If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 1096093405000 | | Well ID: 1096093405000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 58.504101, -119.420613 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/05-34-109-09W6/0 | | Location: 00/05-34-109-09W6/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/05-34-109-09 W6/00 | | Location Alias 2: 00/05-34-109-09 W6/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 109 | ||
+ | |- | ||
+ | | Meridian: 6 | ||
+ | |- | ||
+ | | Range: 09 | ||
+ | |- | ||
+ | | Section: 34 | ||
|- | |- | ||
| County/Municipality: [[Rainbow Lake,_Alberta|Rainbow Lake]] | | County/Municipality: [[Rainbow Lake,_Alberta|Rainbow Lake]] | ||
Line 17: | Line 27: | ||
| Well Name: HUSKY PURCELL RAIN 5-34-109-9 | | Well Name: HUSKY PURCELL RAIN 5-34-109-9 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Husky Oil Operations Limited]] |
|- | |- | ||
| License Number: 0350332 | | License Number: 0350332 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 2006-04-22 | | Final Drill Date: 2006-04-22 | ||
|- | |- | ||
− | | Well Total Depth: 1965 m | + | | Well Total Depth: 1965.00 m |
|- | |- | ||
| Surface Hole Latitude: 58.504101 | | Surface Hole Latitude: 58.504101 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2006-01-27 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2006-03-31 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2006-04-04 | ||
+ | | Lost Circulation Occurred | ||
+ | |- | ||
+ | | 2006-04-17 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2006-04-18 | ||
+ | | Lost Circulation Occurred | ||
+ | |- | ||
+ | | 2006-04-19 | ||
+ | | Intermediate Casing Operation Performed | ||
+ | |- | ||
+ | | 2006-04-22 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2006-04-23 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2006-04-23 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2006-04-23 | ||
+ | | Well Mode changed to Abandoned | ||
+ | |- | ||
+ | | 2006-04-25 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2006-09-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2009-01-17 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2010-03-29 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2010-03-29 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-03-29 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2010-03-30 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-03-31 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-04-01 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2010-04-03 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-04-04 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2010-05-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-05-27 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-05-28 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2010-10-01 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2010-10-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-10-02 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-10-03 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2010-10-04 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2010-10-04 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-10-05 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-10-06 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2010-10-06 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2010-10-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2010-10-08 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2010-10-08 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2011-06-14 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2011-07-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2011-07-11 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2011-07-12 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2011-07-12 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2011-07-12 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2011-09-20 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-04-29 }}</ref> |
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 234: | ||
| 2010-03-29 | | 2010-03-29 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1127 | + | | style="text-align: right;" | 1127.00 |
− | | style="text-align: right;" | 1135 | + | | style="text-align: right;" | 1135.00 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-05-19 | | 2010-05-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 971 | + | | style="text-align: right;" | 971.00 |
− | | style="text-align: right;" | 973 | + | | style="text-align: right;" | 973.00 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 2010-05-27 | | 2010-05-27 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 971 | + | | style="text-align: right;" | 971.00 |
− | | style="text-align: right;" | 973 | + | | style="text-align: right;" | 973.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-05-28 | | 2010-05-28 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 971 | + | | style="text-align: right;" | 971.00 |
− | | style="text-align: right;" | 973 | + | | style="text-align: right;" | 973.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-01 | | 2010-10-01 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 956. | + | | style="text-align: right;" | 956.50 |
