If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0234133314030 | | Well ID: 0234133314030 | ||
− | | style="height=100%; align=center" rowspan="21" | {{#display_map: 50.992863, -111. | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 50.992863, -111.764430 | width=100% | height=100% }} |
|- | |- | ||
| Location: 03/14-33-023-13W4/0 | | Location: 03/14-33-023-13W4/0 | ||
Line 43: | Line 43: | ||
| Surface Hole Latitude: 50.992863 | | Surface Hole Latitude: 50.992863 | ||
|- | |- | ||
− | | Surface Hole Longitude: -111. | + | | Surface Hole Longitude: -111.764430 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
Line 170: | Line 170: | ||
| style="text-align: right;" | 2542.90 | | style="text-align: right;" | 2542.90 | ||
| style="text-align: right;" | 2543.00 | | style="text-align: right;" | 2543.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 278: | Line 230: | ||
| style="text-align: right;" | 1806.90 | | style="text-align: right;" | 1806.90 | ||
| style="text-align: right;" | 1807.00 | | style="text-align: right;" | 1807.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2501.90 | ||
+ | | style="text-align: right;" | 2502.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 338: | Line 296: | ||
| style="text-align: right;" | 1404.50 | | style="text-align: right;" | 1404.50 | ||
| style="text-align: right;" | 1404.60 | | style="text-align: right;" | 1404.60 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2460.90 | ||
+ | | style="text-align: right;" | 2461.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 386: | Line 350: | ||
| style="text-align: right;" | 1076.80 | | style="text-align: right;" | 1076.80 | ||
| style="text-align: right;" | 1076.90 | | style="text-align: right;" | 1076.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2419.90 | ||
+ | | style="text-align: right;" | 2420.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2379.00 | ||
+ | | style="text-align: right;" | 2379.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2338.00 | ||
+ | | style="text-align: right;" | 2338.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2298.30 | ||
+ | | style="text-align: right;" | 2298.40 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2258.00 | ||
+ | | style="text-align: right;" | 2258.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2217.00 | ||
+ | | style="text-align: right;" | 2217.10 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 669: | Line 669: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
[[Category:FracFocus]] | [[Category:FracFocus]] |
Well ID: 0234133314030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.992863,"lon":-111.76443,"icon":""}]} |
Location: 03/14-33-023-13W4/0 | |
Location Alias: 03/14-33-23-13 W4M | |
Location Alias 2: 03/14-33-023-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 13 | |
Section: 33 | |
County/Municipality: Special Areas No. 2 | |
Well Name: JOURNEY HZ 103 CESS 14-33-23-13 | |
Operator Name: Journey Energy Inc. | |
License Number: 0494064 | |
License Date: 2019-03-29 | |
License Status: Issued | |
Spud Date: 2019-05-15 | |
Final Drill Date: 2019-05-21 | |
Well Total Depth: 2580.00 m | |
Surface Hole Latitude: 50.992863 | |
Surface Hole Longitude: -111.764430 |
Date | Event |
---|---|
2019-03-29 | Obtained License |
2019-05-15 | Drill To LD |
2019-05-16 | Surface Casing Operation Performed |
2019-05-17 | Direction Drilling Operation Performed - Deviate |
2019-05-17 | Direction Drilling Operation Performed - Horizontal |
2019-05-19 | Well Log Performed |
2019-05-20 | Well Log Performed |
2019-05-21 | Finished Drilling |
2019-05-21 | Production Casing Operation Performed |
2019-05-21 | Rig Released |
2019-05-21 | Well Mode changed to Drilled and Cased |
2019-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-06-12 | Well Began Production |
2019-06-12 | Well Fluid changed to Crude Oil |
2019-06-12 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-05-15 | Lasso Drilling Corporation | 2 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-05-17 | 799.40 | Deviate (5 - 79 degrees) |
