X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0565263516000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0565263516000
 
| Well ID: 0565263516000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.8882837, -117.7456906 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.887072, -117.746540 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: SCL HARLEY 16-35-56-26
+
| Location: 00/16-35-056-26W5/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/16-35-56-26 W5M
 +
|-
 +
| Location Alias 2: 00/16-35-056-26 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 056
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 35
 +
|-
 +
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 +
|-
 +
| Well Name: TOURMALINE WILD RIV 16-35-56-26
 +
|-
 +
| Operator Name: [[Tourmaline Oil Corp.]]
 +
|-
 +
| License Number: 0407403
 
|-
 
|-
 
| License Date: 2009-01-07
 
| License Date: 2009-01-07
 
|-
 
|-
| Final Drilling Date: 2009-03-15
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2009-02-16
 +
|-
 +
| Final Drill Date: 2009-03-15
 +
|-
 +
| Well Total Depth: 3411.00 m
 +
|-
 +
| Surface Hole Latitude: 53.887072
 +
|-
 +
| Surface Hole Longitude: -117.746540
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-01-07
 +
| Obtained License
 +
|-
 +
| 2009-02-17
 +
| Lost Circulation Occurred
 +
|-
 +
| 2009-02-20
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2009-02-23
 +
| Lost Circulation Occurred
 +
|-
 +
| 2009-03-02
 +
| Well Log Performed
 +
|-
 +
| 2009-03-04
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2009-03-15
 +
| Finished Drilling
 
|-
 
|-
| Total Depth: 3411.0m
+
| 2009-03-15
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Gas
+
| 2009-03-15
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Status: Pumping
+
| 2009-03-16
 +
| Production Casing Operation Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-03-17
 +
| Rig Released
 
|-
 
|-
| Configuration: Vertical
+
| 2009-08-18
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Violations:
+
| 2009-08-18
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 53.8882837
+
| 2009-08-19
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Longitude: -117.7456906
+
| 2009-08-21
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-08-23
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-23
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-08-24
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-24
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-08-26
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-27
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-08-28
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-08-29
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2009-08-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-10-09
 +
| Well Began Production
 +
|-
 +
| 2009-10-09
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2009-10-09
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2014-08-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2014-08-01
 +
| Well Mode changed to Pumping
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2009-08-18
 +
| Perforation
 +
| style="text-align: right;" | 3384.30
 +
| style="text-align: right;" | 3385.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-08-23
 +
| Fracture
 +
| style="text-align: right;" | 3321.50
 +
| style="text-align: right;" | 3330.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3262.00
 +
| style="text-align: right;" | 3262.10
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3255.50
 +
| style="text-align: right;" | 3255.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3252.00
 +
| style="text-align: right;" | 3252.10
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Fracture
 +
| style="text-align: right;" | 3252.00
 +
| style="text-align: right;" | 3262.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3222.50
 +
| style="text-align: right;" | 3222.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3218.50
 +
| style="text-align: right;" | 3218.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3215.50
 +
| style="text-align: right;" | 3215.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-24
 +
| Fracture
 +
| style="text-align: right;" | 3215.50
 +
| style="text-align: right;" | 3222.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-24
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3200.50
 +
| style="text-align: right;" | 3200.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-18
 +
| Perforation
 +
| style="text-align: right;" | 3379.00
 +
| style="text-align: right;" | 3379.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-08-24
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3190.50
 +
| style="text-align: right;" | 3190.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-24
 +
| Fracture
 +
| style="text-align: right;" | 3190.50
 +
| style="text-align: right;" | 3200.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-26
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3176.50
 +
| style="text-align: right;" | 3176.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-26
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3169.50
 +
| style="text-align: right;" | 3169.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-27
 +
| Fracture
 +
| style="text-align: right;" | 3169.50
 +
| style="text-align: right;" | 3176.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-27
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3059.50
 +
| style="text-align: right;" | 3059.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-27
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3055.50
 +
| style="text-align: right;" | 3055.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-27
 +
| Fracture
 +
| style="text-align: right;" | 3055.50
 +
| style="text-align: right;" | 3059.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-27
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3031.40
 +
| style="text-align: right;" | 3031.50
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-27
 +
| Fracture
 +
| style="text-align: right;" | 3031.40
 +
| style="text-align: right;" | 3031.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-19
 +
| Fracture
 +
| style="text-align: right;" | 3379.00
 +
| style="text-align: right;" | 3385.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-27
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2990.50
 +
| style="text-align: right;" | 2990.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-28
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2987.50
 +
| style="text-align: right;" | 2987.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-28
 +
| Fracture
 +
| style="text-align: right;" | 2987.50
 +
| style="text-align: right;" | 2990.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-28
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2863.00
 +
| style="text-align: right;" | 2863.10
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-28
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2857.50
 +
| style="text-align: right;" | 2857.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-28
 +
| Fracture
 +
| style="text-align: right;" | 2857.50
 +
| style="text-align: right;" | 2863.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-29
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2442.50
 +
| style="text-align: right;" | 2442.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-29
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2437.50
 +
| style="text-align: right;" | 2437.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-29
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2433.50
 +
| style="text-align: right;" | 2433.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-29
 +
| Fracture
 +
| style="text-align: right;" | 2433.50
 +
| style="text-align: right;" | 2442.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-21
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3364.50
 +
| style="text-align: right;" | 3364.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-21
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3349.50
 +
| style="text-align: right;" | 3349.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-22
 +
| Fracture
 +
| style="text-align: right;" | 3349.50
 +
| style="text-align: right;" | 3364.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3330.50
 +
| style="text-align: right;" | 3330.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3325.50
 +
| style="text-align: right;" | 3325.60
 +
| style="text-align: right;" | 3
 +
|-
 +
| 2009-08-23
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 3321.50
 +
| style="text-align: right;" | 3321.60
 +
| style="text-align: right;" | 3
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 1939
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8480
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 7807
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8541
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8663
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8640
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8783
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 7129
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 4178
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8524
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2183
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2009-02-17
 +
| Lost Circulation
 +
| style="text-align: right;" | 112.00
 +
| style="text-align: right;" | 614.00
 +
|-
 +
| 2009-02-23
 +
| Lost Circulation
 +
| style="text-align: right;" | 1031.00
 +
| style="text-align: right;" | 2150.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 23:20, 18 January 2021

