X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-26503"

m
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 19:18, 3 July 2014

Well Details

Well ID: 37-129-26503
Loading map...
Operator Name: DORSO LP
First Permit Date: 2006-09-08
Last Permit Date: 2006-09-08
Spud Date: 2006-10-11
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.222458
Longitude: -79.55656

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4711.0 365.0 0.0 0.0 0.0 0.0
2012-0 4357.0 365.0 0.0 0.0 0.0 0.0
2011-0 4699.0 365.0 0.0 0.0 0.0 0.0
2010-0 5798.0 365.0 0.0 0.0 0.0 0.0
2009-0 6454.0 365.0 0.0 0.0 0.0 0.0
2008-0 7330.0 365.0 0.0 0.0 0.0 0.0
2007-0 6523.0 365.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1573530 2006-10-13 No Violations Noted WELL SPUD 10/11/06/PIT OK/E&S OK
1795685 2009-05-06 No Violations Noted Well was in production at the time of the inspection. Brine tank was in sound condition. No accelerated erosion and sedimentation noted on the access road or well site. Operator should continue to monitor the access road and well site for erosion and sedimentation.

Note- The silt fence is still in place on-site. At this time, the site is well vegetated and the silt fence can be removed.

1795723 2009-05-06 No Violations Noted Well seems to be in production at time of inspection. Brine tank is in sound condition. Drilling was completed 10/16/2006. Well site is very well vegetated and is showing no signs of erosion and sedimentation. Site restoration is complete. Recommend that the filter fabric fence be removed. Accompanied Jarrod Shultz for training.

References