X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0696120416002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0696120416002
 
| Well ID: 0696120416002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.950655, -119.7580565 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.949675, -119.757036 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/16-04-069-12W6/2
 +
|-
 +
| Location Alias: 00/16-04-69-12 W6M
 +
|-
 +
| Location Alias 2: 00/16-04-069-12 W6/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 069
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 04
 +
|-
 +
| County/Municipality: [[County of Grande Prairie No. 1,_Alberta|County of Grande Prairie No. 1]]
 
|-
 
|-
 
| Well Name: DAYLIGHT ETAL ELM 16-4-69-12
 
| Well Name: DAYLIGHT ETAL ELM 16-4-69-12
 
|-
 
|-
| Operator:
+
| Operator Name: [[Sinopec Daylight Energy Ltd.]]
 +
|-
 +
| License Number: 0411790
 
|-
 
|-
 
| License Date: 2009-08-12
 
| License Date: 2009-08-12
 
|-
 
|-
| Final Drilling Date: 2009-10-09
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2009-09-13
 +
|-
 +
| Final Drill Date: 2009-10-09
 +
|-
 +
| Well Total Depth: 2920.00 m
 +
|-
 +
| Surface Hole Latitude: 54.949675
 +
|-
 +
| Surface Hole Longitude: -119.757036
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-08-12
 +
| Obtained License
 +
|-
 +
| 2009-09-13
 +
| Lost Circulation Occurred
 +
|-
 +
| 2009-09-16
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2009-09-24
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2009-10-09
 +
| Finished Drilling
 +
|-
 +
| 2009-10-09
 +
| Well Log Performed
 +
|-
 +
| 2009-10-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2009-10-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 2009-10-10
 +
| Rig Released
 +
|-
 +
| 2009-10-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-18
 +
| Well Log Performed
 +
|-
 +
| 2009-10-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-10-20
 +
| Well Log Performed
 +
|-
 +
| 2009-10-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-10-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-27
 +
| Well Log Performed
 +
|-
 +
| 2009-10-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-30
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 2920.0m
+
| 2009-10-31
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2009-11-01
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Status: Not Applicable
+
| 2009-11-02
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-11-02
 +
| Well Log Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2009-11-03
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Violations:
+
| 2009-11-04
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 54.950655
+
| 2009-11-04
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -119.7580565
+
| 2009-11-05
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-11-10
 +
| Well Log Performed
 +
|-
 +
| 2009-11-20
 +
| Well Structure changed to Commingled
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2009-09-24
 +
| style="text-align: right;" | 2160.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2009-10-18
 +
| Perforation
 +
| style="text-align: right;" | 2876.00
 +
| style="text-align: right;" | 2877.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-25
 +
| Fracture
 +
| style="text-align: right;" | 2752.00
 +
| style="text-align: right;" | 2792.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-27
 +
| Perforation
 +
| style="text-align: right;" | 2668.00
 +
| style="text-align: right;" | 2669.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-27
 +
| Perforation
 +
| style="text-align: right;" | 2663.00
 +
| style="text-align: right;" | 2664.00
 +
| style="text-align: right;" | 6
 +
|-
 +
| 2009-10-27
 +
| Perforation
 +
| style="text-align: right;" | 2675.00
 +
| style="text-align: right;" | 2676.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-27
 +
| Perforation
 +
| style="text-align: right;" | 2705.00
 +
| style="text-align: right;" | 2706.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2009-10-27
 +
| Perforation
 +
| style="text-align: right;" | 2683.00
 +
| style="text-align: right;" | 2684.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-28
 +
| Fracture
 +
| style="text-align: right;" | 2663.00
 +
| style="text-align: right;" | 2706.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-30
 +
| Perforation
 +
| style="text-align: right;" | 2579.00
 +
| style="text-align: right;" | 2580.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2009-10-30
 +
| Perforation
 +
| style="text-align: right;" | 2539.00
 +
| style="text-align: right;" | 2540.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2009-10-30
 +
| Perforation
 +
| style="text-align: right;" | 2522.00
 +
| style="text-align: right;" | 2523.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-18
 +
| Perforation
 +
| style="text-align: right;" | 2843.00
 +
| style="text-align: right;" | 2844.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-30
 +
| Perforation
 +
| style="text-align: right;" | 2631.00
 +
| style="text-align: right;" | 2632.00
 +
| style="text-align: right;" | 4
 +
|-
 +
| 2009-10-30
 +
| Perforation
 +
| style="text-align: right;" | 2636.00
 +
| style="text-align: right;" | 2637.00
 +
| style="text-align: right;" | 8
 +
|-
 +
| 2009-11-01
 +
| Fracture
 +
| style="text-align: right;" | 2522.00
 +
| style="text-align: right;" | 2580.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-11-01
 +
| Fracture
 +
| style="text-align: right;" | 2631.00
 +
| style="text-align: right;" | 2637.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-11-02
 +
| Perforation
 +
| style="text-align: right;" | 2301.50
 +
| style="text-align: right;" | 2302.50
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-11-02
 +
| Perforation
 +
| style="text-align: right;" | 2389.00
 +
| style="text-align: right;" | 2390.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-11-03
 +
| Fracture
 +
| style="text-align: right;" | 2301.50
 +
| style="text-align: right;" | 2390.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-11-04
 +
| Perforation
 +
| style="text-align: right;" | 2191.50
 +
| style="text-align: right;" | 2192.50
 +
| style="text-align: right;" | 6
 +
|-
 +
| 2009-11-04
 +
| Perforation
 +
| style="text-align: right;" | 2228.50
 +
| style="text-align: right;" | 2229.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2009-11-04
 +
| Perforation
 +
| style="text-align: right;" | 2274.00
 +
| style="text-align: right;" | 2275.00
 +
| style="text-align: right;" | 9
 +
|-
 +
| 2009-10-18
 +
| Perforation
 +
| style="text-align: right;" | 2885.00
 +
| style="text-align: right;" | 2886.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-11-05
 +
| Fracture
 +
| style="text-align: right;" | 2191.50
 +
| style="text-align: right;" | 2192.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-11-05
 +
| Fracture
 +
| style="text-align: right;" | 2228.50
 +
| style="text-align: right;" | 2275.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-18
 +
| Perforation
 +
| style="text-align: right;" | 2880.00
 +
| style="text-align: right;" | 2881.00
 +
| style="text-align: right;" | 5
 +
|-
 +
| 2009-10-20
 +
| Fracture
 +
| style="text-align: right;" | 2843.00
 +
| style="text-align: right;" | 2886.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-22
 +
| Perforation
 +
| style="text-align: right;" | 2756.00
 +
| style="text-align: right;" | 2757.00
 +
| style="text-align: right;" | 6
 +
|-
 +
| 2009-10-22
 +
| Perforation
 +
| style="text-align: right;" | 2752.00
 +
| style="text-align: right;" | 2753.00
 +
| style="text-align: right;" | 6
 +
|-
 +
| 2009-10-22
 +
| Perforation
 +
| style="text-align: right;" | 2791.00
 +
| style="text-align: right;" | 2792.00
 +
| style="text-align: right;" | 6
 +
|-
 +
| 2009-10-22
 +
| Perforation
 +
| style="text-align: right;" | 2782.00
 +
| style="text-align: right;" | 2783.00
 +
| style="text-align: right;" | 6
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2009-09-13
 +
| Lost Circulation
 +
| style="text-align: right;" | 70.00
 +
| style="text-align: right;" | 590.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 15:48, 19 January 2021

