X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0425070506000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0425070506000
 
| Well ID: 0425070506000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.5867376, -114.9762154 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.586866, -114.976031 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/06-05-042-07W5/0
 +
|-
 +
| Location Alias: 00/06-05-42-07 W5M
 +
|-
 +
| Location Alias 2: 00/06-05-042-07 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 042
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 05
 +
|-
 +
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 
|-
 
|-
 
| Well Name: HESS CROWN CG WILLGRW 6-5-42-7
 
| Well Name: HESS CROWN CG WILLGRW 6-5-42-7
 
|-
 
|-
| Operator:
+
| Operator Name: [[Obsidian Energy Ltd.]]
 +
|-
 +
| License Number: 0020076
 
|-
 
|-
 
| License Date: 1960-12-01
 
| License Date: 1960-12-01
 
|-
 
|-
| Final Drilling Date: 1960-12-30
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1960-12-06
 +
|-
 +
| Final Drill Date: 1960-12-30
 +
|-
 +
| Well Total Depth: 2542.00 m
 +
|-
 +
| Surface Hole Latitude: 52.586866
 +
|-
 +
| Surface Hole Longitude: -114.976031
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1960-12-01
 +
| Obtained License
 +
|-
 +
| 1960-12-06
 +
| Lost Circulation Occurred
 +
|-
 +
| 1960-12-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1960-12-30
 +
| Finished Drilling
 +
|-
 +
| 1961-01-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1961-01-12
 +
| Production Casing Operation Performed
 +
|-
 +
| 1961-03-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-03-06
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1961-03-06
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1961-03-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-03-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1961-03-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-04-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1961-04-14
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 1961-04-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-04-16
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1961-04-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1961-04-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1974-03-27
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 2542.0m
+
| 1974-03-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1974-03-28
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Status: Drilling and Cased
+
| 1974-03-30
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 1974-03-31
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 
|-
 
|-
| Configuration: Vertical
+
| 1974-04-03
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Violations:
+
| 1974-04-03
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Latitude: 52.5867376
+
| 1974-04-04
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Longitude: -114.9762154
+
| 2011-11-09
 +
| Well Log Performed
 +
|-
 +
| 2011-11-10
 +
| Well Log Performed
 +
|-
 +
| 2011-11-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-01-14
 +
| Well Log Performed
 +
|-
 +
| 2012-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-06
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2012-02-06
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1961-03-03
 +
| Perforation
 +
| style="text-align: right;" | 2484.70
 +
| style="text-align: right;" | 2487.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1961-04-14
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2473.50
 +
| style="text-align: right;" | 2474.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-14
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2477.70
 +
| style="text-align: right;" | 2479.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-14
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 2484.70
 +
| style="text-align: right;" | 2487.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-15
 +
| Acid Treatment
 +
| style="text-align: right;" | 2473.50
 +
| style="text-align: right;" | 2487.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-16
 +
| Fracture
 +
| style="text-align: right;" | 2473.50
 +
| style="text-align: right;" | 2487.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2473.50
 +
| style="text-align: right;" | 2487.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-03-27
 +
| Perforation
 +
| style="text-align: right;" | 1496.60
 +
| style="text-align: right;" | 1497.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-03-27
 +
| Perforation
 +
| style="text-align: right;" | 1521.60
 +
| style="text-align: right;" | 1522.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-03-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 1496.60
 +
| style="text-align: right;" | 1522.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-03-28
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1496.60
 +
| style="text-align: right;" | 1522.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-03-06
 +
| Acid Wash
 +
| style="text-align: right;" | 2484.70
 +
| style="text-align: right;" | 2487.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-03-30
 +
| Perforation
 +
| style="text-align: right;" | 1507.80
 +
| style="text-align: right;" | 1513.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-03-31
 +
| Acid Treatment
 +
| style="text-align: right;" | 1507.80
 +
| style="text-align: right;" | 1513.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1974-04-03
 +
| Perforation
 +
| style="text-align: right;" | 1507.80
 +
| style="text-align: right;" | 1513.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1974-04-04
 +
| Fracture
 +
| style="text-align: right;" | 1507.80
 +
| style="text-align: right;" | 1513.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-11-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1477.00
 +
| style="text-align: right;" | 1485.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-02
 +
| Perforation
 +
| style="text-align: right;" | 1280.00
 +
| style="text-align: right;" | 1285.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2012-02-06
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1280.00
 +
| style="text-align: right;" | 1285.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-06
 +
| Cement Plug
 +
| style="text-align: right;" | 1110.00
 +
| style="text-align: right;" | 1313.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-03-06
 +
| Fracture
 +
| style="text-align: right;" | 2484.70
 +
| style="text-align: right;" | 2487.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-03-17
 +
| Perforation
 +
| style="text-align: right;" | 2472.50
 +
| style="text-align: right;" | 2474.40
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1961-03-17
 +
| Perforation
 +
| style="text-align: right;" | 2475.90
 +
| style="text-align: right;" | 2478.00
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1961-03-17
 +
| Perforation
 +
| style="text-align: right;" | 2481.70
 +
| style="text-align: right;" | 2483.20
 +
| style="text-align: right;" | 3
 +
|-
 +
| 1961-03-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 2472.50
 +
| style="text-align: right;" | 2483.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-03-17
 +
| Fracture
 +
| style="text-align: right;" | 2472.50
 +
| style="text-align: right;" | 2483.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1961-04-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2472.50
 +
| style="text-align: right;" | 2483.20
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1960-12-06
 +
| Lost Circulation
 +
| style="text-align: right;" | 60.90
 +
| style="text-align: right;" | 60.90
 +
|-
 +
| 2012-02-13
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:45, 19 January 2021

