If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0485041204000 | | Well ID: 0485041204000 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.124021, -114.437399 | width=100% | height=100% }} |
| + | |- | ||
| + | | Location: 00/04-12-048-04W5/0 | ||
| + | |- | ||
| + | | Location Alias: 00/04-12-48-04 W5M | ||
| + | |- | ||
| + | | Location Alias 2: 00/04-12-048-04 W5/00 | ||
| + | |- | ||
| + | | Country: Canada | ||
| + | |- | ||
| + | | Province: Alberta | ||
| + | |- | ||
| + | | Township: 048 | ||
| + | |- | ||
| + | | Meridian: 5 | ||
| + | |- | ||
| + | | Range: 04 | ||
| + | |- | ||
| + | | Section: 12 | ||
| + | |- | ||
| + | | County/Municipality: [[Brazeau County,_Alberta|Brazeau County]] | ||
|- | |- | ||
| Well Name: SDEL ET AL HZ PEMBINA 4-12-48-4 | | Well Name: SDEL ET AL HZ PEMBINA 4-12-48-4 | ||
|- | |- | ||
| − | | Operator: | + | | Operator Name: [[Sinopec Daylight Energy Ltd.]] |
| + | |- | ||
| + | | License Number: 0446702 | ||
|- | |- | ||
| License Date: 2012-06-21 | | License Date: 2012-06-21 | ||
|- | |- | ||
| − | | Final Drilling Date | + | | License Status: Issued |
| + | |- | ||
| + | | Spud Date: 2012-07-17 | ||
| + | |- | ||
| + | | Final Drill Date: 2012-07-23 | ||
| + | |- | ||
| + | | Well Total Depth: 2952.00 m | ||
| + | |- | ||
| + | | Surface Hole Latitude: 53.124021 | ||
| + | |- | ||
| + | | Surface Hole Longitude: -114.437399 | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Licensing Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
| + | | title = General Well Data File - Drilling Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Well History == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Date | ||
| + | !scope="col" | Event | ||
| + | |- | ||
| + | | 2012-06-21 | ||
| + | | Obtained License | ||
| + | |- | ||
| + | | 2012-07-18 | ||
| + | | Surface Casing Operation Performed | ||
| + | |- | ||
| + | | 2012-07-19 | ||
| + | | Direction Drilling Operation Performed - Deviate | ||
| + | |- | ||
| + | | 2012-07-19 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-07-20 | ||
| + | | Direction Drilling Operation Performed - Horizontal | ||
| + | |- | ||
| + | | 2012-07-20 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-07-23 | ||
| + | | Finished Drilling | ||
| + | |- | ||
| + | | 2012-07-23 | ||
| + | | Well Log Performed | ||
|- | |- | ||
| − | | | + | | 2012-07-23 |
| + | | Well Mode changed to Drilled and Cased | ||
|- | |- | ||
| − | | | + | | 2012-07-25 |
| + | | Production Casing Operation Performed | ||
|- | |- | ||
| − | | | + | | 2012-07-25 |
| + | | Rig Released | ||
|- | |- | ||
| − | | Well | + | | 2012-08-13 |
| + | | Well Log Performed | ||
|- | |- | ||
| − | | | + | | 2012-08-20 |
| + | | Perforation Treatment Performed - Multi-Stage Fracture | ||
|- | |- | ||
| − | | | + | | 2012-08-20 |
| + | | Perforation Treatment Performed - Open-Hole Completion | ||
|- | |- | ||
| − | | | + | | 2012-08-20 |
| + | | Well Began Production | ||
|- | |- | ||
| − | | | + | | 2012-08-20 |
| + | | Well Fluid changed to Crude Oil | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Well Mode changed to Pumping | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-04-29 }}</ref> | ||
| + | == Spud Table == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Spud Date | ||
| + | !scope="col" | Contractor | ||
| + | !scope="col" style="text-align: right;" | Rig Number | ||
| + | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
| + | !scope="col" | Activity Type | ||
| + | |- | ||
| + | | 2012-07-17 | ||
| + | | [[Nabors Drilling Limited]] | ||
| + | | style="text-align: right;" | 3 | ||
| + | | style="text-align: right;" | N/A | ||
| + | | Drill To LD | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title =ST49: Daily Spud and Drilling Activity List | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-30 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-09 }}</ref> | ||
| + | == Directional Drilling == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Start Date | ||
| + | !scope="col" style="text-align: right;" | Depth (m) | ||
| + | !scope="col" | Reason | ||
| + | |- | ||
| + | | 2012-07-19 | ||
| + | | style="text-align: right;" | 1031.10 | ||
| + | | Deviate (5 - 79 degrees) | ||
| + | |- | ||
| + | | 2012-07-20 | ||
| + | | style="text-align: right;" | 1456.00 | ||
| + | | Horizontal | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Direction Drilling Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Perforation Treatments == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Perforation Date | ||