Well Details

Well ID: 0696120416002
Loading map...
Location: 00/16-04-069-12W6/2
Location Alias: 00/16-04-69-12 W6M
Location Alias 2: 00/16-04-069-12 W6/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 12
Section: 04
County/Municipality: County of Grande Prairie No. 1
Well Name: DAYLIGHT ETAL ELM 16-4-69-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0411790
License Date: 2009-08-12
License Status: Issued
Spud Date: 2009-09-13
Final Drill Date: 2009-10-09
Well Total Depth: 2920.00 m
Surface Hole Latitude: 54.949675
Surface Hole Longitude: -119.757036

For data sources see[1][2]

Well History

Date Event
2009-08-12 Obtained License
2009-09-13 Lost Circulation Occurred
2009-09-16 Surface Casing Operation Performed
2009-09-24 Direction Drilling Operation Performed - Deviate
2009-10-09 Finished Drilling
2009-10-09 Well Log Performed
2009-10-09 Well Mode changed to Drilled and Cased
2009-10-10 Production Casing Operation Performed
2009-10-10 Rig Released
2009-10-18 Perforation Treatment Performed - Jet Perforation
2009-10-18 Well Log Performed
2009-10-20 Perforation Treatment Performed - Fractured
2009-10-20 Well Log Performed
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-10-25 Perforation Treatment Performed - Fractured
2009-10-27 Perforation Treatment Performed - Jet Perforation
2009-10-27 Well Log Performed
2009-10-28 Perforation Treatment Performed - Fractured
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-10-30 Well Log Performed
2009-10-31 Well Log Performed
2009-11-01 Perforation Treatment Performed - Fractured
2009-11-02 Perforation Treatment Performed - Jet Perforation
2009-11-02 Well Log Performed
2009-11-03 Perforation Treatment Performed - Fractured
2009-11-04 Perforation Treatment Performed - Jet Perforation
2009-11-04 Well Log Performed
2009-11-05 Perforation Treatment Performed - Fractured
2009-11-10 Well Log Performed
2009-11-20 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-09-24 2160.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-18 Perforation 2876.00 2877.00 5
2009-10-25 Fracture 2752.00 2792.00 0
2009-10-27 Perforation 2668.00 2669.00 5
2009-10-27 Perforation 2663.00 2664.00 6
2009-10-27 Perforation 2675.00 2676.00 5
2009-10-27 Perforation 2705.00 2706.00 7
2009-10-27 Perforation 2683.00 2684.00 5
2009-10-28 Fracture 2663.00 2706.00 0
2009-10-30 Perforation 2579.00 2580.00 7
2009-10-30 Perforation 2539.00 2540.00 7
2009-10-30 Perforation 2522.00 2523.00 5
2009-10-18 Perforation 2843.00 2844.00 5
2009-10-30 Perforation 2631.00 2632.00 4
2009-10-30 Perforation 2636.00 2637.00 8
2009-11-01 Fracture 2522.00 2580.00 0
2009-11-01 Fracture 2631.00 2637.00 0
2009-11-02 Perforation 2301.50 2302.50 5
2009-11-02 Perforation 2389.00 2390.00 5
2009-11-03 Fracture 2301.50 2390.00 0
2009-11-04 Perforation 2191.50 2192.50 6
2009-11-04 Perforation 2228.50 2229.50 7
2009-11-04 Perforation 2274.00 2275.00 9
2009-10-18 Perforation 2885.00 2886.00 5
2009-11-05 Fracture 2191.50 2192.50 0
2009-11-05 Fracture 2228.50 2275.00 0
2009-10-18 Perforation 2880.00 2881.00 5
2009-10-20 Fracture 2843.00 2886.00 0
2009-10-22 Perforation 2756.00 2757.00 6
2009-10-22 Perforation 2752.00 2753.00 6
2009-10-22 Perforation 2791.00 2792.00 6
2009-10-22 Perforation 2782.00 2783.00 6

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-09-13 Lost Circulation 70.00 590.00

For data sources see[6]

References