If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0785210405000 | | Well ID: 0785210405000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 55.726431, -117.175600 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/05-04-078-21W5/0 | | Location: 00/05-04-078-21W5/0 | ||
+ | |- | ||
+ | | Location Alias: 00/05-04-78-21 W5M | ||
+ | |- | ||
+ | | Location Alias 2: 00/05-04-078-21 W5/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 078 | ||
+ | |- | ||
+ | | Meridian: 5 | ||
+ | |- | ||
+ | | Range: 21 | ||
+ | |- | ||
+ | | Section: 04 | ||
+ | |- | ||
+ | | County/Municipality: [[Municipal District of Smoky River No. 130,_Alberta|Municipal District of Smoky River No. 130]] | ||
|- | |- | ||
| Well Name: LONG RUN HZ NVILLE 5-4-78-21 | | Well Name: LONG RUN HZ NVILLE 5-4-78-21 | ||
+ | |- | ||
+ | | Operator Name: [[Long Run Exploration Ltd.]] | ||
+ | |- | ||
+ | | License Number: 0445257 | ||
|- | |- | ||
| License Date: 2012-04-04 | | License Date: 2012-04-04 | ||
|- | |- | ||
− | | Final Drilling Date: 2012-05- | + | | License Status: Issued |
+ | |- | ||
+ | | Spud Date: 2012-05-17 | ||
+ | |- | ||
+ | | Final Drill Date: 2012-05-27 | ||
+ | |- | ||
+ | | Well Total Depth: 2532.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 55.726431 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -117.175600 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-04-04 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2012-05-17 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-05-19 | ||
+ | | Direction Drilling Operation Performed - Deviate | ||
+ | |- | ||
+ | | 2012-05-21 | ||
+ | | Direction Drilling Operation Performed - Horizontal | ||
+ | |- | ||
+ | | 2012-05-22 | ||
+ | | Intermediate Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-05-23 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-23 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-26 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2012-06-26 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-06-26 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | == Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | | 2012-05-17 | ||
+ | | [[Trinidad Drilling Ltd.]] | ||
+ | | style="text-align: right;" | 21 | ||
+ | | style="text-align: right;" | N/A | ||
+ | | Drill To LD | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =ST49: Daily Spud and Drilling Activity List | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-09 }}</ref> | ||
+ | == Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | | 2012-05-19 | ||
+ | | style="text-align: right;" | 447.00 | ||
+ | | Deviate (5 - 79 degrees) | ||
+ | |- | ||
+ | | 2012-05-21 | ||
+ | | style="text-align: right;" | 1171.00 | ||
+ | | Horizontal | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Direction Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2484.00 | ||
+ | | style="text-align: right;" | 2484.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2169.30 | ||
+ | | style="text-align: right;" | 2169.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2132.30 | ||
+ | | style="text-align: right;" | 2132.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2099.30 | ||
+ | | style="text-align: right;" | 2099.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2064.40 | ||
+ | | style="text-align: right;" | 2064.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2027.00 | ||
+ | | style="text-align: right;" | 2027.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1994.40 | ||
+ | | style="text-align: right;" | 1994.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1959.40 | ||
+ | | style="text-align: right;" | 1959.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1922.50 | ||
+ | | style="text-align: right;" | 1922.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1889.50 | ||
+ | | style="text-align: right;" | 1889.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1854.50 | ||
+ | | style="text-align: right;" | 1854.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2449.00 | ||
+ | | style="text-align: right;" | 2449.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1819.60 | ||
+ | | style="text-align: right;" | 1819.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1784.60 | ||
+ | | style="text-align: right;" | 1784.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1749.60 | ||
+ | | style="text-align: right;" | 1749.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1714.60 | ||
+ | | style="text-align: right;" | 1714.70 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1679.70 | ||
+ | | style="text-align: right;" | 1679.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1644.70 | ||
+ | | style="text-align: right;" | 1644.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1609.70 | ||
+ | | style="text-align: right;" | 1609.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1574.80 | ||
+ | | style="text-align: right;" | 1574.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1538.80 | ||
+ | | style="text-align: right;" | 1538.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-22 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1503.80 | ||
+ | | style="text-align: right;" | 1503.90 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-21 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2414.10 | ||
+ | | style="text-align: right;" | 2414.20 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1469.80 | ||
+ | | style="text-align: right;" | 1469.90 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1434.90 | ||
+ | | style="text-align: right;" | 1435.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1399.90 | ||
+ | | style="text-align: right;" | 1400.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1365.90 | ||
+ | | style="text-align: right;" | 1366.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1330.00 | ||