| + | !scope="col" | Perforation Type | ||
| + | !scope="col" style="text-align: right;" | Interval Top (m) | ||
| + | !scope="col" style="text-align: right;" | Interval Base (m) | ||
| + | !scope="col" style="text-align: right;" | Number of Shots | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Open Hole/Barefoot Completion | ||
| + | | style="text-align: right;" | 2947.00 | ||
| + | | style="text-align: right;" | 2952.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2301.40 | ||
| + | | style="text-align: right;" | 2301.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2225.90 | ||
| + | | style="text-align: right;" | 2226.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2150.40 | ||
| + | | style="text-align: right;" | 2150.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2075.30 | ||
| + | | style="text-align: right;" | 2075.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1999.80 | ||
| + | | style="text-align: right;" | 1999.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1924.30 | ||
| + | | style="text-align: right;" | 1924.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1849.20 | ||
| + | | style="text-align: right;" | 1849.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1774.20 | ||
| + | | style="text-align: right;" | 1774.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1698.70 | ||
| + | | style="text-align: right;" | 1698.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1623.20 | ||
| + | | style="text-align: right;" | 1623.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2911.90 | ||
| + | | style="text-align: right;" | 2912.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1559.70 | ||
| + | | style="text-align: right;" | 1559.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2841.40 | ||
| + | | style="text-align: right;" | 2841.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2766.20 | ||
| + | | style="text-align: right;" | 2766.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2690.90 | ||
| + | | style="text-align: right;" | 2691.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2615.30 | ||
| + | | style="text-align: right;" | 2615.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2539.70 | ||
| + | | style="text-align: right;" | 2539.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2452.20 | ||
| + | | style="text-align: right;" | 2452.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-08-20 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2376.60 | ||
| + | | style="text-align: right;" | 2376.70 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | <!--== Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Job Start Date | ||
| + | !scope="col" | Job End Date | ||
| + | !scope="col" | True Vertical Depth (ft) | ||
| + | !scope="col" | Total Water Volume (gal) | ||
| + | !scope="col" | Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Trade Name | ||
| + | !scope="col" | Supplier | ||
| + | !scope="col" | Purpose | ||
| + | !scope="col" | Ingredient Name | ||
| + | !scope="col" | CAS Number | ||
| + | !scope="col" | Additive Percentage by Mass | ||
| + | !scope="col" | Job Percentage by Mass | ||
| + | !scope="col" | Mass Used (lb) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | <!--== Water Sources == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Water Diversion Start Date | ||
| + | !scope="col" | Water Diversion End Date | ||
| + | !scope="col" | Water Source Type | ||
| + | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | == Production Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Period | ||
| + | !scope="col" style="text-align: right;" | Total Production Hours | ||
| + | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
| + | |- | ||
| + | | 2012 | ||
| + | | style="text-align: right;" | 3014 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2013 | ||
| + | | style="text-align: right;" | 8537 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2014 | ||
| + | | style="text-align: right;" | 8677 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2015 | ||
| + | | style="text-align: right;" | 8729 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2016 | ||
| + | | style="text-align: right;" | 984 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2017 | ||
| + | | style="text-align: right;" | 8600 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2018 | ||
| + | | style="text-align: right;" | 8000 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2019 | ||