− | | style="text-align: right;" | 964. | + | | style="text-align: right;" | 964.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-01 | | 2010-10-01 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 745. | + | | style="text-align: right;" | 745.50 |
− | | style="text-align: right;" | 753. | + | | style="text-align: right;" | 753.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-01 | | 2010-10-01 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 542 | + | | style="text-align: right;" | 542.00 |
− | | style="text-align: right;" | 543 | + | | style="text-align: right;" | 543.00 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 2010-10-02 | | 2010-10-02 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 542 | + | | style="text-align: right;" | 542.00 |
− | | style="text-align: right;" | 543 | + | | style="text-align: right;" | 543.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-03 | | 2010-10-03 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 542 | + | | style="text-align: right;" | 542.00 |
− | | style="text-align: right;" | 543 | + | | style="text-align: right;" | 543.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-04 | | 2010-10-04 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 530. | + | | style="text-align: right;" | 530.10 |
− | | style="text-align: right;" | 538. | + | | style="text-align: right;" | 538.10 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-04 | | 2010-10-04 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 516 | + | | style="text-align: right;" | 516.00 |
− | | style="text-align: right;" | 517 | + | | style="text-align: right;" | 517.00 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
+ | |- | ||
+ | | 2010-03-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1113.50 | ||
+ | | style="text-align: right;" | 1114.50 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2010-10-05 | | 2010-10-05 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 516 | + | | style="text-align: right;" | 516.00 |
− | | style="text-align: right;" | 517 | + | | style="text-align: right;" | 517.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-06 | | 2010-10-06 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 516 | + | | style="text-align: right;" | 516.00 |
− | | style="text-align: right;" | 517 | + | | style="text-align: right;" | 517.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-06 | | 2010-10-06 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 470. | + | | style="text-align: right;" | 470.70 |
− | | style="text-align: right;" | 505 | + | | style="text-align: right;" | 505.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-07 | | 2010-10-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 410 | + | | style="text-align: right;" | 410.00 |
− | | style="text-align: right;" | 412 | + | | style="text-align: right;" | 412.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2010-10-08 | | 2010-10-08 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 410 | + | | style="text-align: right;" | 410.00 |
− | | style="text-align: right;" | 412 | + | | style="text-align: right;" | 412.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2010-10-08 | | 2010-10-08 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 410 | + | | style="text-align: right;" | 410.00 |
− | | style="text-align: right;" | 412 | + | | style="text-align: right;" | 412.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2011-07-11 | | 2011-07-11 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 24 | + | | style="text-align: right;" | 24.00 |
− | | style="text-align: right;" | 26 | + | | style="text-align: right;" | 26.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2011-07-12 | | 2011-07-12 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 24 | + | | style="text-align: right;" | 24.00 |
− | | style="text-align: right;" | 26 | + | | style="text-align: right;" | 26.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2011-07-12 | | 2011-07-12 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 9. | + | | style="text-align: right;" | 9.40 |
− | | style="text-align: right;" | 26 | + | | style="text-align: right;" | 26.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-03-30 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1113.50 | ||
+ | | style="text-align: right;" | 1114.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-03-31 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1113.50 | ||
+ | | style="text-align: right;" | 1114.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-04-01 | ||
+ | | Remedial Casing Cementing | ||
+ | | style="text-align: right;" | 1113.50 | ||
+ | | style="text-align: right;" | 1114.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1100.70 | ||
+ | | style="text-align: right;" | 1110.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-04-02 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 761.50 | ||
+ | | style="text-align: right;" | 763.50 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2010-04-03 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 761.50 | ||
+ | | style="text-align: right;" | 763.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2010-04-04 | ||
