X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0335032604000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0335032604000
 
| Well ID: 0335032604000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.868552, -114.334618 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.868552, -114.334618 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-26-033-03W5/0
 
| Location: 00/04-26-033-03W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/04-26-033-03 W5/00
 
| Location Alias 2: 00/04-26-033-03 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 033
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 26
 
|-
 
|-
 
| County/Municipality: [[Mountain View County,_Alberta|Mountain View County]]
 
| County/Municipality: [[Mountain View County,_Alberta|Mountain View County]]
 
|-
 
|-
| Well Name: C GROUP HARME 4-26-33-3
+
| Well Name: CLEARVIEW  GARR 4-26-33-3
 
|-
 
|-
| Operator Name: [[NAL Resources Limited]]
+
| Operator Name: [[Clearview Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0434410
 
| License Number: 0434410
Line 29: Line 39:
 
| Final Drill Date: 2012-02-13
 
| Final Drill Date: 2012-02-13
 
|-
 
|-
| Well Total Depth: 3320 m
+
| Well Total Depth: 3320.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.868552
 
| Surface Hole Latitude: 51.868552
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-06-16
 +
| Obtained License
 +
|-
 +
| 2012-02-01
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-02-02
 +
| Well Log Performed
 +
|-
 +
| 2012-02-04
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-02-08
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2012-02-09
 +
| Well Log Performed
 +
|-
 +
| 2012-02-13
 +
| Finished Drilling
 +
|-
 +
| 2012-02-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-02-15
 +
| Liner Casing Operation Performed
 +
|-
 +
| 2012-02-15
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-02-15
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2012-02-16
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2012-02-16
 +
| Rig Released
 +
|-
 +
| 2012-02-25
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-02-26
 +
| Well Began Production
 +
|-
 +
| 2012-02-26
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2012-02-26
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2020-03-31
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2020-03-31
 +
| Well Mode changed to Suspended
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
== Spud Table ==
 
== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 54: Line 133:
 
!scope="col" | Activity Type
 
!scope="col" | Activity Type
 
|-
 
|-
| 31 Jan 2012
+
| 2012-01-31
 
| [[Excalibur Drilling Ltd.]]
 
| [[Excalibur Drilling Ltd.]]
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
Line 64: Line 143:
 
  | title =ST49: Daily Spud and Drilling Activity List
 
  | title =ST49: Daily Spud and Drilling Activity List
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-30
+
| date = 2020-04-30
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-09 }}</ref>
 
== Directional Drilling ==
 
== Directional Drilling ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 153:
 
|-
 
|-
 
| 2012-02-04
 
| 2012-02-04
| style="text-align: right;" | 1555
+
| style="text-align: right;" | 1555.00
 
| Horizontal
 
| Horizontal
 
|-
 
|-
Line 81: Line 160:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 94: Line 173:
 
| 2012-02-15
 
| 2012-02-15
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 3315
+
| style="text-align: right;" | 3315.00
| style="text-align: right;" | 3320
+
| style="text-align: right;" | 3320.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-02-15
+
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2076
+
| style="text-align: right;" | 2855.40
| style="text-align: right;" | 3315
+
| style="text-align: right;" | 2855.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-02-16
+
| 2012-02-25
| Open Hole/Barefoot Completion
+
| Multi-Stage Fracture
| style="text-align: right;" | 3315
+
| style="text-align: right;" | 2780.70
| style="text-align: right;" | 3320
+
| style="text-align: right;" | 2780.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3305.7
+
| style="text-align: right;" | 2707.30
| style="text-align: right;" | 3305.8
+
| style="text-align: right;" | 2707.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3224.7
+
| style="text-align: right;" | 2632.00
| style="text-align: right;" | 3224.8
+
| style="text-align: right;" | 2632.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3152.5
+
| style="text-align: right;" | 2556.40
| style="text-align: right;" | 3152.6
+
| style="text-align: right;" | 2556.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3078.4
+
| style="text-align: right;" | 2481.30
| style="text-align: right;" | 3078.5
+
| style="text-align: right;" | 2481.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3005.2
+
| style="text-align: right;" | 2406.10
| style="text-align: right;" | 3005.3
+
| style="text-align: right;" | 2406.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2929.8
+
| style="text-align: right;" | 2330.50
| style="text-align: right;" | 2929.9
+
| style="text-align: right;" | 2330.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2855.4
+
| style="text-align: right;" | 2253.90
| style="text-align: right;" | 2855.5
+
| style="text-align: right;" | 2254.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2780.7
+
| style="text-align: right;" | 2178.40
| style="text-align: right;" | 2780.8
+
| style="text-align: right;" | 2178.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-02-25
+
| 2012-02-15
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2707.3
+
| style="text-align: right;" | 2076.00
| style="text-align: right;" | 2707.4
+
| style="text-align: right;" | 3315.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2632
+
| style="text-align: right;" | 2117.30
| style="text-align: right;" | 2632.1
+
| style="text-align: right;" | 2117.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-02-25
+
| 2012-02-16
| Multi-Stage Fracture
+
| Open Hole/Barefoot Completion
| style="text-align: right;" | 2556.4
+
| style="text-align: right;" | 3315.00
| style="text-align: right;" | 2556.5
+
| style="text-align: right;" | 3320.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2481.3
+
| style="text-align: right;" | 3305.70
| style="text-align: right;" | 2481.4
+
| style="text-align: right;" | 3305.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2406.1
+
| style="text-align: right;" | 3224.70
| style="text-align: right;" | 2406.2
+
| style="text-align: right;" | 3224.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2330.5
+
| style="text-align: right;" | 3152.50
| style="text-align: right;" | 2330.6
+
| style="text-align: right;" | 3152.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2253.9
+
| style="text-align: right;" | 3078.40
| style="text-align: right;" | 2254
+
| style="text-align: right;" | 3078.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2178.4
+
| style="text-align: right;" | 3005.20
| style="text-align: right;" | 2178.5
+
| style="text-align: right;" | 3005.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-02-25
 
