X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0264252814023"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0264252814023
 
| Well ID: 0264252814023
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.25581200000004856, -113.43536499999999023 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.255812, -113.435365 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/14-28-026-25W4/3
 
| Location: 02/14-28-026-25W4/3
 
|-
 
|-
| Well Name: ECA GAYFORD 14-28-26-25
+
| Location Alias: 02/14-28-26-25 W4M
 +
|-
 +
| Location Alias 2: 02/14-28-026-25 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 026
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 28
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 +
|-
 +
| Well Name: EMBER 102 ENTICE 14-28-26-25
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0221851
 
|-
 
|-
 
| License Date: 1999-03-01
 
| License Date: 1999-03-01
 
|-
 
|-
| Final Drilling Date: 1999-03-06
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1999-03-05
 +
|-
 +
| Final Drill Date: 1999-03-06
 +
|-
 +
| Well Total Depth: 727.00 m
 +
|-
 +
| Surface Hole Latitude: 51.255812
 +
|-
 +
| Surface Hole Longitude: -113.435365
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1999-03-01
 +
| Obtained License
 +
|-
 +
| 1999-03-05
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1999-03-06
 +
| Finished Drilling
 +
|-
 +
| 1999-03-06
 +
| Production Casing Operation Performed
 +
|-
 +
| 1999-03-06
 +
| Rig Released
 +
|-
 +
| 1999-03-06
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1999-05-25
 +
| Well Log Performed
 +
|-
 +
| 1999-05-28
 +
| Well Log Performed
 +
|-
 +
| 1999-06-12
 +
| Well Log Performed
 +
|-
 +
| 1999-06-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-06-19
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 727.0m
+
| 1999-08-06
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1999-08-06
 +
| Well Log Performed
 
|-
 
|-
| Status: Not Applicable
+
| 2000-03-18
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 2000-03-18
 +
| Well Log Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2000-03-18
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Latitude: 51.25581200000004856
+
| 2000-05-24
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-07-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-07-21
 +
| Well Log Performed
 +
|-
 +
| 2000-07-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2007-11-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2007-11-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-11-06
 +
| Plug Back Performed
 +
|-
 +
| 2007-11-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2007-11-26
 +
| Well Structure changed to Commingled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -113.43536499999999023
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1999-06-19
 +
| Perforation
 +
| style="text-align: right;" | 691.00
 +
| style="text-align: right;" | 693.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-07-25
 +
| Fracture
 +
| style="text-align: right;" | 175.00
 +
| style="text-align: right;" | 184.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-11-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 657.00
 +
| style="text-align: right;" | 665.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 623.30
 +
| style="text-align: right;" | 623.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 622.00
 +
| style="text-align: right;" | 622.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 617.10
 +
| style="text-align: right;" | 618.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 582.50
 +
| style="text-align: right;" | 583.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 581.80
 +
| style="text-align: right;" | 582.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 577.00
 +
| style="text-align: right;" | 577.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 570.00
 +
| style="text-align: right;" | 571.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 563.00
 +
| style="text-align: right;" | 564.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1999-06-19
 +
| Perforation
 +
| style="text-align: right;" | 694.00
 +
| style="text-align: right;" | 696.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 551.20
 +
| style="text-align: right;" | 551.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 547.70
 +
| style="text-align: right;" | 548.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 546.30
 +
| style="text-align: right;" | 546.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 500.50
 +
| style="text-align: right;" | 503.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 483.70
 +
| style="text-align: right;" | 485.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 481.00
 +
| style="text-align: right;" | 481.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 471.20
 +
| style="text-align: right;" | 471.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 457.20
 +
| style="text-align: right;" | 457.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 452.50
 +
| style="text-align: right;" | 453.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 448.80
 +
| style="text-align: right;" | 449.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1999-08-06
 +
| Perforation
 +
| style="text-align: right;" | 681.50
 +
| style="text-align: right;" | 685.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 431.10
 +
| style="text-align: right;" | 431.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 429.40
 +
| style="text-align: right;" | 429.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 427.90
 +
| style="text-align: right;" | 428.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 328.30
 +
| style="text-align: right;" | 328.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-06
 +
| Perforation
 +
| style="text-align: right;" | 324.10
 +
| style="text-align: right;" | 324.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-11-09
 +
| Fracture
 +
| style="text-align: right;" | 324.10
 +
| style="text-align: right;" | 623.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-08-06
 +
| Perforation
 +
| style="text-align: right;" | 687.00
 +
| style="text-align: right;" | 689.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-03-18
 +
| Perforation
 +
| style="text-align: right;" | 530.00
 +
| style="text-align: right;" | 534.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-03-18
 +
| Perforation
 +
| style="text-align: right;" | 671.00
 +
| style="text-align: right;" | 675.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-05-24
 +
| Fracture
 +
| style="text-align: right;" | 530.00
 +
| style="text-align: right;" | 534.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-07-21
 +
| Perforation
 +
| style="text-align: right;" | 181.00
 +
| style="text-align: right;" | 184.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2000-07-21
 +
| Perforation
 +
| style="text-align: right;" | 175.00
 +
| style="text-align: right;" | 179.00
 +
| style="text-align: right;" | 17
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:54, 29 January 2021

