X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0174181511000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0174181511000
 
| Well ID: 0174181511000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.4356151, -112.4015929 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.435472, -112.401141 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: JOURNEY EYRMOR 11-15-17-18
+
| Location: 00/11-15-017-18W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/11-15-17-18 W4M
 +
|-
 +
| Location Alias 2: 00/11-15-017-18 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 017
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 18
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Vulcan County,_Alberta|Vulcan County]]
 +
|-
 +
| Well Name: HOUSTON EYRMOR 11-15-17-18
 +
|-
 +
| Operator Name: [[Houston Oil & Gas Ltd.]]
 +
|-
 +
| License Number: 0267434
 
|-
 
|-
 
| License Date: 2002-02-08
 
| License Date: 2002-02-08
 
|-
 
|-
| Final Drilling Date: 2002-02-23
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2002-02-19
 +
|-
 +
| Final Drill Date: 2002-02-23
 +
|-
 +
| Well Total Depth: 1204.00 m
 +
|-
 +
| Surface Hole Latitude: 50.435472
 +
|-
 +
| Surface Hole Longitude: -112.401141
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-02-08
 +
| Obtained License
 +
|-
 +
| 2002-02-20
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2002-02-23
 +
| Finished Drilling
 +
|-
 +
| 2002-02-23
 +
| Well Log Performed
 +
|-
 +
| 2002-02-24
 +
| Production Casing Operation Performed
 +
|-
 +
| 2002-02-24
 +
| Rig Released
 +
|-
 +
| 2002-02-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-03-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-06
 +
| Well Log Performed
 +
|-
 +
| 2002-03-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-03-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-14
 +
| Plug Back Performed
 +
|-
 +
| 2002-03-14
 +
| Well Log Performed
 +
|-
 +
| 2002-03-14
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2002-03-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-18
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-03-19
 +
| Well Log Performed
 +
|-
 +
| 2002-03-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-03-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2016-10-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2016-12-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2002-03-06
 +
| Perforation
 +
| style="text-align: right;" | 1167.90
 +
| style="text-align: right;" | 1170.70
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Total Depth: 1204.0m
+
| 2002-03-18
 +
| Fracture
 +
| style="text-align: right;" | 468.70
 +
| style="text-align: right;" | 593.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2002-03-20
 +
| Perforation
 +
| style="text-align: right;" | 453.50
 +
| style="text-align: right;" | 457.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Abandoned Zone
+
| 2002-03-20
 +
| Fracture
 +
| style="text-align: right;" | 453.50
 +
| style="text-align: right;" | 457.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 257.00
 +
| style="text-align: right;" | 258.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 259.30
 +
| style="text-align: right;" | 261.30
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 275.00
 +
| style="text-align: right;" | 277.00
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Latitude: 50.4356151
+
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 282.70
 +
| style="text-align: right;" | 284.70
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Longitude: -112.4015929
+
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 314.00
 +
| style="text-align: right;" | 317.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 323.60
 +
| style="text-align: right;" | 324.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 335.00
 +
| style="text-align: right;" | 336.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1150.00
 +
| style="text-align: right;" | 1160.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 357.60
 +
| style="text-align: right;" | 359.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 369.00
 +
| style="text-align: right;" | 370.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2016-10-14
 +
| Perforation
 +
| style="text-align: right;" | 370.70
 +
| style="text-align: right;" | 372.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 257.00
 +
| style="text-align: right;" | 258.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 259.30
 +
| style="text-align: right;" | 261.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 275.00
 +
| style="text-align: right;" | 277.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 282.70
 +
| style="text-align: right;" | 284.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 314.00
 +
| style="text-align: right;" | 317.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 323.60
 +
| style="text-align: right;" | 324.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 335.00
 +
| style="text-align: right;" | 336.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-03-14
 +
| Perforation
 +
| style="text-align: right;" | 591.50
 +
| style="text-align: right;" | 593.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 357.60
 +
| style="text-align: right;" | 359.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 369.00
 +
| style="text-align: right;" | 370.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016-12-22
 +
| Fracture
 +
| style="text-align: right;" | 370.70
 +
| style="text-align: right;" | 372.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-03-14
 +
| Perforation
 +
| style="text-align: right;" | 576.00
 +
| style="text-align: right;" | 578.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-14
 +
| Perforation
 +
| style="text-align: right;" | 518.00
 +
| style="text-align: right;" | 520.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-14
 +
| Perforation
 +
| style="text-align: right;" | 489.00
 +
| style="text-align: right;" | 491.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-15
 +
| Perforation
 +
| style="text-align: right;" | 482.00
 +
| style="text-align: right;" | 485.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-15
 +
| Perforation
 +
| style="text-align: right;" | 473.00
 +
| style="text-align: right;" | 476.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-15
 +
| Perforation
 +
| style="text-align: right;" | 468.70
 +
| style="text-align: right;" | 470.00
 +
| style="text-align: right;" | 13
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2016-12-22
 +
| 2016-12-22
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 1
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| N2
 +
| 7727-37-9
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Use Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-05-05
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-10 }}</ref>
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2016-10-14
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2016-12-23
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 01:54, 20 January 2021