Well Details

Well ID: 0565263516000
Loading map...
Location: 00/16-35-056-26W5/0
Location Alias: 00/16-35-56-26 W5M
Location Alias 2: 00/16-35-056-26 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 26
Section: 35
County/Municipality: Yellowhead County
Well Name: TOURMALINE WILD RIV 16-35-56-26
Operator Name: Tourmaline Oil Corp.
License Number: 0407403
License Date: 2009-01-07
License Status: Issued
Spud Date: 2009-02-16
Final Drill Date: 2009-03-15
Well Total Depth: 3411.00 m
Surface Hole Latitude: 53.887072
Surface Hole Longitude: -117.746540

For data sources see[1][2]

Well History

Date Event
2009-01-07 Obtained License
2009-02-17 Lost Circulation Occurred
2009-02-20 Surface Casing Operation Performed
2009-02-23 Lost Circulation Occurred
2009-03-02 Well Log Performed
2009-03-04 Intermediate Casing Operation Performed
2009-03-15 Finished Drilling
2009-03-15 Well Log Performed
2009-03-15 Well Mode changed to Drilled and Cased
2009-03-16 Production Casing Operation Performed
2009-03-17 Rig Released
2009-08-18 Perforation Treatment Performed - Jet Perforation
2009-08-18 Well Log Performed
2009-08-19 Perforation Treatment Performed - Fractured
2009-08-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-22 Perforation Treatment Performed - Fractured
2009-08-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-23 Perforation Treatment Performed - Fractured
2009-08-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-24 Perforation Treatment Performed - Fractured
2009-08-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-27 Perforation Treatment Performed - Fractured
2009-08-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-28 Perforation Treatment Performed - Fractured
2009-08-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-29 Perforation Treatment Performed - Fractured
2009-10-09 Well Began Production
2009-10-09 Well Fluid changed to Gas
2009-10-09 Well Mode changed to Flowing
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-08-18 Perforation 3384.30 3385.00 20
2009-08-23 Fracture 3321.50 3330.60 0
2009-08-23 Hydra Jet Perforation 3262.00 3262.10 3
2009-08-23 Hydra Jet Perforation 3255.50 3255.60 3
2009-08-23 Hydra Jet Perforation 3252.00 3252.10 3
2009-08-23 Fracture 3252.00 3262.10 0
2009-08-23 Hydra Jet Perforation 3222.50 3222.60 3
2009-08-23 Hydra Jet Perforation 3218.50 3218.60 3
2009-08-23 Hydra Jet Perforation 3215.50 3215.60 3
2009-08-24 Fracture 3215.50 3222.60 0
2009-08-24 Hydra Jet Perforation 3200.50 3200.60 3
2009-08-18 Perforation 3379.00 3379.80 20
2009-08-24 Hydra Jet Perforation 3190.50 3190.60 3
2009-08-24 Fracture 3190.50 3200.60 0
2009-08-26 Hydra Jet Perforation 3176.50 3176.60 3
2009-08-26 Hydra Jet Perforation 3169.50 3169.60 3
2009-08-27 Fracture 3169.50 3176.60 0
2009-08-27 Hydra Jet Perforation 3059.50 3059.60 3
2009-08-27 Hydra Jet Perforation 3055.50 3055.60 3
2009-08-27 Fracture 3055.50 3059.60 0
2009-08-27 Hydra Jet Perforation 3031.40 3031.50 3
2009-08-27 Fracture 3031.40 3031.50 0
2009-08-19 Fracture 3379.00 3385.00 0
2009-08-27 Hydra Jet Perforation 2990.50 2990.60 3
2009-08-28 Hydra Jet Perforation 2987.50 2987.60 3
2009-08-28 Fracture 2987.50 2990.60 0
2009-08-28 Hydra Jet Perforation 2863.00 2863.10 3
2009-08-28 Hydra Jet Perforation 2857.50 2857.60 3
2009-08-28 Fracture 2857.50 2863.10 0
2009-08-29 Hydra Jet Perforation 2442.50 2442.60 3
2009-08-29 Hydra Jet Perforation 2437.50 2437.60 3
2009-08-29 Hydra Jet Perforation 2433.50 2433.60 3
2009-08-29 Fracture 2433.50 2442.60 0
2009-08-21 Hydra Jet Perforation 3364.50 3364.60 3
2009-08-21 Hydra Jet Perforation 3349.50 3349.60 3
2009-08-22 Fracture 3349.50 3364.60 0
2009-08-23 Hydra Jet Perforation 3330.50 3330.60 3
2009-08-23 Hydra Jet Perforation 3325.50 3325.60 3
2009-08-23 Hydra Jet Perforation 3321.50 3321.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1939 0.0 0.0 0.0
2010 8480 0.0 0.0 0.0
2011 7807 0.0 0.0 0.0
2012 8541 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8640 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7129 0.0 0.0 0.0
2018 4178 0.0 0.0 0.0
2019 8524 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-17 Lost Circulation 112.00 614.00
2009-02-23 Lost Circulation 1031.00 2150.00

For data sources see[6]

References