+ | | style="text-align: right;" | 1330.10 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-06-23 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1295.00 | ||
+ | | style="text-align: right;" | 1295.10 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2379.10 | ||
+ | | style="text-align: right;" | 2379.20 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2344.10 | ||
+ | | style="text-align: right;" | 2344.20 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2306.20 | ||
+ | | style="text-align: right;" | 2306.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2272.20 | ||
+ | | style="text-align: right;" | 2272.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2239.20 | ||
+ | | style="text-align: right;" | 2239.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-21 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2204.20 | ||
+ | | style="text-align: right;" | 2204.30 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2012 | ||
+ | | style="text-align: right;" | 3951 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | style="text-align: right;" | 8681 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | style="text-align: right;" | 7820 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | style="text-align: right;" | 8689 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | style="text-align: right;" | 8592 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | style="text-align: right;" | 8025 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | style="text-align: right;" | 8679 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | style="text-align: right;" | 8572 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2020 | ||
+ | | style="text-align: right;" | 2183 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 2012-05-17 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2012-06-24 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0785210405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.726431,"lon":-117.1756,"icon":""}]} |
Location: 00/05-04-078-21W5/0 | |
Location Alias: 00/05-04-78-21 W5M | |
Location Alias 2: 00/05-04-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 04 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ NVILLE 5-4-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0445257 | |
License Date: 2012-04-04 | |
License Status: Issued | |
Spud Date: 2012-05-17 | |
Final Drill Date: 2012-05-27 | |
Well Total Depth: 2532.00 m | |
Surface Hole Latitude: 55.726431 | |
Surface Hole Longitude: -117.175600 |
Date | Event |
---|---|
2012-04-04 | Obtained License |
2012-05-17 | Surface Casing Operation Performed |
2012-05-19 | Direction Drilling Operation Performed - Deviate |
2012-05-21 | Direction Drilling Operation Performed - Horizontal |
2012-05-22 | Intermediate Casing Operation Performed |
2012-05-23 | Well Log Performed |
2012-05-27 | Finished Drilling |
2012-05-27 | Well Log Performed |
2012-05-27 | Well Mode changed to Drilled and Cased |
2012-05-28 | Liner Casing Operation Performed |
2012-05-29 | Rig Released |
2012-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-26 | Well Began Production |
2012-06-26 | Well Fluid changed to Crude Oil |
2012-06-26 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-05-17 | Trinidad Drilling Ltd. | 21 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-05-19 | 447.00 | Deviate (5 - 79 degrees) |
2012-05-21 | 1171.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-21 | Multi-Stage Fracture | 2484.00 | 2484.10 | 0 |
2012-06-21 | Multi-Stage Fracture | 2169.30 | 2169.40 | 0 |
2012-06-22 | Multi-Stage Fracture | 2132.30 | 2132.40 | 0 |
2012-06-22 | Multi-Stage Fracture | 2099.30 | 2099.40 | 0 |
2012-06-22 | Multi-Stage Fracture | 2064.40 | 2064.50 | 0 |
2012-06-22 | Multi-Stage Fracture | 2027.00 | 2027.10 | 0 |
2012-06-22 | Multi-Stage Fracture | 1994.40 | 1994.50 | 0 |
2012-06-22 | Multi-Stage Fracture | 1959.40 | 1959.50 | 0 |
2012-06-22 | Multi-Stage Fracture | 1922.50 | 1922.60 | 0 |
2012-06-22 | Multi-Stage Fracture | 1889.50 | 1889.60 | 0 |
2012-06-22 | Multi-Stage Fracture | 1854.50 | 1854.60 | 0 |
2012-06-21 | Multi-Stage Fracture | 2449.00 | 2449.10 | 0 |
2012-06-22 | Multi-Stage Fracture | 1819.60 | 1819.70 | 0 |
2012-06-22 | Multi-Stage Fracture | 1784.60 | 1784.70 | 0 |
2012-06-22 | Multi-Stage Fracture | 1749.60 | 1749.70 | 0 |
2012-06-22 | Multi-Stage Fracture | 1714.60 | 1714.70 | 0 |
2012-06-22 | Multi-Stage Fracture | 1679.70 | 1679.80 | 0 |
2012-06-22 | Multi-Stage Fracture | 1644.70 | 1644.80 | 0 |
2012-06-22 | Multi-Stage Fracture | 1609.70 | 1609.80 | 0 |
2012-06-22 | Multi-Stage Fracture | 1574.80 | 1574.90 | 0 |
2012-06-22 | Multi-Stage Fracture | 1538.80 | 1538.90 | 0 |
2012-06-22 | Multi-Stage Fracture | 1503.80 | 1503.90 | 0 |
2012-06-21 | Multi-Stage Fracture | 2414.10 | 2414.20 | 0 |
2012-06-23 | Multi-Stage Fracture | 1469.80 | 1469.90 | 0 |
2012-06-23 | Multi-Stage Fracture | 1434.90 | 1435.00 | 0 |
2012-06-23 | Multi-Stage Fracture | 1399.90 | 1400.00 | 0 |
2012-06-23 | Multi-Stage Fracture | 1365.90 | 1366.00 | 0 |
2012-06-23 | Multi-Stage Fracture | 1330.00 | 1330.10 | 0 |
2012-06-23 | Multi-Stage Fracture | 1295.00 | 1295.10 | 0 |
2012-06-21 | Multi-Stage Fracture | 2379.10 | 2379.20 | 0 |
2012-06-21 | Multi-Stage Fracture | 2344.10 | 2344.20 | 0 |
2012-06-21 | Multi-Stage Fracture | 2306.20 | 2306.30 | 0 |
2012-06-21 | Multi-Stage Fracture | 2272.20 | 2272.30 | 0 |
2012-06-21 | Multi-Stage Fracture | 2239.20 | 2239.30 | 0 |
2012-06-21 | Multi-Stage Fracture | 2204.20 | 2204.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3951 | 0.0 | 0.0 | 0.0 |
2013 | 8681 | 0.0 | 0.0 | 0.0 |
2014 | 7820 | 0.0 | 0.0 | 0.0 |
2015 | 8689 | 0.0 | 0.0 | 0.0 |
2016 | 8592 | 0.0 | 0.0 | 0.0 |
2017 | 8025 | 0.0 | 0.0 | 0.0 |
2018 | 8679 | 0.0 | 0.0 | 0.0 |
2019 | 8572 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-17 | No Incident Encountered | 0.00 | 0.00 |
2012-06-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]