If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 296: | Line 296: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0504260604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.28036,"lon":-113.771277,"icon":""}]} |
Location: 02/04-06-050-26W4/0 | |
Location Alias: 02/04-06-50-26 W4M | |
Location Alias 2: 02/04-06-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Leduc County | |
Well Name: NEP 102 HZ LEDUC-WB 4-6-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0473315 | |
License Date: 2014-12-16 | |
License Status: Suspension | |
Spud Date: 2015-09-29 | |
Final Drill Date: 2015-10-09 | |
Well Total Depth: 3527.00 m | |
Surface Hole Latitude: 53.280360 | |
Surface Hole Longitude: -113.771277 |
Date | Event |
---|---|
2014-12-16 | Obtained License |
2015-10-01 | Surface Casing Operation Performed |
2015-10-02 | Direction Drilling Operation Performed - Deviate |
2015-10-05 | Direction Drilling Operation Performed - Horizontal |
2015-10-05 | Intermediate Casing Operation Performed |
2015-10-09 | Finished Drilling |
2015-10-09 | Well Mode changed to Drilled and Cased |
2015-10-10 | Rig Released |
2015-10-10 | Well Log Performed |
2015-10-19 | Well Log Performed |
2015-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-10-21 | Perforation Treatment Performed - Open-Hole Completion |
2015-10-27 | Well Began Production |
2015-10-27 | Well Fluid changed to Crude Oil |
2015-10-27 | Well Mode changed to Pumping |
2016-12-01 | Well Fluid changed to Crude Oil |
2016-12-01 | Well Mode changed to Suspended |
2019-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-05-30 | Plug Back Performed |
2019-05-30 | Well Fluid changed to Crude Oil |
2019-05-30 | Well Log Performed |
2019-05-30 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-29 | Savanna Drilling Corp. | 426 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-10-02 | 1157.70 | Deviate (5 - 79 degrees) |
2015-10-05 | 1797.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-10-21 | Open Hole/Barefoot Completion | 1837.00 | 3527.00 | 0 |
2015-10-21 | Acid Treatment | 1837.00 | 3527.00 | 0 |
2019-05-30 | Packing Device Capped w/Cement | 1740.00 | 1760.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 308 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-10 | No Incident Encountered | 0.00 | 0.00 |
2015-10-22 | No Incident Encountered | 0.00 | 0.00 |
2019-05-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]