| + | | style="text-align: right;" | 8638 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2020 | ||
| + | | style="text-align: right;" | 2183 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Well Production Data - All Alberta | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-25 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Occurences == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Occurence Date | ||
| + | !scope="col" | Occurence Type | ||
| + | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
| + | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
| + | |- | ||
| + | | 2012-07-25 | ||
| + | | No Incident Encountered | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | |- | ||
| + | | 2012-08-31 | ||
| + | | No Incident Encountered | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Occurence Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
| − | + | <references/> | |
| − | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
| − | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
| Well ID: 0485041204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.124021,"lon":-114.437399,"icon":""}]} |
| Location: 00/04-12-048-04W5/0 | |
| Location Alias: 00/04-12-48-04 W5M | |
| Location Alias 2: 00/04-12-048-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 12 | |
| County/Municipality: Brazeau County | |
| Well Name: SDEL ET AL HZ PEMBINA 4-12-48-4 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0446702 | |
| License Date: 2012-06-21 | |
| License Status: Issued | |
| Spud Date: 2012-07-17 | |
| Final Drill Date: 2012-07-23 | |
| Well Total Depth: 2952.00 m | |
| Surface Hole Latitude: 53.124021 | |
| Surface Hole Longitude: -114.437399 |
| Date | Event |
|---|---|
| 2012-06-21 | Obtained License |
| 2012-07-18 | Surface Casing Operation Performed |
| 2012-07-19 | Direction Drilling Operation Performed - Deviate |
| 2012-07-19 | Well Log Performed |
| 2012-07-20 | Direction Drilling Operation Performed - Horizontal |
| 2012-07-20 | Well Log Performed |
| 2012-07-23 | Finished Drilling |
| 2012-07-23 | Well Log Performed |
| 2012-07-23 | Well Mode changed to Drilled and Cased |
| 2012-07-25 | Production Casing Operation Performed |
| 2012-07-25 | Rig Released |
| 2012-08-13 | Well Log Performed |
| 2012-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-20 | Well Began Production |
| 2012-08-20 | Well Fluid changed to Crude Oil |
| 2012-08-20 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-07-17 | Nabors Drilling Limited | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-07-19 | 1031.10 | Deviate (5 - 79 degrees) |
| 2012-07-20 | 1456.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-20 | Open Hole/Barefoot Completion | 2947.00 | 2952.00 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2301.40 | 2301.50 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2225.90 | 2226.00 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2150.40 | 2150.50 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2075.30 | 2075.40 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1999.80 | 1999.90 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1924.30 | 1924.40 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1849.20 | 1849.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1774.20 | 1774.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1698.70 | 1698.80 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1623.20 | 1623.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2911.90 | 2912.00 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 1559.70 | 1559.80 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2841.40 | 2841.50 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2766.20 | 2766.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2690.90 | 2691.00 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2615.30 | 2615.40 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2539.70 | 2539.80 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2452.20 | 2452.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 2376.60 | 2376.70 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3014 | 0.0 | 0.0 | 0.0 |
| 2013 | 8537 | 0.0 | 0.0 | 0.0 |
| 2014 | 8677 | 0.0 | 0.0 | 0.0 |
| 2015 | 8729 | 0.0 | 0.0 | 0.0 |
| 2016 | 984 | 0.0 | 0.0 | 0.0 |
| 2017 | 8600 | 0.0 | 0.0 | 0.0 |
| 2018 | 8000 | 0.0 | 0.0 | 0.0 |
| 2019 | 8638 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-25 | No Incident Encountered | 0.00 | 0.00 |
| 2012-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]