X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0565012902003"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0565012902003
 
| Well ID: 0565012902003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.8629567, -114.1105222 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.863300, -114.112721 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/02-29-056-01W5/3
 +
|-
 +
| Location Alias: 00/02-29-56-01 W5M
 +
|-
 +
| Location Alias 2: 00/02-29-056-01 W5/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 056
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 01
 +
|-
 +
| Section: 29
 +
|-
 +
| County/Municipality: [[County of Barrhead No. 11,_Alberta|County of Barrhead No. 11]]
 
|-
 
|-
 
| Well Name: DAYLIGHT  ALEX 2-29-56-1
 
| Well Name: DAYLIGHT  ALEX 2-29-56-1
 
|-
 
|-
| Operator:
+
| Operator Name: [[Sinopec Daylight Energy Ltd.]]
 +
|-
 +
| License Number: 0267140
 
|-
 
|-
 
| License Date: 2002-02-01
 
| License Date: 2002-02-01
 
|-
 
|-
| Final Drilling Date: 2002-02-17
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 2002-02-12
 +
|-
 +
| Final Drill Date: 2002-02-17
 +
|-
 +
| Well Total Depth: 1249.00 m
 +
|-
 +
| Surface Hole Latitude: 53.863300
 +
|-
 +
| Surface Hole Longitude: -114.112721
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-02-01
 +
| Obtained License
 +
|-
 +
| 2002-02-17
 +
| Finished Drilling
 +
|-
 +
| 2002-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-02-17
 +
| Rig Released
 +
|-
 +
| 2002-02-17
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-08-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-08-23
 +
| Well Began Production
 +
|-
 +
| 2002-08-23
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2002-08-23
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2007-07-26
 +
| Well Log Performed
 +
|-
 +
| 2007-07-27
 +
| Well Log Performed
 +
|-
 +
| 2007-07-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-07-30
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-07-30
 +
| Well Log Performed
 +
|-
 +
| 2007-08-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-08-03
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-08-04
 +
| Well Log Performed
 +
|-
 +
| 2007-08-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-08-08
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Total Depth: 1249.0m
+
| 2007-08-08
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Gas
+
| 2007-08-15
 +
| Well Log Performed
 
|-
 
|-
| Status: Abandoned
+
| 2007-09-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Well Type: Not Applicable
+
| 2007-09-09
 +
| Plug Back Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2007-09-09
 +
| Well Fluid changed to Gas
 
|-
 
|-
| Violations:
+
| 2007-09-09
 +
| Well Mode changed to Abandoned Zone
 
|-
 
|-
| Latitude: 53.8629567
+
| 2007-09-11
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 
|-
 
|-
| Longitude: -114.1105222
+
| 2007-09-12
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-09-12
 +
| Well Log Performed
 +
|-
 +
| 2007-09-19
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2007-09-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-01-08
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2008-01-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-26
 +
| Well Abandoned
 +
|-
 +
| 2008-02-26
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2008-02-26
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2002-02-17
 +
| Perforation
 +
| style="text-align: right;" | 983.00
 +
| style="text-align: right;" | 985.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-08-07
 +
| Perforation
 +
| style="text-align: right;" | 276.50
 +
| style="text-align: right;" | 277.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-08-08
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 276.00
 +
| style="text-align: right;" | 278.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 963.00
 +
| style="text-align: right;" | 981.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-11
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 475.00
 +
| style="text-align: right;" | 479.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2007-09-12
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 475.00
 +
| style="text-align: right;" | 479.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-19
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 272.00
 +
| style="text-align: right;" | 279.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2007-09-20
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 272.00
 +
| style="text-align: right;" | 279.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-01-08
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 190.00
 +
| style="text-align: right;" | 194.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2008-01-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 190.00
 +
| style="text-align: right;" | 194.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-08-21
 +
| Perforation
 +
| style="text-align: right;" | 972.00
 +
| style="text-align: right;" | 974.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2007-07-29
 +
| Perforation
 +
| style="text-align: right;" | 242.00
 +
| style="text-align: right;" | 243.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2007-07-29
 +
| Perforation
 +
| style="text-align: right;" | 235.50
 +
| style="text-align: right;" | 236.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-07-29
 +
| Perforation
 +
| style="text-align: right;" | 235.80
 +
| style="text-align: right;" | 236.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-07-30
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 235.50
 +
| style="text-align: right;" | 243.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-08-03
 +
| Perforation
 +
| style="text-align: right;" | 205.00
 +
| style="text-align: right;" | 207.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2007-08-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 205.00
 +
| style="text-align: right;" | 207.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-08-07
 +
| Perforation
 +
| style="text-align: right;" | 276.00
 +
| style="text-align: right;" | 278.00
 +
| style="text-align: right;" | 13
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2002
 +
| style="text-align: right;" | 973
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 927
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:03, 18 January 2021

