X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0785243603000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0785243603000
 
| Well ID: 0785243603000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.8049570000000017, -117.6008099999999672 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.804957, -117.600810 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-36-078-24W5/0
 
| Location: 00/03-36-078-24W5/0
 +
|-
 +
| Location Alias: 00/03-36-78-24 W5M
 +
|-
 +
| Location Alias 2: 00/03-36-078-24 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 078
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 36
 +
|-
 +
| County/Municipality: [[Birch Hills County,_Alberta|Birch Hills County]]
 
|-
 
|-
 
| Well Name: WESTBOW CULP 3-36-78-24
 
| Well Name: WESTBOW CULP 3-36-78-24
 +
|-
 +
| Operator Name: [[Shoreline Energy Corp.]]
 +
|-
 +
| License Number: 0345559
 
|-
 
|-
 
| License Date: 2005-12-14
 
| License Date: 2005-12-14
 
|-
 
|-
| Final Drilling Date: 2006-03-13
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 2006-03-02
 +
|-
 +
| Final Drill Date: 2006-03-13
 +
|-
 +
| Well Total Depth: 1830.00 m
 +
|-
 +
| Surface Hole Latitude: 55.804957
 +
|-
 +
| Surface Hole Longitude: -117.600810
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-12-14
 +
| Obtained License
 +
|-
 +
| 2006-03-04
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2006-03-05
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2006-03-13
 +
| Finished Drilling
 +
|-
 +
| 2006-03-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2006-03-15
 +
| Well Log Performed
 +
|-
 +
| 2006-03-17
 +
| Production Casing Operation Performed
 +
|-
 +
| 2006-03-17
 +
| Rig Released
 +
|-
 +
| 2006-05-15
 +
| Well Log Performed
 +
|-
 +
| 2006-05-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-05-18
 +
| Well Log Performed
 +
|-
 +
| 2006-05-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-06-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-06-02
 +
| Plug Back Performed
 +
|-
 +
| 2006-06-02
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2006-06-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-06-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-06-03
 +
| Plug Back Performed
 +
|-
 +
| 2006-06-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-06-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-06-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-06-07
 +
| Plug Back Performed
 +
|-
 +
| 2006-06-08
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 1830.0m
+
| 2006-11-20
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2006-11-20
 +
| Plug Back Performed
 
|-
 
|-
| Status: Abandoned Zone
+
| 2006-11-25
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 2017-07-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Configuration: Vertical
+
| 2017-07-24
 +
| Plug Back Performed
 
|-
 
|-
| Latitude: 55.8049570000000017
+
| 2017-07-25
 +
| Well Abandoned
 
|-
 
|-
| Longitude: -117.6008099999999672
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
 +
|}-->
  
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2006-03-05
 +
| style="text-align: right;" | 316.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2006-05-18
 +
| Perforation
 +
| style="text-align: right;" | 1623.00
 +
| style="text-align: right;" | 1626.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-06-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1245.00
 +
| style="text-align: right;" | 1253.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-07
 +
| Perforation
 +
| style="text-align: right;" | 1126.00
 +
| style="text-align: right;" | 1130.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-06-08
 +
| Perforation
 +
| style="text-align: right;" | 1121.20
 +
| style="text-align: right;" | 1123.20
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-11-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1126.00
 +
| style="text-align: right;" | 1130.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-11-25
 +
| Perforation
 +
| style="text-align: right;" | 1121.00
 +
| style="text-align: right;" | 1123.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2017-07-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1105.00
 +
| style="text-align: right;" | 1115.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-18
 +
| Perforation
 +
| style="text-align: right;" | 1592.00
 +
| style="text-align: right;" | 1594.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-05-19
 +
| Fracture
 +
| style="text-align: right;" | 1623.00
 +
| style="text-align: right;" | 1626.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-19
 +
| Fracture
 +
| style="text-align: right;" | 1592.00
 +
| style="text-align: right;" | 1594.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1604.00
 +
| style="text-align: right;" | 1612.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1577.00
 +
| style="text-align: right;" | 1585.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-03
 +
| Perforation
 +
| style="text-align: right;" | 1389.50
 +
| style="text-align: right;" | 1391.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-06-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1372.00
 +
| style="text-align: right;" | 1380.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-04
 +
| Perforation
 +
| style="text-align: right;" | 1259.00
 +
| style="text-align: right;" | 1262.00
 +
| style="text-align: right;" | 17
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:01, 18 January 2021

Well Details

Well ID: 0785243603000
Loading map...
Location: 00/03-36-078-24W5/0
Location Alias: 00/03-36-78-24 W5M
Location Alias 2: 00/03-36-078-24 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 24
Section: 36
County/Municipality: Birch Hills County
Well Name: WESTBOW CULP 3-36-78-24
Operator Name: Shoreline Energy Corp.
License Number: 0345559
License Date: 2005-12-14
License Status: Abandoned
Spud Date: 2006-03-02
Final Drill Date: 2006-03-13
Well Total Depth: 1830.00 m
Surface Hole Latitude: 55.804957
Surface Hole Longitude: -117.600810

For data sources see[1][2]

Well History

Date Event
2005-12-14 Obtained License
2006-03-04 Surface Casing Operation Performed
2006-03-05 Direction Drilling Operation Performed - Deviate
2006-03-13 Finished Drilling
2006-03-13 Well Mode changed to Drilled and Cased
2006-03-15 Well Log Performed
2006-03-17 Production Casing Operation Performed
2006-03-17 Rig Released
2006-05-15 Well Log Performed
2006-05-18 Perforation Treatment Performed - Jet Perforation
2006-05-18 Well Log Performed
2006-05-19 Perforation Treatment Performed - Fractured
2006-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-02 Plug Back Performed
2006-06-02 Well Mode changed to Abandoned Zone
2006-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-03 Perforation Treatment Performed - Jet Perforation
2006-06-03 Plug Back Performed
2006-06-04 Perforation Treatment Performed - Jet Perforation
2006-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-07 Perforation Treatment Performed - Jet Perforation
2006-06-07 Plug Back Performed
2006-06-08 Perforation Treatment Performed - Jet Perforation
2006-11-20 Perforation Treatment Performed - Cement Squeeze
2006-11-20 Plug Back Performed
2006-11-25 Perforation Treatment Performed - Jet Perforation
2017-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-24 Plug Back Performed
2017-07-25 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-03-05 316.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-18 Perforation 1623.00 1626.00 20
2006-06-07 Packing Device Capped w/Cement 1245.00 1253.00 0
2006-06-07 Perforation 1126.00 1130.00 17
2006-06-08 Perforation 1121.20 1123.20 17
2006-11-20 Cement Squeeze 1126.00 1130.00 0
2006-11-25 Perforation 1121.00 1123.00 17
2017-07-24 Packing Device Capped w/Cement 1105.00 1115.00 0
2006-05-18 Perforation 1592.00 1594.00 20
2006-05-19 Fracture 1623.00 1626.00 0
2006-05-19 Fracture 1592.00 1594.00 0
2006-06-02 Packing Device Capped w/Cement 1604.00 1612.00 0
2006-06-02 Packing Device Capped w/Cement 1577.00 1585.00 0
2006-06-03 Perforation 1389.50 1391.00 17
2006-06-03 Packing Device Capped w/Cement 1372.00 1380.00 0
2006-06-04 Perforation 1259.00 1262.00 17

For data sources see[5]



References