+ | | Remedial Casing Cementing | ||
+ | | style="text-align: right;" | 761.50 | ||
+ | | style="text-align: right;" | 763.50 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 244: | Line 404: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | !scope="col | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 298: | Line 472: | ||
| title = General Well Data File - Tour-Occurence Data | | title = General Well Data File - Tour-Occurence Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 1096093405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.504101,"lon":-119.420613,"icon":""}]} |
Location: 00/05-34-109-09W6/0 | |
Location Alias: 00/05-34-09-09 W6M | |
Location Alias 2: 00/05-34-109-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 09 | |
Section: 34 | |
County/Municipality: Rainbow Lake | |
Well Name: HUSKY PURCELL RAIN 5-34-109-9 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0350332 | |
License Date: 2006-01-27 | |
License Status: Abandoned | |
Spud Date: 2006-03-29 | |
Final Drill Date: 2006-04-22 | |
Well Total Depth: 1965.00 m | |
Surface Hole Latitude: 58.504101 | |
Surface Hole Longitude: -119.420613 |
Date | Event |
---|---|
2006-01-27 | Obtained License |
2006-03-31 | Surface Casing Operation Performed |
2006-04-04 | Lost Circulation Occurred |
2006-04-17 | Well Log Performed |
2006-04-18 | Lost Circulation Occurred |
2006-04-19 | Intermediate Casing Operation Performed |
2006-04-22 | Finished Drilling |
2006-04-23 | Plug Back Performed |
2006-04-23 | Well Log Performed |
2006-04-23 | Well Mode changed to Abandoned |
2006-04-25 | Rig Released |
2006-09-11 | Well Log Performed |
2009-01-17 | Well Log Performed |
2010-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-29 | Perforation Treatment Performed - Jet Perforation |
2010-03-29 | Well Log Performed |
2010-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-04-01 | Perforation Treatment Performed - Remedial Casing |
2010-04-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-02 | Perforation Treatment Performed - Jet Perforation |
2010-04-02 | Well Log Performed |
2010-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-04-04 | Perforation Treatment Performed - Remedial Casing |
2010-05-19 | Perforation Treatment Performed - Jet Perforation |
2010-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-05-28 | Perforation Treatment Performed - Remedial Casing |
2010-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-01 | Perforation Treatment Performed - Jet Perforation |
2010-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-10-03 | Perforation Treatment Performed - Remedial Casing |
2010-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-04 | Perforation Treatment Performed - Jet Perforation |
2010-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-06 | Perforation Treatment Performed - Remedial Casing |
2010-10-07 | Perforation Treatment Performed - Jet Perforation |
2010-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-10-08 | Perforation Treatment Performed - Remedial Casing |
2011-06-14 | Well Log Performed |
2011-07-09 | Well Log Performed |
2011-07-11 | Perforation Treatment Performed - Jet Perforation |
2011-07-12 | Perforation Treatment Performed - Cement Plug |
2011-07-12 | Perforation Treatment Performed - Remedial Casing |
2011-07-12 | Plug Back Performed |
2011-09-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-29 | Packing Device Capped w/Cement | 1127.00 | 1135.00 | 0 |
2010-05-19 | Perforation | 971.00 | 973.00 | 20 |
2010-05-27 | Acid Treatment | 971.00 | 973.00 | 0 |
2010-05-28 | Remedial Casing Cementing | 971.00 | 973.00 | 0 |
2010-10-01 | Packing Device Capped w/Cement | 956.50 | 964.50 | 0 |
2010-10-01 | Packing Device Capped w/Cement | 745.50 | 753.50 | 0 |
2010-10-01 | Perforation | 542.00 | 543.00 | 20 |
2010-10-02 | Acid Treatment | 542.00 | 543.00 | 0 |
2010-10-03 | Remedial Casing Cementing | 542.00 | 543.00 | 0 |
2010-10-04 | Packing Device Capped w/Cement | 530.10 | 538.10 | 0 |
2010-10-04 | Perforation | 516.00 | 517.00 | 20 |
2010-03-29 | Perforation | 1113.50 | 1114.50 | 17 |
2010-10-05 | Acid Treatment | 516.00 | 517.00 | 0 |
2010-10-06 | Remedial Casing Cementing | 516.00 | 517.00 | 0 |
2010-10-06 | Packing Device Capped w/Cement | 470.70 | 505.00 | 0 |
2010-10-07 | Perforation | 410.00 | 412.00 | 17 |
2010-10-08 | Acid Treatment | 410.00 | 412.00 | 0 |
2010-10-08 | Remedial Casing Cementing | 410.00 | 412.00 | 0 |
2011-07-11 | Perforation | 24.00 | 26.00 | 17 |
2011-07-12 | Remedial Casing Cementing | 24.00 | 26.00 | 0 |
2011-07-12 | Cement Plug | 9.40 | 26.00 | 0 |
2010-03-30 | Acid Treatment | 1113.50 | 1114.50 | 0 |
2010-03-31 | Acid Treatment | 1113.50 | 1114.50 | 0 |
2010-04-01 | Remedial Casing Cementing | 1113.50 | 1114.50 | 0 |
2010-04-02 | Packing Device Capped w/Cement | 1100.70 | 1110.50 | 0 |
2010-04-02 | Perforation | 761.50 | 763.50 | 17 |
2010-04-03 | Acid Treatment | 761.50 | 763.50 | 0 |
2010-04-04 | Remedial Casing Cementing | 761.50 | 763.50 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2006-04-04 | Lost Circulation | 525.00 | 576.00 |
2006-04-18 | Lost Circulation | 1789.00 | 1789.00 |
For data sources see[5]