X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0585152010000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0585152010000
 
| Well ID: 0585152010000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.0302377, -116.1910602 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.031016, -116.189788 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/10-20-058-15W5/0
 +
|-
 +
| Location Alias: 00/10-20-58-15 W5M
 +
|-
 +
| Location Alias 2: 00/10-20-058-15 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 058
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 15
 +
|-
 +
| Section: 20
 +
|-
 +
| County/Municipality: [[Woodlands County,_Alberta|Woodlands County]]
 
|-
 
|-
 
| Well Name: PCI ET AL WIND 10-20-58-15
 
| Well Name: PCI ET AL WIND 10-20-58-15
 
|-
 
|-
| Operator:
+
| Operator Name: [[Suncor Energy Inc.]]
 +
|-
 +
| License Number: 0061473
 
|-
 
|-
 
| License Date: 1976-12-03
 
| License Date: 1976-12-03
 
|-
 
|-
| Final Drilling Date: 1977-01-26
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1976-12-15
 +
|-
 +
| Final Drill Date: 1977-01-26
 +
|-
 +
| Well Total Depth: 3261.40 m
 +
|-
 +
| Surface Hole Latitude: 54.031016
 +
|-
 +
| Surface Hole Longitude: -116.189788
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1976-12-03
 +
| Obtained License
 +
|-
 +
| 1976-12-15
 +
| Lost Circulation Occurred
 +
|-
 +
| 1976-12-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-01-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-01-26
 +
| Finished Drilling
 +
|-
 +
| 1977-01-26
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1977-01-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1977-02-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1977-02-15
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 1977-02-23
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1977-02-24
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1977-02-25
 +
| Well Began Production
 +
|-
 +
| 1977-02-25
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1977-02-25
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1979-02-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1979-02-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1985-12-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1985-12-01
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Total Depth: 3261.4m
+
| 1987-09-01
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1987-09-01
 +
| Well Mode changed to Suspended
 
|-
 
|-
| Status: Abandoned
+
| 1995-02-16
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Well Type: Not Applicable
+
| 1995-02-16
 +
| Plug Back Performed
 
|-
 
|-
| Configuration: Vertical
+
| 1995-02-16
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Violations:
+
| 1995-02-16
 +
| Well Mode changed to Abandoned
 
|-
 
|-
| Latitude: 54.0302377
+
| 1995-02-17
 +
| Perforation Treatment Performed - Cement Plug
 
|-
 
|-
| Longitude: -116.1910602
+
| 1995-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-02-17
 +
| Well Log Performed
 +
|-
 +
| 1995-02-18
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1995-02-25
 +
| Well Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1977-02-15
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2061.40
 +
| style="text-align: right;" | 2061.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1995-02-18
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-02-15
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2063.50
 +
| style="text-align: right;" | 2063.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-02-15
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2064.40
 +
| style="text-align: right;" | 2064.40
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-02-15
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2065.30
 +
| style="text-align: right;" | 2065.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-02-23
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 2061.40
 +
| style="text-align: right;" | 2065.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-02-24
 +
| Fracture
 +
| style="text-align: right;" | 2061.40
 +
| style="text-align: right;" | 2065.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-02-16
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2061.40
 +
| style="text-align: right;" | 2065.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-02-17
 +
| Cement Plug
 +
| style="text-align: right;" | 1976.00
 +
| style="text-align: right;" | 2080.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-02-17
 +
| Perforation
 +
| style="text-align: right;" | 435.00
 +
| style="text-align: right;" | 436.00
 +
| style="text-align: right;" | 13
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 438
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 321
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 166
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 679
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 1707
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1976-12-15
 +
| Lost Circulation
 +
| style="text-align: right;" | 35.40
 +
| style="text-align: right;" | 40.80
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 10:22, 19 January 2021

Well Details

Well ID: 0585152010000
Loading map...
Location: 00/10-20-058-15W5/0
Location Alias: 00/10-20-58-15 W5M
Location Alias 2: 00/10-20-058-15 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 15
Section: 20
County/Municipality: Woodlands County
Well Name: PCI ET AL WIND 10-20-58-15
Operator Name: Suncor Energy Inc.
License Number: 0061473
License Date: 1976-12-03
License Status: RecCertified
Spud Date: 1976-12-15
Final Drill Date: 1977-01-26
Well Total Depth: 3261.40 m
Surface Hole Latitude: 54.031016
Surface Hole Longitude: -116.189788

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-03 Obtained License
1976-12-15 Lost Circulation Occurred
1976-12-29 Drill Stem Test Performed
1977-01-10 Drill Stem Test Performed
1977-01-26 Finished Drilling
1977-01-26 Well Mode changed to Drilled and Cased
1977-01-30 Drill Stem Test Performed
1977-02-02 Production Casing Operation Performed
1977-02-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-02-23 Perforation Treatment Performed - Condensate Squeeze
1977-02-24 Perforation Treatment Performed - Fractured
1977-02-25 Well Began Production
1977-02-25 Well Fluid changed to Crude Oil
1977-02-25 Well Mode changed to Flowing
1979-02-01 Well Fluid changed to Crude Oil
1979-02-01 Well Mode changed to Suspended
1985-12-01 Well Fluid changed to Crude Oil
1985-12-01 Well Mode changed to Flowing
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Suspended
1995-02-16 Perforation Treatment Performed - Cement Squeeze
1995-02-16 Plug Back Performed
1995-02-16 Well Fluid changed to Crude Oil
1995-02-16 Well Mode changed to Abandoned
1995-02-17 Perforation Treatment Performed - Cement Plug
1995-02-17 Perforation Treatment Performed - Jet Perforation
1995-02-17 Well Log Performed
1995-02-18 Perforation Treatment Performed - Remedial Casing
1995-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-15 Hydra Jet Perforation 2061.40 2061.40 7
1995-02-18 Remedial Casing Cementing 435.00 436.00 0
1977-02-15 Hydra Jet Perforation 2063.50 2063.50 7
1977-02-15 Hydra Jet Perforation 2064.40 2064.40 7
1977-02-15 Hydra Jet Perforation 2065.30 2065.30 7
1977-02-23 Condensate Squeeze 2061.40 2065.30 0
1977-02-24 Fracture 2061.40 2065.30 0
1995-02-16 Cement Squeeze 2061.40 2065.30 0
1995-02-17 Cement Plug 1976.00 2080.00 0
1995-02-17 Perforation 435.00 436.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 438 0.0 0.0 0.0
1978 321 0.0 0.0 0.0
1985 166 0.0 0.0 0.0
1986 679 0.0 0.0 0.0
1987 1707 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-12-15 Lost Circulation 35.40 40.80

For data sources see[6]

References