X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154201508002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154201508002
 
| Well ID: 0154201508002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.257297, -112.6651102 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.258765, -112.663088 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/08-15-015-20W4/2
 +
|-
 +
| Location Alias: 00/08-15-15-20 W4M
 +
|-
 +
| Location Alias 2: 00/08-15-015-20 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Vulcan County,_Alberta|Vulcan County]]
 
|-
 
|-
 
| Well Name: AMOCO LITTLE BOW 8-15-15-20
 
| Well Name: AMOCO LITTLE BOW 8-15-15-20
 
|-
 
|-
| Operator:
+
| Operator Name: [[ConocoPhillips Canada Resources Corp.]]
 +
|-
 +
| License Number: 0124893
 
|-
 
|-
 
| License Date: 1986-12-09
 
| License Date: 1986-12-09
 
|-
 
|-
| Final Drilling Date: 1987-01-01
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1986-12-27
 +
|-
 +
| Final Drill Date: 1987-01-01
 +
|-
 +
| Well Total Depth: 1273.00 m
 +
|-
 +
| Surface Hole Latitude: 50.258765
 +
|-
 +
| Surface Hole Longitude: -112.663088
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1986-12-09
 +
| Obtained License
 +
|-
 +
| 1986-12-28
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1987-01-01
 +
| Finished Drilling
 +
|-
 +
| 1987-01-01
 +
| Well Log Performed
 +
|-
 +
| 1987-01-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1987-01-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1987-01-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1987-01-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 1987-01-04
 +
| Rig Released
 +
|-
 +
| 1987-02-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-02-26
 +
| Well Log Performed
 +
|-
 +
| 1989-09-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1989-09-19
 +
| Plug Back Performed
 
|-
 
|-
| Total Depth: 1273.0m
+
| 1989-09-20
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Fluid Type: Gas
+
| 1989-10-01
 +
| Well Began Production
 
|-
 
|-
| Status: Abandoned
+
| 1989-10-01
 +
| Well Fluid changed to Gas
 
|-
 
|-
| Well Type: Not Applicable
+
| 1989-10-01
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Configuration: Vertical
+
| 1996-01-31
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Violations:
+
| 1996-01-31
 +
| Plug Back Performed
 
|-
 
|-
| Latitude: 50.257297
+
| 1996-01-31
 +
| Well Abandoned
 
|-
 
|-
| Longitude: -112.6651102
+
| 1996-01-31
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1996-01-31
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1987-02-26
 +
| Perforation
 +
| style="text-align: right;" | 1211.90
 +
| style="text-align: right;" | 1213.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1987-02-26
 +
| Perforation
 +
| style="text-align: right;" | 1219.40
 +
| style="text-align: right;" | 1220.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1987-02-26
 +
| Perforation
 +
| style="text-align: right;" | 1221.90
 +
| style="text-align: right;" | 1222.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1989-09-19
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1192.00
 +
| style="text-align: right;" | 1200.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1989-09-20
 +
| Perforation
 +
| style="text-align: right;" | 1027.00
 +
| style="text-align: right;" | 1028.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-01-31
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1009.50
 +
| style="text-align: right;" | 1017.50
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 429
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1994
 +
| style="text-align: right;" | 2773
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 10:06, 19 January 2021

Well Details

Well ID: 0154201508002
Loading map...
Location: 00/08-15-015-20W4/2
Location Alias: 00/08-15-15-20 W4M
Location Alias 2: 00/08-15-015-20 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 20
Section: 15
County/Municipality: Vulcan County
Well Name: AMOCO LITTLE BOW 8-15-15-20
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0124893
License Date: 1986-12-09
License Status: RecCertified
Spud Date: 1986-12-27
Final Drill Date: 1987-01-01
Well Total Depth: 1273.00 m
Surface Hole Latitude: 50.258765
Surface Hole Longitude: -112.663088

For data sources see[1][2]

Well History

Date Event
1986-12-09 Obtained License
1986-12-28 Surface Casing Operation Performed
1987-01-01 Finished Drilling
1987-01-01 Well Log Performed
1987-01-01 Well Mode changed to Drilled and Cased
1987-01-02 Drill Stem Test Performed
1987-01-03 Drill Stem Test Performed
1987-01-04 Production Casing Operation Performed
1987-01-04 Rig Released
1987-02-26 Perforation Treatment Performed - Jet Perforation
1987-02-26 Well Log Performed
1989-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-19 Plug Back Performed
1989-09-20 Perforation Treatment Performed - Jet Perforation
1989-10-01 Well Began Production
1989-10-01 Well Fluid changed to Gas
1989-10-01 Well Mode changed to Flowing
1996-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-31 Plug Back Performed
1996-01-31 Well Abandoned
1996-01-31 Well Fluid changed to Gas
1996-01-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-02-26 Perforation 1211.90 1213.40 13
1987-02-26 Perforation 1219.40 1220.90 13
1987-02-26 Perforation 1221.90 1222.90 13
1989-09-19 Packing Device Capped w/Cement 1192.00 1200.00 0
1989-09-20 Perforation 1027.00 1028.00 13
1996-01-31 Packing Device Capped w/Cement 1009.50 1017.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 429 0.0 0.0 0.0
1994 2773 0.0 0.0 0.0

For data sources see[5]

References