Well Details

Well ID: 0174181511000
Loading map...
Location: 00/11-15-017-18W4/0
Location Alias: 00/11-15-17-18 W4M
Location Alias 2: 00/11-15-017-18 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 18
Section: 15
County/Municipality: Vulcan County
Well Name: HOUSTON EYRMOR 11-15-17-18
Operator Name: Houston Oil & Gas Ltd.
License Number: 0267434
License Date: 2002-02-08
License Status: Issued
Spud Date: 2002-02-19
Final Drill Date: 2002-02-23
Well Total Depth: 1204.00 m
Surface Hole Latitude: 50.435472
Surface Hole Longitude: -112.401141

For data sources see[1][2]

Well History

Date Event
2002-02-08 Obtained License
2002-02-20 Surface Casing Operation Performed
2002-02-23 Finished Drilling
2002-02-23 Well Log Performed
2002-02-24 Production Casing Operation Performed
2002-02-24 Rig Released
2002-02-24 Well Mode changed to Drilled and Cased
2002-03-06 Perforation Treatment Performed - Jet Perforation
2002-03-06 Well Log Performed
2002-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-14 Perforation Treatment Performed - Jet Perforation
2002-03-14 Plug Back Performed
2002-03-14 Well Log Performed
2002-03-14 Well Mode changed to Abandoned Zone
2002-03-15 Perforation Treatment Performed - Jet Perforation
2002-03-18 Perforation Treatment Performed - Fractured
2002-03-19 Well Log Performed
2002-03-20 Perforation Treatment Performed - Fractured
2002-03-20 Perforation Treatment Performed - Jet Perforation
2016-10-14 Perforation Treatment Performed - Jet Perforation
2016-12-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-06 Perforation 1167.90 1170.70 14
2002-03-18 Fracture 468.70 593.00 0
2002-03-20 Perforation 453.50 457.50 13
2002-03-20 Fracture 453.50 457.50 0
2016-10-14 Perforation 257.00 258.00 13
2016-10-14 Perforation 259.30 261.30 13
2016-10-14 Perforation 275.00 277.00 14
2016-10-14 Perforation 282.70 284.70 14
2016-10-14 Perforation 314.00 317.00 14
2016-10-14 Perforation 323.60 324.60 13
2016-10-14 Perforation 335.00 336.00 13
2002-03-14 Packing Device Capped w/Cement 1150.00 1160.00 0
2016-10-14 Perforation 357.60 359.60 13
2016-10-14 Perforation 369.00 370.00 13
2016-10-14 Perforation 370.70 372.70 13
2016-12-22 Fracture 257.00 258.00 0
2016-12-22 Fracture 259.30 261.30 0
2016-12-22 Fracture 275.00 277.00 0
2016-12-22 Fracture 282.70 284.70 0
2016-12-22 Fracture 314.00 317.00 0
2016-12-22 Fracture 323.60 324.60 0
2016-12-22 Fracture 335.00 336.00 0
2002-03-14 Perforation 591.50 593.00 13
2016-12-22 Fracture 357.60 359.60 0
2016-12-22 Fracture 369.00 370.00 0
2016-12-22 Fracture 370.70 372.70 0
2002-03-14 Perforation 576.00 578.00 13
2002-03-14 Perforation 518.00 520.50 13
2002-03-14 Perforation 489.00 491.00 13
2002-03-15 Perforation 482.00 485.40 13
2002-03-15 Perforation 473.00 476.50 13
2002-03-15 Perforation 468.70 470.00 13

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-22 2016-12-22 0 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 100 N/A

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-14 No Incident Encountered 0.00 0.00
2016-12-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References