Well Details

Well ID: 0264252814023
Loading map...
Location: 02/14-28-026-25W4/3
Location Alias: 02/14-28-26-25 W4M
Location Alias 2: 02/14-28-026-25 W4/03
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 25
Section: 28
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 14-28-26-25
Operator Name: Ember Resources Inc.
License Number: 0221851
License Date: 1999-03-01
License Status: Issued
Spud Date: 1999-03-05
Final Drill Date: 1999-03-06
Well Total Depth: 727.00 m
Surface Hole Latitude: 51.255812
Surface Hole Longitude: -113.435365

For data sources see[1][2]

Well History

Date Event
1999-03-01 Obtained License
1999-03-05 Surface Casing Operation Performed
1999-03-06 Finished Drilling
1999-03-06 Production Casing Operation Performed
1999-03-06 Rig Released
1999-03-06 Well Mode changed to Drilled and Cased
1999-05-25 Well Log Performed
1999-05-28 Well Log Performed
1999-06-12 Well Log Performed
1999-06-19 Perforation Treatment Performed - Jet Perforation
1999-06-19 Well Log Performed
1999-08-06 Perforation Treatment Performed - Jet Perforation
1999-08-06 Well Log Performed
2000-03-18 Perforation Treatment Performed - Jet Perforation
2000-03-18 Well Log Performed
2000-03-18 Well Mode changed to Drilled and Cased
2000-05-24 Perforation Treatment Performed - Fractured
2000-07-21 Perforation Treatment Performed - Jet Perforation
2000-07-21 Well Log Performed
2000-07-25 Perforation Treatment Performed - Fractured
2007-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-06 Perforation Treatment Performed - Jet Perforation
2007-11-06 Plug Back Performed
2007-11-09 Perforation Treatment Performed - Fractured
2007-11-26 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-06-19 Perforation 691.00 693.00 13
2000-07-25 Fracture 175.00 184.00 0
2007-11-06 Packing Device Capped w/Cement 657.00 665.00 0
2007-11-06 Perforation 623.30 623.80 13
2007-11-06 Perforation 622.00 622.50 13
2007-11-06 Perforation 617.10 618.10 13
2007-11-06 Perforation 582.50 583.00 13
2007-11-06 Perforation 581.80 582.30 13
2007-11-06 Perforation 577.00 577.50 13
2007-11-06 Perforation 570.00 571.00 13
2007-11-06 Perforation 563.00 564.00 13
1999-06-19 Perforation 694.00 696.00 13
2007-11-06 Perforation 551.20 551.70 13
2007-11-06 Perforation 547.70 548.20 13
2007-11-06 Perforation 546.30 546.80 13
2007-11-06 Perforation 500.50 503.50 13
2007-11-06 Perforation 483.70 485.70 13
2007-11-06 Perforation 481.00 481.50 13
2007-11-06 Perforation 471.20 471.70 13
2007-11-06 Perforation 457.20 457.70 13
2007-11-06 Perforation 452.50 453.00 13
2007-11-06 Perforation 448.80 449.30 13
1999-08-06 Perforation 681.50 685.50 13
2007-11-06 Perforation 431.10 431.60 13
2007-11-06 Perforation 429.40 429.90 13
2007-11-06 Perforation 427.90 428.40 13
2007-11-06 Perforation 328.30 328.80 13
2007-11-06 Perforation 324.10 324.60 13
2007-11-09 Fracture 324.10 623.80 0
1999-08-06 Perforation 687.00 689.00 13
2000-03-18 Perforation 530.00 534.00 13
2000-03-18 Perforation 671.00 675.00 13
2000-05-24 Fracture 530.00 534.00 0
2000-07-21 Perforation 181.00 184.00 17
2000-07-21 Perforation 175.00 179.00 17

For data sources see[4]



References