Well Details

Well ID: 0565012902003
Loading map...
Location: 00/02-29-056-01W5/3
Location Alias: 00/02-29-56-01 W5M
Location Alias 2: 00/02-29-056-01 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 01
Section: 29
County/Municipality: County of Barrhead No. 11
Well Name: DAYLIGHT ALEX 2-29-56-1
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0267140
License Date: 2002-02-01
License Status: RecCertified
Spud Date: 2002-02-12
Final Drill Date: 2002-02-17
Well Total Depth: 1249.00 m
Surface Hole Latitude: 53.863300
Surface Hole Longitude: -114.112721

For data sources see[1][2]

Well History

Date Event
2002-02-01 Obtained License
2002-02-17 Finished Drilling
2002-02-17 Perforation Treatment Performed - Jet Perforation
2002-02-17 Rig Released
2002-02-17 Well Mode changed to Drilled and Cased
2002-08-21 Perforation Treatment Performed - Jet Perforation
2002-08-23 Well Began Production
2002-08-23 Well Fluid changed to Gas
2002-08-23 Well Mode changed to Flowing
2007-07-26 Well Log Performed
2007-07-27 Well Log Performed
2007-07-29 Perforation Treatment Performed - Jet Perforation
2007-07-30 Perforation Treatment Performed - Remedial Casing
2007-07-30 Well Log Performed
2007-08-03 Perforation Treatment Performed - Jet Perforation
2007-08-03 Perforation Treatment Performed - Remedial Casing
2007-08-04 Well Log Performed
2007-08-07 Perforation Treatment Performed - Jet Perforation
2007-08-08 Perforation Treatment Performed - Remedial Casing
2007-08-08 Well Log Performed
2007-08-15 Well Log Performed
2007-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-09 Plug Back Performed
2007-09-09 Well Fluid changed to Gas
2007-09-09 Well Mode changed to Abandoned Zone
2007-09-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-09-12 Perforation Treatment Performed - Remedial Casing
2007-09-12 Well Log Performed
2007-09-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-09-20 Perforation Treatment Performed - Remedial Casing
2008-01-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-01-29 Perforation Treatment Performed - Remedial Casing
2008-02-26 Well Abandoned
2008-02-26 Well Fluid changed to Gas
2008-02-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-17 Perforation 983.00 985.00 17
2007-08-07 Perforation 276.50 277.40 13
2007-08-08 Remedial Casing Cementing 276.00 278.00 0
2007-09-09 Packing Device Capped w/Cement 963.00 981.00 0
2007-09-11 Hydra Jet Perforation 475.00 479.00 1
2007-09-12 Remedial Casing Cementing 475.00 479.00 0
2007-09-19 Hydra Jet Perforation 272.00 279.00 1
2007-09-20 Remedial Casing Cementing 272.00 279.00 0
2008-01-08 Hydra Jet Perforation 190.00 194.00 1
2008-01-29 Remedial Casing Cementing 190.00 194.00 0
2002-08-21 Perforation 972.00 974.00 20
2007-07-29 Perforation 242.00 243.00 14
2007-07-29 Perforation 235.50 236.50 17
2007-07-29 Perforation 235.80 236.10 17
2007-07-30 Remedial Casing Cementing 235.50 243.00 0
2007-08-03 Perforation 205.00 207.00 14
2007-08-03 Remedial Casing Cementing 205.00 207.00 0
2007-08-07 Perforation 276.00 278.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 973 0.0 0.0 0.0
2006 927 0.0 0.0 0.0

For data sources see[5]

References