X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0664223615000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0664223615000
 
| Well ID: 0664223615000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.75980100000003858, -113.19355500000000347 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.759801, -113.193555 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/15-36-066-22W4/0
 
| Location: 00/15-36-066-22W4/0
 +
|-
 +
| Location Alias: 00/15-36-66-22 W4M
 +
|-
 +
| Location Alias 2: 00/15-36-066-22 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 066
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 36
 +
|-
 +
| County/Municipality: [[Athabasca County,_Alberta|Athabasca County]]
 
|-
 
|-
 
| Well Name: RENAISSANCE ATHAE 15-36-66-22
 
| Well Name: RENAISSANCE ATHAE 15-36-66-22
 +
|-
 +
| Operator Name: [[Husky Oil Operations Limited]]
 +
|-
 +
| License Number: 0117164
 
|-
 
|-
 
| License Date: 1985-08-22
 
| License Date: 1985-08-22
 
|-
 
|-
| Final Drilling Date: 1985-09-04
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1985-09-01
 +
|-
 +
| Final Drill Date: 1985-09-04
 +
|-
 +
| Well Total Depth: 637.50 m
 +
|-
 +
| Surface Hole Latitude: 54.759801
 +
|-
 +
| Surface Hole Longitude: -113.193555
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-08-22
 +
| Obtained License
 +
|-
 +
| 1985-09-02
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-09-03
 +
| Well Log Performed
 +
|-
 +
| 1985-09-04
 +
| Finished Drilling
 +
|-
 +
| 1985-09-04
 +
| Lost Circulation Occurred
 +
|-
 +
| 1985-09-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-09-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-09-05
 +
| Rig Released
 +
|-
 +
| 1985-09-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-09-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-09-16
 +
| Plug Back Performed
 +
|-
 +
| 1985-09-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-09-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-09-17
 +
| Plug Back Performed
 +
|-
 +
| 1985-09-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-12-01
 +
| Well Began Production
 +
|-
 +
| 1985-12-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1985-12-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1987-08-27
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1991-07-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-08-29
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1995-08-29
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1995-09-06
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1997-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2018-09-09
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2018-09-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2018-09-09
 +
| Plug Back Performed
 +
|-
 +
| 2018-09-10
 +
| Well Log Performed
 +
|-
 +
| 2018-09-13
 +
| Well Log Performed
 +
|-
 +
| 2018-09-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2018-09-14
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2018-09-14
 +
| Well Log Performed
 +
|-
 +
| 2018-09-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-09-16
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2018-09-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2018-09-17
 +
| Well Log Performed
 +
|-
 +
| 2018-09-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-09-18
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2018-09-18
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2018-09-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2018-09-19
 +
| Well Log Performed
 +
|-
 +
| 2018-09-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-09-20
 +
| Perforation Treatment Performed - Cement Plug
 
|-
 
|-
| Total Depth: 637.5m
+
| 2018-09-20
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Fluid Type: Gas
+
| 2018-09-20
 +
| Plug Back Performed
 
|-
 
|-
| Status: Suspended
+
| 2018-09-20
 +
| Well Fluid changed to Gas
 
|-
 
|-
| Well Type: Not Applicable
+
| 2018-09-20
 +
| Well Mode changed to Abandoned Zone
 