Well Details

Well ID: 0425070506000
Loading map...
Location: 00/06-05-042-07W5/0
Location Alias: 00/06-05-42-07 W5M
Location Alias 2: 00/06-05-042-07 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 05
County/Municipality: Clearwater County
Well Name: HESS CROWN CG WILLGRW 6-5-42-7
Operator Name: Obsidian Energy Ltd.
License Number: 0020076
License Date: 1960-12-01
License Status: Suspension
Spud Date: 1960-12-06
Final Drill Date: 1960-12-30
Well Total Depth: 2542.00 m
Surface Hole Latitude: 52.586866
Surface Hole Longitude: -114.976031

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-12-01 Obtained License
1960-12-06 Lost Circulation Occurred
1960-12-30 Drill Stem Test Performed
1960-12-30 Finished Drilling
1961-01-01 Drill Stem Test Performed
1961-01-12 Production Casing Operation Performed
1961-03-03 Perforation Treatment Performed - Jet Perforation
1961-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-03-06 Perforation Treatment Performed - Fractured
1961-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-17 Perforation Treatment Performed - Fractured
1961-03-17 Perforation Treatment Performed - Jet Perforation
1961-04-12 Perforation Treatment Performed - Cement Squeeze
1961-04-14 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-16 Perforation Treatment Performed - Fractured
1961-04-24 Perforation Treatment Performed - Cement Squeeze
1961-04-24 Well Mode changed to Drilled and Cased
1974-03-27 Perforation Treatment Performed - Jet Perforation
1974-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-28 Perforation Treatment Performed - Cement Squeeze
1974-03-30 Perforation Treatment Performed - Jet Perforation
1974-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-04-03 Perforation Treatment Performed - Jet Perforation
1974-04-03 Well Mode changed to Drilled and Cased
1974-04-04 Perforation Treatment Performed - Fractured
2011-11-09 Well Log Performed
2011-11-10 Well Log Performed
2011-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-14 Well Log Performed
2012-02-02 Perforation Treatment Performed - Jet Perforation
2012-02-06 Perforation Treatment Performed - Cement Plug
2012-02-06 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-03 Perforation 2484.70 2487.80 7
1961-04-14 Hydra Jet Perforation 2473.50 2474.70 0
1961-04-14 Hydra Jet Perforation 2477.70 2479.20 0
1961-04-14 Hydra Jet Perforation 2484.70 2487.20 0
1961-04-15 Acid Treatment 2473.50 2487.20 0
1961-04-16 Fracture 2473.50 2487.20 0
1961-04-24 Cement Squeeze 2473.50 2487.20 0
1974-03-27 Perforation 1496.60 1497.20 7
1974-03-27 Perforation 1521.60 1522.20 7
1974-03-28 Acid Treatment 1496.60 1522.20 0
1974-03-28 Cement Squeeze 1496.60 1522.20 0
1961-03-06 Acid Wash 2484.70 2487.80 0
1974-03-30 Perforation 1507.80 1513.00 7
1974-03-31 Acid Treatment 1507.80 1513.00 0
1974-04-03 Perforation 1507.80 1513.00 7
1974-04-04 Fracture 1507.80 1513.00 0
2011-11-11 Packing Device Capped w/Cement 1477.00 1485.00 0
2012-02-02 Perforation 1280.00 1285.00 13
2012-02-06 Remedial Casing Cementing 1280.00 1285.00 0
2012-02-06 Cement Plug 1110.00 1313.00 0
1961-03-06 Fracture 2484.70 2487.80 0
1961-03-17 Perforation 2472.50 2474.40 3
1961-03-17 Perforation 2475.90 2478.00 3
1961-03-17 Perforation 2481.70 2483.20 3
1961-03-17 Acid Treatment 2472.50 2483.20 0
1961-03-17 Fracture 2472.50 2483.20 0
1961-04-12 Cement Squeeze 2472.50 2483.20 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-12-06 Lost Circulation 60.90 60.90
2012-02-13 No Incident Encountered 0.00 0.00

For data sources see[5]

References