X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "1116073316000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 1116073316000
 
| Well ID: 1116073316000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 58.680823, -119.094789 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 58.680823, -119.094789 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-33-111-07W6/0
 
| Location: 00/16-33-111-07W6/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-33-111-07 W6/00
 
| Location Alias 2: 00/16-33-111-07 W6/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 111
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 33
 
|-
 
|-
 
| County/Municipality: [[Mackenzie County,_Alberta|Mackenzie County]]
 
| County/Municipality: [[Mackenzie County,_Alberta|Mackenzie County]]
Line 17: Line 27:
 
| Well Name: MOBIL HUSKY HZ RAIN 16-33-111-7
 
| Well Name: MOBIL HUSKY HZ RAIN 16-33-111-7
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[ExxonMobil Canada Ltd.]]
 
|-
 
|-
 
| License Number: 0211978
 
| License Number: 0211978
Line 29: Line 39:
 
| Final Drill Date: 1998-02-24
 
| Final Drill Date: 1998-02-24
 
|-
 
|-
| Well Total Depth: 2350 m
+
| Well Total Depth: 2350.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 58.680823
 
| Surface Hole Latitude: 58.680823
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1998-01-14
 +
| Obtained License
 +
|-
 +
| 1998-01-28
 +
| Lost Circulation Occurred
 +
|-
 +
| 1998-01-30
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1998-02-04
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 1998-02-10
 +
| Lost Circulation Occurred
 +
|-
 +
| 1998-02-15
 +
| Lost Circulation Occurred
 +
|-
 +
| 1998-02-16
 +
| Well Log Performed
 +
|-
 +
| 1998-02-17
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 1998-02-22
 +
| Well Log Performed
 +
|-
 +
| 1998-02-24
 +
| Finished Drilling
 +
|-
 +
| 1998-02-24
 +
| Well Log Performed
 +
|-
 +
| 1998-02-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1998-02-25
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1998-02-25
 +
| Rig Released
 +
|-
 +
| 1998-03-20
 +
| Well Began Production
 +
|-
 +
| 1998-03-20
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-03-20
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1998-04-07
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-04-07
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1998-12-10
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-12-10
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1999-01-20
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1999-01-20
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2006-02-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-02-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-02-18
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-02-18
 +
| Plug Back Performed
 +
|-
 +
| 2006-02-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2006-02-18
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2007-02-02
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2007-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-02-21
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-02-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2007-02-22
 +
| Plug Back Performed
 +
|-
 +
| 2007-02-22
 +
| Well Log Performed
 +
|-
 +
| 2007-03-03
 +
| Well Log Performed
 +
|-
 +
| 2007-03-05
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2007-03-06
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-03-07
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2008-01-13
 +
| Well Log Performed
 +
|-
 +
| 2008-01-15
 +
| Well Log Performed
 +
|-
 +
| 2008-01-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-01-16
 +
| Well Log Performed
 +
|-
 +
| 2008-01-17
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-01-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-01-19
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2008-01-21
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2008-01-23
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2008-01-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-01-23
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-01-24
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-16
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2008-02-16
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-02-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-29
 +
| Well Log Performed
 +
|-
 +
| 2012-03-08
 +
| Well Log Performed
 +
|-
 +
| 2012-03-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-03-09
 +
| Well Log Performed
 +
|-
 +
| 2012-03-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-03-13
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2012-03-13
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-03-13
 +
| Plug Back Performed
 +
|-
 +
| 2012-03-15
 +
| Well Log Performed
 +
|-
 +
| 2013-02-24
 +
| Well Abandoned
 +
|-
 +
| 2013-02-24
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2013-02-24
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 286:
 
|-
 
|-
 
| 1998-02-04
 
| 1998-02-04
| style="text-align: right;" | 1210
+
| style="text-align: right;" | 1210.00
 
| Horizontal
 
| Horizontal
 
|-
 
|-
Line 70: Line 293:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 306:
 
| 1998-02-25
 
| 1998-02-25
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2046
+
| style="text-align: right;" | 2046.00
| style="text-align: right;" | 2350
+
| style="text-align: right;" | 2350.00
| style="text-align: right;" | 0
 