2019-05-17 | 1067.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-05-28 | Multi-Stage Fracture | 2542.90 | 2543.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 2176.00 | 2176.10 | 0 |
2019-05-29 | Multi-Stage Fracture | 2136.20 | 2136.30 | 0 |
2019-05-29 | Multi-Stage Fracture | 2096.20 | 2096.30 | 0 |
2019-05-29 | Multi-Stage Fracture | 2055.20 | 2055.30 | 0 |
2019-05-29 | Multi-Stage Fracture | 2014.20 | 2014.30 | 0 |
2019-05-29 | Multi-Stage Fracture | 1973.30 | 1973.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 1932.30 | 1932.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 1891.50 | 1891.60 | 0 |
2019-05-29 | Multi-Stage Fracture | 1847.90 | 1848.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 1806.90 | 1807.00 | 0 |
2019-05-28 | Multi-Stage Fracture | 2501.90 | 2502.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 1767.10 | 1767.20 | 0 |
2019-05-29 | Multi-Stage Fracture | 1726.40 | 1726.50 | 0 |
2019-05-29 | Multi-Stage Fracture | 1686.70 | 1686.80 | 0 |
2019-05-29 | Multi-Stage Fracture | 1648.20 | 1648.30 | 0 |
2019-05-29 | Multi-Stage Fracture | 1607.30 | 1607.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 1566.30 | 1566.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 1526.60 | 1526.70 | 0 |
2019-05-29 | Multi-Stage Fracture | 1485.80 | 1485.90 | 0 |
2019-05-29 | Multi-Stage Fracture | 1444.30 | 1444.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 1404.50 | 1404.60 | 0 |
2019-05-28 | Multi-Stage Fracture | 2460.90 | 2461.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 1363.50 | 1363.60 | 0 |
2019-05-29 | Multi-Stage Fracture | 1322.70 | 1322.80 | 0 |
2019-05-29 | Multi-Stage Fracture | 1281.80 | 1281.90 | 0 |
2019-05-29 | Multi-Stage Fracture | 1240.80 | 1240.90 | 0 |
2019-05-29 | Multi-Stage Fracture | 1199.80 | 1199.90 | 0 |
2019-05-29 | Multi-Stage Fracture | 1158.90 | 1159.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 1117.90 | 1118.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 1076.80 | 1076.90 | 0 |
2019-05-28 | Multi-Stage Fracture | 2419.90 | 2420.00 | 0 |
2019-05-29 | Multi-Stage Fracture | 2379.00 | 2379.10 | 0 |
2019-05-29 | Multi-Stage Fracture | 2338.00 | 2338.10 | 0 |
2019-05-29 | Multi-Stage Fracture | 2298.30 | 2298.40 | 0 |
2019-05-29 | Multi-Stage Fracture | 2258.00 | 2258.10 | 0 |
2019-05-29 | Multi-Stage Fracture | 2217.00 | 2217.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-05-28 | 2019-05-29 | 989 | 2,153 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 19.9336 | N/A | |||
Water | 7732-18-5 | 100 | 56.4367 | N/A | ||||
20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 22.5361 | N/A | ||
HCR - Synthetic HCL Acid | Fluid Energy Group Ltd. | Acid | Demulsifiers | Not Available | 100 | 0.5133 | N/A | |
Inhibitors | Not Available | 100 | 0.5132 | N/A | ||||
Non Hazardous Ingredients | Not Available | 100 | 0.5131 | N/A | ||||
Water | 7732-18-5 | 100 | 0.5131 | N/A | ||||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0057 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0057 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0057 | N/A | ||||
SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0558 | N/A | |
Sodium chloride | 7647-14-5 | 100 | 0.0558 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0832 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0832 | N/A | ||||
SBX-2 (Crosslinker) | Step Energy Services | Crosslinker | Proprietary | Trade Secret | 100 | 0.0931 | N/A | |
Water | 7732-18-5 | 100 | 0.0931 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.2866 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.2866 | N/A | ||||
SNE-8 (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Aryl Sulfonic Acid | Not Available | 100 | 0.0556 | N/A | |
Alkyl Sulfate | Not Available | 100 | 0.0556 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0556 | N/A | ||||
Polyalkylhydroxyl Alcohol | Not Available | 100 | 0.0556 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-05-28 | 2019-05-29 | Surface Water - Runoff | 2586 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 3845 | 0.0 | 0.0 | 0.0 |
2020 | 1925 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]