X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154200208000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154200208000
 
| Well ID: 0154200208000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.22960900000003903, -112.64386399999995092 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.229609, -112.643864 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-02-015-20W4/0
 
| Location: 00/08-02-015-20W4/0
 +
|-
 +
| Location Alias: 00/08-02-15-20 W4M
 +
|-
 +
| Location Alias 2: 00/08-02-015-20 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 02
 +
|-
 +
| County/Municipality: [[Vulcan County,_Alberta|Vulcan County]]
 
|-
 
|-
 
| Well Name: AMOCO LITTLE BOW 8-2-15-20
 
| Well Name: AMOCO LITTLE BOW 8-2-15-20
 +
|-
 +
| Operator Name: [[ConocoPhillips Canada Resources Corp.]]
 +
|-
 +
| License Number: 0087873
 
|-
 
|-
 
| License Date: 1980-12-29
 
| License Date: 1980-12-29
 
|-
 
|-
| Final Drilling Date: 1981-03-09
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1981-03-01
 +
|-
 +
| Final Drill Date: 1981-03-09
 +
|-
 +
| Well Total Depth: 1305.00 m
 +
|-
 +
| Surface Hole Latitude: 50.229609
 +
|-
 +
| Surface Hole Longitude: -112.643864
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-12-29
 +
| Obtained License
 +
|-
 +
| 1981-03-09
 +
| Finished Drilling
 +
|-
 +
| 1981-03-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-03-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-03-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-03-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-03-13
 +
| Production Casing Operation Performed
 +
|-
 +
| 1981-04-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1981-06-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-03-06
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1983-05-13
 +
| Well Began Production
 +
|-
 +
| 1983-05-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1983-05-13
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1983-11-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1983-11-15
 +
| Well Mode changed to Suspended
 
|-
 
|-
| Total Depth: 1305.0m
+
| 1996-08-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1996-08-07
 +
| Plug Back Performed
 
|-
 
|-
| Status: Abandoned
+
| 1996-08-10
 +
| Well Abandoned
 
|-
 
|-
| Well Type: Not Applicable
+
| 1996-08-10
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Configuration: Vertical
+
| 1996-08-10
 +
| Well Mode changed to Abandoned
 
|-
 
|-
| Latitude: 50.22960900000003903
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -112.64386399999995092
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1981-06-03
 +
| Perforation
 +
| style="text-align: right;" | 1215.00
 +
| style="text-align: right;" | 1218.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-06-03
 +
| Perforation
 +
| style="text-align: right;" | 1222.00
 +
| style="text-align: right;" | 1225.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1981-06-03
 +
| Perforation
 +
| style="text-align: right;" | 1227.00
 +
| style="text-align: right;" | 1229.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1982-03-06
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 1215.00
 +
| style="text-align: right;" | 1229.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-08-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1198.50
 +
| style="text-align: right;" | 1206.50
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1983
 +
| style="text-align: right;" | 2632
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 10:05, 19 January 2021

Well Details

Well ID: 0154200208000
Loading map...
Location: 00/08-02-015-20W4/0
Location Alias: 00/08-02-15-20 W4M
Location Alias 2: 00/08-02-015-20 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 20
Section: 02
County/Municipality: Vulcan County
Well Name: AMOCO LITTLE BOW 8-2-15-20
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0087873
License Date: 1980-12-29
License Status: RecCertified
Spud Date: 1981-03-01
Final Drill Date: 1981-03-09
Well Total Depth: 1305.00 m
Surface Hole Latitude: 50.229609
Surface Hole Longitude: -112.643864

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-29 Obtained License
1981-03-09 Finished Drilling
1981-03-10 Drill Stem Test Performed
1981-03-11 Drill Stem Test Performed
1981-03-12 Drill Stem Test Performed
1981-03-13 Drill Stem Test Performed
1981-03-13 Production Casing Operation Performed
1981-04-29 Well Mode changed to Drilled and Cased
1981-06-03 Perforation Treatment Performed - Jet Perforation
1982-03-06 Perforation Treatment Performed - Condensate Squeeze
1983-05-13 Well Began Production
1983-05-13 Well Fluid changed to Crude Oil
1983-05-13 Well Mode changed to Pumping
1983-11-15 Well Fluid changed to Crude Oil
1983-11-15 Well Mode changed to Suspended
1996-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-07 Plug Back Performed
1996-08-10 Well Abandoned
1996-08-10 Well Fluid changed to Crude Oil
1996-08-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-03 Perforation 1215.00 1218.00 7
1981-06-03 Perforation 1222.00 1225.00 7
1981-06-03 Perforation 1227.00 1229.00 7
1982-03-06 Condensate Squeeze 1215.00 1229.00 0
1996-08-07 Packing Device Capped w/Cement 1198.50 1206.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2632 0.0 0.0 0.0

For data sources see[5]

References