|-
 
| 2006-02-16
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1765
 
| style="text-align: right;" | 1965.5
 
| style="text-align: right;" | 0
 
|-
 
| 2006-02-17
 
| Perforation
 
| style="text-align: right;" | 425
 
| style="text-align: right;" | 425.3
 
| style="text-align: right;" | 17
 
|-
 
| 2006-02-18
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 425
 
| style="text-align: right;" | 425.3
 
| style="text-align: right;" | 0
 
|-
 
| 2006-02-18
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 398.7
 
| style="text-align: right;" | 416.7
 
| style="text-align: right;" | 0
 
|-
 
| 2007-02-02
 
| Perforation
 
| style="text-align: right;" | 390
 
| style="text-align: right;" | 392
 
| style="text-align: right;" | 17
 
|-
 
| 2007-02-02
 
| Hydra Jet Perforation
 
| style="text-align: right;" | 390.7
 
| style="text-align: right;" | 391
 
| style="text-align: right;" | 36
 
|-
 
| 2007-02-21
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 390
 
| style="text-align: right;" | 392
 
| style="text-align: right;" | 0
 
|-
 
| 2007-02-22
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 351
 
| style="text-align: right;" | 385.5
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007-03-05
 
| 2007-03-05
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 313
+
| style="text-align: right;" | 313.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2007-03-06
 
| 2007-03-06
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 313
+
| style="text-align: right;" | 313.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007-03-07
 
| 2007-03-07
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 229
+
| style="text-align: right;" | 229.00
| style="text-align: right;" | 313
+
| style="text-align: right;" | 313.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-16
 
| 2008-01-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 620
+
| style="text-align: right;" | 620.00
| style="text-align: right;" | 622
+
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2008-01-17
 
| 2008-01-17
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 620
+
| style="text-align: right;" | 620.00
| style="text-align: right;" | 622
+
| style="text-align: right;" | 622.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-18
 
| 2008-01-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 547
+
| style="text-align: right;" | 547.00
| style="text-align: right;" | 628.1
+
| style="text-align: right;" | 628.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-19
 
| 2008-01-19
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 396
+
| style="text-align: right;" | 396.00
| style="text-align: right;" | 397
+
| style="text-align: right;" | 397.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2008-01-21
 
| 2008-01-21
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 394
+
| style="text-align: right;" | 394.00
| style="text-align: right;" | 395
+
| style="text-align: right;" | 395.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2008-01-23
 
| 2008-01-23
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 394
+
| style="text-align: right;" | 394.00
| style="text-align: right;" | 397
+
| style="text-align: right;" | 397.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-23
 
| 2008-01-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 386
+
| style="text-align: right;" | 386.00
| style="text-align: right;" | 388
+
| style="text-align: right;" | 388.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1765.00
 +
| style="text-align: right;" | 1965.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-01-23
 
| 2008-01-23
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 315
+
| style="text-align: right;" | 315.00
| style="text-align: right;" | 317
+
| style="text-align: right;" | 317.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2008-01-24
 
| 2008-01-24
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 315
+
| style="text-align: right;" | 315.00
| style="text-align: right;" | 317
+
| style="text-align: right;" | 317.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-16
 
| 2008-02-16
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
| style="text-align: right;" | 307
+
| style="text-align: right;" | 307.00
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
|-
 
|-
 
| 2008-02-16
 
| 2008-02-16
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
| style="text-align: right;" | 307
+
| style="text-align: right;" | 307.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008-02-17
 
| 2008-02-17
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 288
+
| style="text-align: right;" | 288.00
| style="text-align: right;" | 301
+
| style="text-align: right;" | 301.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-03-09
 
| 2012-03-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 409
+
| style="text-align: right;" | 409.00
| style="text-align: right;" | 410
+
| style="text-align: right;" | 410.00
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
 
|-
 
|-
 
| 2012-03-09
 
| 2012-03-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 365
+
| style="text-align: right;" | 365.00
| style="text-align: right;" | 366
+
| style="text-align: right;" | 366.00
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
 
