X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0234293606000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0234293606000
 
| Well ID: 0234293606000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.999631, -113.9265836 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.999227, -113.928030 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/06-36-023-29W4/0
 +
|-
 +
| Location Alias: 00/06-36-23-29 W4M
 +
|-
 +
| Location Alias 2: 00/06-36-023-29 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 023
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 29
 +
|-
 +
| Section: 36
 +
|-
 +
| County/Municipality: [[Calgary,_Alberta|Calgary]]
 
|-
 
|-
 
| Well Name: TRI LINK ET AL CROSSFIELD 6-36-23-29
 
| Well Name: TRI LINK ET AL CROSSFIELD 6-36-23-29
 
|-
 
|-
| Operator:
+
| Operator Name: [[Penn West Canadian Fuel Ltd.]]
 +
|-
 +
| License Number: 0075148
 
|-
 
|-
 
| License Date: 1979-04-05
 
| License Date: 1979-04-05
 
|-
 
|-
| Final Drilling Date: 1980-03-22
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1980-02-13
 +
|-
 +
| Final Drill Date: 1980-03-22
 +
|-
 +
| Well Total Depth: 1659.00 m
 +
|-
 +
| Surface Hole Latitude: 50.999227
 +
|-
 +
| Surface Hole Longitude: -113.928030
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-04-05
 +
| Obtained License
 +
|-
 +
| 1980-03-22
 +
| Finished Drilling
 +
|-
 +
| 1980-03-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-03-25
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1980-05-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-05-22
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Total Depth: 1659.0m
+
| 1981-02-01
 +
| Well Began Production
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1981-02-01
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Status: Abandoned
+
| 1981-02-01
 +
| Well Mode changed to Pumping
 
|-
 
|-
| Well Type: Not Applicable
+
| 1981-08-01
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Configuration: Vertical
+
| 1981-08-01
 +
| Well Mode changed to Suspended
 
|-
 
|-
| Violations:
+
| 1984-08-14
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Latitude: 50.999631
+
| 1984-08-14
 +
| Well Mode changed to Pumping
 
|-
 
|-
| Longitude: -113.9265836
+
| 1985-04-15
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1985-04-15
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1991-03-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1991-03-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1991-03-08
 +
| Plug Back Performed
 +
|-
 +
| 1991-03-08
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1991-03-08
 +
| Well Log Performed
 +
|-
 +
| 1991-03-08
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1991-03-09
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1991-05-03
 +
| Well Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1980-05-19
 +
| Perforation
 +
| style="text-align: right;" | 1639.80
 +
| style="text-align: right;" | 1641.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-05-22
 +
| Fracture
 +
| style="text-align: right;" | 1639.80
 +
| style="text-align: right;" | 1641.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-03-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1629.00
 +
| style="text-align: right;" | 1637.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1991-03-08
 +
| Perforation
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 310.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1991-03-09
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 310.50
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1984
 +
| style="text-align: right;" | 158
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1985
 +
| style="text-align: right;" | 853
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 23:48, 19 January 2021

Well Details

Well ID: 0234293606000
Loading map...
Location: 00/06-36-023-29W4/0
Location Alias: 00/06-36-23-29 W4M
Location Alias 2: 00/06-36-023-29 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 29
Section: 36
County/Municipality: Calgary
Well Name: TRI LINK ET AL CROSSFIELD 6-36-23-29
Operator Name: Penn West Canadian Fuel Ltd.
License Number: 0075148
License Date: 1979-04-05
License Status: RecCertified
Spud Date: 1980-02-13
Final Drill Date: 1980-03-22
Well Total Depth: 1659.00 m
Surface Hole Latitude: 50.999227
Surface Hole Longitude: -113.928030

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-05 Obtained License
1980-03-22 Finished Drilling
1980-03-25 Production Casing Operation Performed
1980-03-25 Well Mode changed to Drilled and Cased
1980-05-19 Perforation Treatment Performed - Jet Perforation
1980-05-22 Perforation Treatment Performed - Fractured
1981-02-01 Well Began Production
1981-02-01 Well Fluid changed to Crude Oil
1981-02-01 Well Mode changed to Pumping
1981-08-01 Well Fluid changed to Crude Oil
1981-08-01 Well Mode changed to Suspended
1984-08-14 Well Fluid changed to Crude Oil
1984-08-14 Well Mode changed to Pumping
1985-04-15 Well Fluid changed to Crude Oil
1985-04-15 Well Mode changed to Suspended
1991-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-08 Perforation Treatment Performed - Jet Perforation
1991-03-08 Plug Back Performed
1991-03-08 Well Fluid changed to Crude Oil
1991-03-08 Well Log Performed
1991-03-08 Well Mode changed to Abandoned
1991-03-09 Perforation Treatment Performed - Remedial Casing
1991-05-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-19 Perforation 1639.80 1641.70 7
1980-05-22 Fracture 1639.80 1641.70 0
1991-03-08 Packing Device Capped w/Cement 1629.00 1637.00 0
1991-03-08 Perforation 310.00 310.50 13
1991-03-09 Remedial Casing Cementing 310.00 310.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 158 0.0 0.0 0.0
1985 853 0.0 0.0 0.0

For data sources see[5]

References