If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 221: | Line 221: | ||
| style="text-align: right;" | 1636.80 | | style="text-align: right;" | 1636.80 | ||
| style="text-align: right;" | 1655.40 | | style="text-align: right;" | 1655.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018-03-29 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1573.00 | ||
+ | | style="text-align: right;" | 1580.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018-04-04 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1573.00 | ||
+ | | style="text-align: right;" | 1577.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018-04-04 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 400.00 | ||
+ | | style="text-align: right;" | 401.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2018-04-05 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 400.00 | ||
+ | | style="text-align: right;" | 401.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018-04-05 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 382.00 | ||
+ | | style="text-align: right;" | 395.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 269: | Line 299: | ||
| style="text-align: right;" | 1586.00 | | style="text-align: right;" | 1586.00 | ||
| style="text-align: right;" | 1597.00 | | style="text-align: right;" | 1597.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 511: | Line 511: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0494263206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.270412,"lon":-113.771712,"icon":""}]} |
Location: 00/06-32-049-26W4/0 | |
Location Alias: 00/06-32-49-26 W4M | |
Location Alias 2: 00/06-32-049-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 6-32-49-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0004024 | |
License Date: 1951-12-29 | |
License Status: Abandoned | |
Spud Date: 1952-02-24 | |
Final Drill Date: 1952-03-16 | |
Well Total Depth: 1655.40 m | |
Surface Hole Latitude: 53.270412 | |
Surface Hole Longitude: -113.771712 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-12-29 | Obtained License |
1952-03-03 | Drill Stem Test Performed |
1952-03-11 | Drill Stem Test Performed |
1952-03-13 | Production Casing Operation Performed |
1952-03-16 | Finished Drilling |
1952-03-16 | Perforation Treatment Performed - Open-Hole Completion |
1952-03-16 | Well Mode changed to Drilled and Cased |
1952-05-19 | Well Began Production |
1952-05-19 | Well Fluid changed to Crude Oil |
1952-05-19 | Well Mode changed to Flowing |
1960-08-30 | Well Fluid changed to Crude Oil |
1960-08-30 | Well Mode changed to Pumping |
1967-12-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1983-06-15 | Well Fluid changed to Crude Oil |
1983-06-15 | Well Mode changed to Suspended |
1987-11-02 | Perforation Treatment Performed - Cement Squeeze |
1987-11-02 | Well Log Performed |
1987-11-05 | Perforation Treatment Performed - Jet Perforation |
1987-11-05 | Well Log Performed |
1987-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-11 | Well Log Performed |
1987-11-12 | Perforation Treatment Performed - Cement Squeeze |
1987-11-12 | Plug Back Performed |
1987-11-12 | Well Fluid changed to Crude Oil |
1987-11-12 | Well Mode changed to Abandoned Zone |
1987-11-16 | Perforation Treatment Performed - Jet Perforation |
1987-11-16 | Well Log Performed |
1987-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-03-29 | Plug Back Performed |
2018-03-29 | Well Log Performed |
2018-04-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-04 | Perforation Treatment Performed - Jet Perforation |
2018-04-04 | Plug Back Performed |
2018-04-04 | Well Log Performed |
2018-04-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-04-05 | Perforation Treatment Performed - Cement Squeeze |
2018-04-05 | Plug Back Performed |
2020-03-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-03-16 | Open Hole/Barefoot Completion | 1636.80 | 1655.40 | 0 |
2018-03-29 | Packing Device Capped w/Cement | 1573.00 | 1580.00 | 0 |
2018-04-04 | Packing Device Capped w/Cement | 1573.00 | 1577.00 | 0 |
2018-04-04 | Perforation | 400.00 | 401.00 | 13 |
2018-04-05 | Cement Squeeze | 400.00 | 401.00 | 0 |
2018-04-05 | Packing Device Capped w/Cement | 382.00 | 395.00 | 0 |
1967-12-15 | Hydra Jet Perforation | 1651.40 | 1651.40 | 0 |
1987-11-02 | Cement Squeeze | 1636.80 | 1655.40 | 0 |
1987-11-05 | Perforation | 1646.00 | 1646.40 | 13 |
1987-11-06 | Acid Treatment | 1646.00 | 1646.40 | 0 |
1987-11-10 | Acid Treatment | 1646.00 | 1646.40 | 0 |
1987-11-12 | Cement Squeeze | 1646.00 | 1646.40 | 0 |
1987-11-16 | Perforation | 1586.00 | 1597.00 | 13 |
1987-11-17 | Acid Treatment | 1586.00 | 1597.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6826 | 0.0 | 0.0 | 0.0 |
1968 | 7133 | 0.0 | 0.0 | 0.0 |
1969 | 4128 | 0.0 | 0.0 | 0.0 |
1970 | 7996 | 0.0 | 0.0 | 0.0 |
1971 | 8519 | 0.0 | 0.0 | 0.0 |
1972 | 8304 | 0.0 | 0.0 | 0.0 |
1973 | 7273 | 0.0 | 0.0 | 0.0 |
1974 | 8252 | 0.0 | 0.0 | 0.0 |
1975 | 7100 | 0.0 | 0.0 | 0.0 |
1976 | 8591 | 0.0 | 0.0 | 0.0 |
1977 | 7959 | 0.0 | 0.0 | 0.0 |
1978 | 1932 | 0.0 | 0.0 | 0.0 |
1979 | 8032 | 0.0 | 0.0 | 0.0 |
1980 | 6995 | 0.0 | 0.0 | 0.0 |
1981 | 5336 | 0.0 | 0.0 | 0.0 |
1982 | 2040 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]