If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 226: | Line 226: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0615110513W02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.251721,"lon":-115.623994,"icon":""}]} |
Location: W0/13-05-061-11W5/2 | |
Location Alias: W0/13-05-61-11 W5M | |
Location Alias 2: W0/13-05-061-11 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 11 | |
Section: 05 | |
County/Municipality: Woodlands County | |
Well Name: 1976082 WHCOURT 13-5-61-11 | |
Operator Name: Razor Energy Corp. | |
License Number: 0184162 | |
License Date: 1996-01-05 | |
License Status: Suspension | |
Spud Date: 1996-01-11 | |
Final Drill Date: 1996-01-30 | |
Well Total Depth: 1726.00 m | |
Surface Hole Latitude: 54.251721 | |
Surface Hole Longitude: -115.623994 |
Date | Event |
---|---|
1996-01-05 | Obtained License |
1996-01-13 | Surface Casing Operation Performed |
1996-01-26 | Direction Drilling Operation Performed - Deviate |
1996-01-30 | Finished Drilling |
1996-01-31 | Well Log Performed |
1996-02-01 | Production Casing Operation Performed |
1996-02-02 | Rig Released |
1996-02-02 | Well Mode changed to Drilled and Cased |
1996-02-03 | Well Log Performed |
1996-02-13 | Perforation Treatment Performed - Jet Perforation |
1996-02-29 | Well Log Performed |
1996-03-06 | Perforation Treatment Performed - Fractured |
2011-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-25 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-01-26 | 1356.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-13 | Perforation | 1666.00 | 1674.00 | 13 |
1996-03-06 | Fracture | 1666.00 | 1674.00 | 0 |
2011-01-25 | Packing Device Capped w/Cement | 1652.00 | 1660.00 | 0 |
For data sources see[5]