|-
 
|-
 
| 2012-03-09
 
| 2012-03-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 344
+
| style="text-align: right;" | 344.00
| style="text-align: right;" | 345
+
| style="text-align: right;" | 345.00
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
 
|-
 
|-
 
| 2012-03-09
 
| 2012-03-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
| style="text-align: right;" | 306
+
| style="text-align: right;" | 306.00
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
 
|-
 
|-
 
| 2012-03-13
 
| 2012-03-13
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 305
+
| style="text-align: right;" | 305.00
| style="text-align: right;" | 410
+
| style="text-align: right;" | 410.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-17
 +
| Perforation
 +
| style="text-align: right;" | 425.00
 +
| style="text-align: right;" | 425.30
 +
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2012-03-13
 
| 2012-03-13
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 317
+
| style="text-align: right;" | 317.00
| style="text-align: right;" | 430
+
| style="text-align: right;" | 430.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-03-13
 
| 2012-03-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 281
+
| style="text-align: right;" | 281.00
| style="text-align: right;" | 296
+
| style="text-align: right;" | 296.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-18
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 425.00
 +
| style="text-align: right;" | 425.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-02-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 398.70
 +
| style="text-align: right;" | 416.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-02-02
 +
| Perforation
 +
| style="text-align: right;" | 390.00
 +
| style="text-align: right;" | 392.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-02-02
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 390.70
 +
| style="text-align: right;" | 391.00
 +
| style="text-align: right;" | 36
 +
|-
 +
| 2007-02-21
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 390.00
 +
| style="text-align: right;" | 392.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-02-22
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 351.00
 +
| style="text-align: right;" | 385.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 271: Line 494:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 304: Line 541:
 
| 1998
 
| 1998
 
| style="text-align: right;" | 415
 
| style="text-align: right;" | 415
| style="text-align: right;" | 69.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 231.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1999
 
| 1999
 
| style="text-align: right;" | 139
 
| style="text-align: right;" | 139
| style="text-align: right;" | 49.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 167.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 318: Line 555:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 347: Line 584:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:38, 19 January 2021

Well Details

Well ID: 1116073316000
Loading map...
Location: 00/16-33-111-07W6/0
Location Alias: 00/16-33-11-07 W6M
Location Alias 2: 00/16-33-111-07 W6/00
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 07
Section: 33
County/Municipality: Mackenzie County
Well Name: MOBIL HUSKY HZ RAIN 16-33-111-7
Operator Name: ExxonMobil Canada Ltd.
License Number: 0211978
License Date: 1998-01-14
License Status: Abandoned
Spud Date: 1998-01-27
Final Drill Date: 1998-02-24
Well Total Depth: 2350.00 m
Surface Hole Latitude: 58.680823
Surface Hole Longitude: -119.094789

For data sources see[1][2]

