: 1370.00 m
Surface Hole Latitude: 52.370876
Surface Hole Longitude: -112.749415

For data sources see[1][2]

Well History

Date Event
1990-12-17 Obtained License
1990-12-22 Surface Casing Operation Performed
1990-12-27 Finished Drilling
1990-12-27 Well Log Performed
1990-12-27 Well Mode changed to Drilled and Cased
1990-12-28 Well Log Performed
1990-12-29 Drill Stem Test Performed
1990-12-30 Drill Stem Test Performed
1990-12-31 Drill Stem Test Performed
1991-01-01 Production Casing Operation Performed
1991-01-01 Rig Released
1991-01-31 Well Log Performed
1991-02-01 Perforation Treatment Performed - Jet Perforation
1991-02-01 Well Log Performed
1991-02-04 Well Log Performed
1991-02-05 Perforation Treatment Performed - Jet Perforation
1991-02-05 Well Log Performed
1997-01-07 Perforation Treatment Performed - Cement Squeeze
1997-01-07 Plug Back Performed
1997-01-15 Perforation Treatment Performed - Jet Perforation
1997-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-16 Plug Back Performed
2008-08-09 Perforation Treatment Performed - Jet Perforation
2008-08-29 Well Began Production
2008-08-29 Well Fluid changed to Gas
2008-08-29 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2011-02-04 Well Fluid changed to Gas
2011-02-04 Well Mode changed to Flowing
2011-05-30 Well Fluid changed to Gas
2011-05-30 Well Mode changed to Suspended
2014-02-01 Well Fluid changed to Gas
2014-02-01 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Suspended
2016-03-02 Well Fluid changed to Gas
2016-03-02 Well Mode changed to Flowing
2017-07-27 Well Fluid changed to Gas
2017-07-27 Well Mode changed to Suspended
2017-11-01 Well Fluid changed to Gas
2017-11-01 Well Mode changed to Flowing
2018-04-12 Well Fluid changed to Gas
2018-04-12 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-01 Perforation 1324.50 1327.50 13
1991-02-05 Perforation 1146.00 1149.50 14
1997-01-07 Cement Squeeze 1146.00 1149.50 0
1997-01-07 Cement Squeeze 1324.50 1327.50 0
1997-01-15 Perforation 1332.00 1334.50 20
1997-01-15 Perforation 1336.00 1337.50 20
1997-01-16 Packing Device Capped w/Cement 1315.00 1323.00 0
2008-08-09 Perforation 1286.70 1289.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2798 0.0 0.0 0.0
2009 8450 0.0 0.0 0.0
2010 2519 0.0 0.0 0.0
2011 2761 0.0 0.0 0.0
2014 7831 0.0 0.0 0.0
2015 2206 0.0 0.0 0.0
2016 7315 0.0 0.0 0.0
2017 6431 0.0 0.0 0.0
2018 2423 0.0 0.0 0.0

For data sources see[5]

References