|-
 
|-
| Configuration: Vertical
+
| 2018-10-11
 +
| Well Abandoned
 
|-
 
|-
| Latitude: 54.75980100000003858
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -113.19355500000000347
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1985-09-16
 +
| Perforation
 +
| style="text-align: right;" | 559.50
 +
| style="text-align: right;" | 561.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1997-02-11
 +
| Perforation
 +
| style="text-align: right;" | 500.00
 +
| style="text-align: right;" | 502.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1997-02-11
 +
| Perforation
 +
| style="text-align: right;" | 445.50
 +
| style="text-align: right;" | 447.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2018-09-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 445.20
 +
| style="text-align: right;" | 447.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 437.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-09
 +
| Cement Plug
 +
| style="text-align: right;" | 473.40
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 515.50
 +
| style="text-align: right;" | 518.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 500.00
 +
| style="text-align: right;" | 502.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-14
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 435.50
 +
| style="text-align: right;" | 438.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-14
 +
| Perforation
 +
| style="text-align: right;" | 435.50
 +
| style="text-align: right;" | 438.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2018-09-14
 +
| Perforation
 +
| style="text-align: right;" | 435.50
 +
| style="text-align: right;" | 438.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1985-09-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 547.00
 +
| style="text-align: right;" | 555.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 421.30
 +
| style="text-align: right;" | 430.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-16
 +
| Cement Plug
 +
| style="text-align: right;" | 430.30
 +
| style="text-align: right;" | 449.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-17
 +
| Perforation
 +
| style="text-align: right;" | 390.00
 +
| style="text-align: right;" | 393.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2018-09-17
 +
| Perforation
 +
| style="text-align: right;" | 390.00
 +
| style="text-align: right;" | 393.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2018-09-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 376.30
 +
| style="text-align: right;" | 385.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-18
 +
| Cement Plug
 +
| style="text-align: right;" | 385.50
 +
| style="text-align: right;" | 393.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-18
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 390.00
 +
| style="text-align: right;" | 393.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-19
 +
| Perforation
 +
| style="text-align: right;" | 183.00
 +
| style="text-align: right;" | 186.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2018-09-19
 +
| Perforation
 +
| style="text-align: right;" | 183.00
 +
| style="text-align: right;" | 186.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2018-09-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 166.30
 +
| style="text-align: right;" | 175.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-09-16
 +
| Perforation
 +
| style="text-align: right;" | 531.50
 +
| style="text-align: right;" | 533.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2018-09-20
 +
| Cement Plug
 +
| style="text-align: right;" | 175.30
 +
| style="text-align: right;" | 186.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-09-20
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 183.00
 +
| style="text-align: right;" | 186.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-09-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 530.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-09-17
 +
| Perforation
 +
| style="text-align: right;" | 515.50
 +
| style="text-align: right;" | 518.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1985-09-18
 +
| Perforation
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 437.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1987-08-27
 +
| Fracture
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 437.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-07-11
 +
| Perforation
 +
| style="text-align: right;" | 515.50
 +
| style="text-align: right;" | 518.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1995-09-06
 +
| Fracture
 +
| style="text-align: right;" | 515.50
 +
| style="text-align: right;" | 518.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 773
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 7119
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 5776
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 3628
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 7424
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 8310
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1991
 +
| style="text-align: right;" | 6235
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1992
 +
| style="text-align: right;" | 8550
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1993
 +
| style="text-align: right;" | 8559
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1994
 +
| style="text-align: right;" | 8721
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1995
 +
| style="text-align: right;" | 5288
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1985-09-04
 +
| Lost Circulation
 +
| style="text-align: right;" | 619.00
 +
| style="text-align: right;" | 626.00
 +
|-
 +
| 2018-09-21
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 00:43, 19 January 2021

Well Details

Well ID: 0664223615000
Loading map...
Location: 00/15-36-066-22W4/0
Location Alias: 00/15-36-66-22 W4M
Location Alias 2: 00/15-36-066-22 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 22
Section: 36
County/Municipality: Athabasca County
Well Name: RENAISSANCE ATHAE 15-36-66-22
Operator Name: Husky Oil Operations Limited
License Number: 0117164
License Date: 1985-08-22
License Status: Abandoned
Spud Date: 1985-09-01
Final Drill Date: 1985-09-04
Well Total Depth: 637.50 m
Surface Hole Latitude: 54.759801
Surface Hole Longitude: -113.193555

For data sources see[1][2]