Well History

Date Event
1998-01-14 Obtained License
1998-01-28 Lost Circulation Occurred
1998-01-30 Surface Casing Operation Performed
1998-02-04 Direction Drilling Operation Performed - Horizontal
1998-02-10 Lost Circulation Occurred
1998-02-15 Lost Circulation Occurred
1998-02-16 Well Log Performed
1998-02-17 Intermediate Casing Operation Performed
1998-02-22 Well Log Performed
1998-02-24 Finished Drilling
1998-02-24 Well Log Performed
1998-02-24 Well Mode changed to Drilled and Cased
1998-02-25 Perforation Treatment Performed - Open-Hole Completion
1998-02-25 Rig Released
1998-03-20 Well Began Production
1998-03-20 Well Fluid changed to Crude Oil
1998-03-20 Well Mode changed to Flowing
1998-04-07 Well Fluid changed to Crude Oil
1998-04-07 Well Mode changed to Suspended
1998-12-10 Well Fluid changed to Crude Oil
1998-12-10 Well Mode changed to Flowing
1999-01-20 Well Fluid changed to Crude Oil
1999-01-20 Well Mode changed to Suspended
2006-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-17 Perforation Treatment Performed - Jet Perforation
2006-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-18 Perforation Treatment Performed - Remedial Casing
2006-02-18 Plug Back Performed
2006-02-18 Well Fluid changed to Crude Oil
2006-02-18 Well Mode changed to Abandoned Zone
2007-02-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-02-02 Perforation Treatment Performed - Jet Perforation
2007-02-21 Perforation Treatment Performed - Remedial Casing
2007-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-22 Plug Back Performed
2007-02-22 Well Log Performed
2007-03-03 Well Log Performed
2007-03-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-03-06 Perforation Treatment Performed - Remedial Casing
2007-03-07 Perforation Treatment Performed - Cement Plug
2008-01-13 Well Log Performed
2008-01-15 Well Log Performed
2008-01-16 Perforation Treatment Performed - Jet Perforation
2008-01-16 Well Log Performed
2008-01-17 Perforation Treatment Performed - Remedial Casing
2008-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-01-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-01-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-23 Perforation Treatment Performed - Remedial Casing
2008-01-24 Perforation Treatment Performed - Remedial Casing
2008-02-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-02-16 Perforation Treatment Performed - Remedial Casing
2008-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-29 Well Log Performed
2012-03-08 Well Log Performed
2012-03-09 Perforation Treatment Performed - Jet Perforation
2012-03-09 Well Log Performed
2012-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-13 Perforation Treatment Performed - Cement Plug
2012-03-13 Perforation Treatment Performed - Remedial Casing
2012-03-13 Plug Back Performed
2012-03-15 Well Log Performed
2013-02-24 Well Abandoned
2013-02-24 Well Fluid changed to Crude Oil
2013-02-24 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-02-04 1210.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-25 Open Hole/Barefoot Completion 2046.00 2350.00 0
2007-03-05 Hydra Jet Perforation 312.00 313.00 1
2007-03-06 Remedial Casing Cementing 312.00 313.00 0
2007-03-07 Cement Plug 229.00 313.00 0
2008-01-16 Perforation 620.00 622.00 17
2008-01-17 Remedial Casing Cementing 620.00 622.00 0
2008-01-18 Packing Device Capped w/Cement 547.00 628.10 0
2008-01-19 Hydra Jet Perforation 396.00 397.00 1
2008-01-21 Hydra Jet Perforation 394.00 395.00 1
2008-01-23 Remedial Casing Cementing 394.00 397.00 0
2008-01-23 Packing Device Capped w/Cement 386.00 388.00 0
2006-02-16 Packing Device Capped w/Cement 1765.00 1965.50 0
2008-01-23 Hydra Jet Perforation 315.00 317.00 1
2008-01-24 Remedial Casing Cementing 315.00 317.00 0
2008-02-16 Hydra Jet Perforation 305.00 307.00 1
2008-02-16 Remedial Casing Cementing 305.00 307.00 0
2008-02-17 Packing Device Capped w/Cement 288.00 301.00 0
2012-03-09 Perforation 409.00 410.00 99
2012-03-09 Perforation 365.00 366.00 99
2012-03-09 Perforation 344.00 345.00 99
2012-03-09 Perforation 305.00 306.00 99
2012-03-13 Remedial Casing Cementing 305.00 410.00 0
2006-02-17 Perforation 425.00 425.30 17
2012-03-13 Cement Plug 317.00 430.00 0
2012-03-13 Packing Device Capped w/Cement 281.00 296.00 0
2006-02-18 Remedial Casing Cementing 425.00 425.30 0
2006-02-18 Packing Device Capped w/Cement 398.70 416.70 0
2007-02-02 Perforation 390.00 392.00 17
2007-02-02 Hydra Jet Perforation 390.70 391.00 36
2007-02-21 Remedial Casing Cementing 390.00 392.00 0
2007-02-22 Packing Device Capped w/Cement 351.00 385.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 415 0.0 0.0 0.0
1999 139 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-01-28 Lost Circulation 186.00 249.00
1998-02-10 Lost Circulation 1762.00 1769.00
1998-02-15 Lost Circulation 2046.00 2046.00

For data sources see[7]

References