X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0684233509023"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0684233509023
 
| Well ID: 0684233509023
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.9311281, -113.3901869 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.930594, -113.391685 | width=100% | height=100% }}
 +
|-
 +
| Location: 02/09-35-068-23W4/3
 +
|-
 +
| Location Alias: 02/09-35-68-23 W4M
 +
|-
 +
| Location Alias 2: 02/09-35-068-23 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 068
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 35
 +
|-
 +
| County/Municipality: [[Athabasca County,_Alberta|Athabasca County]]
 
|-
 
|-
 
| Well Name: RENAISSANCE 102 BAPTISTE 9-35-68-23
 
| Well Name: RENAISSANCE 102 BAPTISTE 9-35-68-23
 
|-
 
|-
| Operator:
+
| Operator Name: [[Husky Oil Operations Limited]]
 +
|-
 +
| License Number: 0235046
 
|-
 
|-
 
| License Date: 2000-03-11
 
| License Date: 2000-03-11
 
|-
 
|-
| Final Drilling Date: 2000-03-16
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 2000-03-15
 +
|-
 +
| Final Drill Date: 2000-03-16
 +
|-
 +
| Well Total Depth: 596.00 m
 +
|-
 +
| Surface Hole Latitude: 54.930594
 +
|-
 +
| Surface Hole Longitude: -113.391685
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2000-03-11
 +
| Obtained License
 +
|-
 +
| 2000-03-15
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2000-03-16
 +
| Finished Drilling
 +
|-
 +
| 2000-03-16
 +
| Lost Circulation Occurred
 +
|-
 +
| 2000-03-16
 +
| Well Log Performed
 +
|-
 +
| 2000-03-16
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2000-03-17
 +
| Production Casing Operation Performed
 +
|-
 +
| 2000-03-17
 +
| Rig Released
 +
|-
 +
| 2000-03-21
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2000-03-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-03-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-03-22
 +
| Plug Back Performed
 +
|-
 +
| 2001-01-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-01-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-01-11
 +
| Plug Back Performed
 +
|-
 +
| 2001-01-11
 +
| Well Log Performed
 +
|-
 +
| 2005-09-21
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2005-09-21
 +
| Well Mode changed to Testing
 +
|-
 +
| 2005-09-30
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2005-09-30
 +
| Well Mode changed to Test Completed
 +
|-
 +
| 2011-01-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2011-01-18
 +
| Plug Back Performed
 +
|-
 +
| 2011-01-18
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2011-01-18
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2019-02-13
 +
| Well Abandoned
 +
|-
 +
| 2019-02-13
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2019-02-13
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Total Depth: 596.0m
+
| 2000-03-21
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 569.00
 +
| style="text-align: right;" | 570.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Gas
+
| 2000-03-22
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 534.00
 +
| style="text-align: right;" | 550.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Test Completed
+
| 2000-03-22
 +
| Perforation
 +
| style="text-align: right;" | 426.00
 +
| style="text-align: right;" | 426.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 2001-01-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 422.00
 +
| style="text-align: right;" | 425.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2001-01-11
 +
| Perforation
 +
| style="text-align: right;" | 419.00
 +
| style="text-align: right;" | 419.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 2001-01-11
 +
| Perforation
 +
| style="text-align: right;" | 416.00
 +
| style="text-align: right;" | 416.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 54.9311281
+
| 2001-01-11
 +
| Perforation
 +
| style="text-align: right;" | 414.00
 +
| style="text-align: right;" | 415.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.3901869
+
| 2011-01-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 395.00
 +
| style="text-align: right;" | 403.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2000-03-16
 +
| Lost Circulation
 +
| style="text-align: right;" | 569.00
 +
| style="text-align: right;" | 569.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 10:20, 19 January 2021

Well Details

Well ID: 0684233509023
Loading map...
Location: 02/09-35-068-23W4/3
Location Alias: 02/09-35-68-23 W4M
Location Alias 2: 02/09-35-068-23 W4/03
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 23
Section: 35
County/Municipality: Athabasca County
Well Name: RENAISSANCE 102 BAPTISTE 9-35-68-23
Operator Name: Husky Oil Operations Limited
License Number: 0235046
License Date: 2000-03-11
License Status: Abandoned
Spud Date: 2000-03-15
Final Drill Date: 2000-03-16
Well Total Depth: 596.00 m
Surface Hole Latitude: 54.930594
Surface Hole Longitude: -113.391685

For data sources see[1][2]

Well History

Date Event
2000-03-11 Obtained License
2000-03-15 Surface Casing Operation Performed
2000-03-16 Finished Drilling
2000-03-16 Lost Circulation Occurred
2000-03-16 Well Log Performed
2000-03-16 Well Mode changed to Drilled and Cased
2000-03-17 Production Casing Operation Performed
2000-03-17 Rig Released
2000-03-21 Perforation Treatment Performed - Open-Hole Completion
2000-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-22 Perforation Treatment Performed - Jet Perforation
2000-03-22 Plug Back Performed
2001-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-11 Perforation Treatment Performed - Jet Perforation
2001-01-11 Plug Back Performed
2001-01-11 Well Log Performed
2005-09-21 Well Fluid changed to Gas
2005-09-21 Well Mode changed to Testing
2005-09-30 Well Fluid changed to Gas
2005-09-30 Well Mode changed to Test Completed
2011-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-18 Plug Back Performed
2011-01-18 Well Fluid changed to Gas
2011-01-18 Well Mode changed to Abandoned Zone
2019-02-13 Well Abandoned
2019-02-13 Well Fluid changed to Gas
2019-02-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-21 Open Hole/Barefoot Completion 569.00 570.00 0
2000-03-22 Packing Device Capped w/Cement 534.00 550.00 0
2000-03-22 Perforation 426.00 426.50 13
2001-01-11 Packing Device Capped w/Cement 422.00 425.00 0
2001-01-11 Perforation 419.00 419.50 13
2001-01-11 Perforation 416.00 416.50 13
2001-01-11 Perforation 414.00 415.00 13
2011-01-18 Packing Device Capped w/Cement 395.00 403.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-03-16 Lost Circulation 569.00 569.00

For data sources see[5]

References