Well History

Date Event
1985-08-22 Obtained License
1985-09-02 Surface Casing Operation Performed
1985-09-03 Well Log Performed
1985-09-04 Finished Drilling
1985-09-04 Lost Circulation Occurred
1985-09-04 Well Mode changed to Drilled and Cased
1985-09-05 Production Casing Operation Performed
1985-09-05 Rig Released
1985-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-16 Perforation Treatment Performed - Jet Perforation
1985-09-16 Plug Back Performed
1985-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-17 Perforation Treatment Performed - Jet Perforation
1985-09-17 Plug Back Performed
1985-09-18 Perforation Treatment Performed - Jet Perforation
1985-12-01 Well Began Production
1985-12-01 Well Fluid changed to Gas
1985-12-01 Well Mode changed to Flowing
1987-08-27 Perforation Treatment Performed - Fractured
1991-07-11 Perforation Treatment Performed - Jet Perforation
1995-08-29 Well Fluid changed to Gas
1995-08-29 Well Mode changed to Suspended
1995-09-06 Perforation Treatment Performed - Fractured
1997-02-11 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Cement Plug
2018-09-09 Perforation Treatment Performed - Cement Squeeze
2018-09-09 Plug Back Performed
2018-09-10 Well Log Performed
2018-09-13 Well Log Performed
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Perforation Treatment Performed - Remedial Casing
2018-09-14 Well Log Performed
2018-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-16 Perforation Treatment Performed - Cement Plug
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Well Log Performed
2018-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-18 Perforation Treatment Performed - Cement Plug
2018-09-18 Perforation Treatment Performed - Remedial Casing
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Well Log Performed
2018-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-20 Perforation Treatment Performed - Cement Plug
2018-09-20 Perforation Treatment Performed - Remedial Casing
2018-09-20 Plug Back Performed
2018-09-20 Well Fluid changed to Gas
2018-09-20 Well Mode changed to Abandoned Zone
2018-10-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-16 Perforation 559.50 561.00 13
1997-02-11 Perforation 500.00 502.00 13
1997-02-11 Perforation 445.50 447.00 13
2018-09-09 Cement Squeeze 445.20 447.00 0
2018-09-09 Cement Squeeze 436.00 437.50 0
2018-09-09 Cement Plug 473.40 525.00 0
2018-09-09 Cement Squeeze 515.50 518.00 0
2018-09-09 Cement Squeeze 500.00 502.00 0
2018-09-14 Remedial Casing Cementing 435.50 438.50 0
2018-09-14 Perforation 435.50 438.50 17
2018-09-14 Perforation 435.50 438.50 20
1985-09-16 Packing Device Capped w/Cement 547.00 555.00 0
2018-09-16 Packing Device Capped w/Cement 421.30 430.30 0
2018-09-16 Cement Plug 430.30 449.30 0
2018-09-17 Perforation 390.00 393.00 17
2018-09-17 Perforation 390.00 393.00 20
2018-09-18 Packing Device Capped w/Cement 376.30 385.30 0
2018-09-18 Cement Plug 385.50 393.00 0
2018-09-18 Remedial Casing Cementing 390.00 393.00 0
2018-09-19 Perforation 183.00 186.00 17
2018-09-19 Perforation 183.00 186.00 20
2018-09-20 Packing Device Capped w/Cement 166.30 175.30 0
1985-09-16 Perforation 531.50 533.50 13
2018-09-20 Cement Plug 175.30 186.00 0
2018-09-20 Remedial Casing Cementing 183.00 186.00 0
1985-09-17 Packing Device Capped w/Cement 525.00 530.00 0
1985-09-17 Perforation 515.50 518.00 13
1985-09-18 Perforation 436.00 437.50 13
1987-08-27 Fracture 436.00 437.50 0
1991-07-11 Perforation 515.50 518.00 13
1995-09-06 Fracture 515.50 518.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 773 0.0 0.0 0.0
1986 7119 0.0 0.0 0.0
1987 5776 0.0 0.0 0.0
1988 3628 0.0 0.0 0.0
1989 7424 0.0 0.0 0.0
1990 8310 0.0 0.0 0.0
1991 6235 0.0 0.0 0.0
1992 8550 0.0 0.0 0.0
1993 8559 0.0 0.0 0.0
1994 8721 0.0 0.0 0.0
1995 5288 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-09-04 Lost Circulation 619.00 626.00
2018-09-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References