| 2012-02-25
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2117.3
+
| style="text-align: right;" | 2929.80
| style="text-align: right;" | 2117.4
+
| style="text-align: right;" | 2929.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 216: Line 295:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 249: Line 342:
 
| 2012
 
| 2012
 
| style="text-align: right;" | 6439
 
| style="text-align: right;" | 6439
| style="text-align: right;" | 1317.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 255: Line 348:
 
| 2013
 
| 2013
 
| style="text-align: right;" | 8747
 
| style="text-align: right;" | 8747
| style="text-align: right;" | 901.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 261: Line 354:
 
| 2014
 
| 2014
 
| style="text-align: right;" | 8686
 
| style="text-align: right;" | 8686
| style="text-align: right;" | 601.4
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 267: Line 360:
 
| 2015
 
| 2015
 
| style="text-align: right;" | 8487
 
| style="text-align: right;" | 8487
| style="text-align: right;" | 445.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 273: Line 366:
 
| 2016
 
| 2016
 
| style="text-align: right;" | 8474
 
| style="text-align: right;" | 8474
| style="text-align: right;" | 421.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" | 8350
 
| style="text-align: right;" | 8350
| style="text-align: right;" | 323.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 38.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
 
| style="text-align: right;" | 8700
 
| style="text-align: right;" | 8700
| style="text-align: right;" | 322.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 38.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
| style="text-align: right;" | 2156
+
| style="text-align: right;" | 7940
| style="text-align: right;" | 77.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 1728
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 7.1
 
 
|-
 
|-
 
|}
 
|}
Line 299: Line 398:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 310: Line 409:
 
|-
 
|-
 
| 2012-03-07
 
| 2012-03-07
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 318: Line 417:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 06:13, 31 January 2021

Well Details

Well ID: 0335032604000
Loading map...
Location: 00/04-26-033-03W5/0
Location Alias: 00/04-26-33-03 W5M
Location Alias 2: 00/04-26-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 26
County/Municipality: Mountain View County
Well Name: CLEARVIEW GARR 4-26-33-3
Operator Name: Clearview Resources Ltd.
License Number: 0434410
License Date: 2011-06-16
License Status: Issued
Spud Date: 2012-01-31
Final Drill Date: 2012-02-13
Well Total Depth: 3320.00 m
Surface Hole Latitude: 51.868552
Surface Hole Longitude: -114.334618

For data sources see[1][2]

Well History

Date Event
2011-06-16 Obtained License
2012-02-01 Surface Casing Operation Performed
2012-02-02 Well Log Performed
2012-02-04 Direction Drilling Operation Performed - Horizontal
2012-02-08 Intermediate Casing Operation Performed
2012-02-09 Well Log Performed
2012-02-13 Finished Drilling
2012-02-13 Well Mode changed to Drilled and Cased
2012-02-15 Liner Casing Operation Performed
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Open-Hole Completion
2012-02-16 Perforation Treatment Performed - Open-Hole Completion
2012-02-16 Rig Released
2012-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-26 Well Began Production
2012-02-26 Well Fluid changed to Crude Oil
2012-02-26 Well Mode changed to Pumping
2020-03-31 Well Fluid changed to Crude Oil
2020-03-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-31 Excalibur Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-04 1555.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-15 Open Hole/Barefoot Completion 3315.00 3320.00 0
2012-02-25 Multi-Stage Fracture 2855.40 2855.50 0
2012-02-25 Multi-Stage Fracture 2780.70 2780.80 0
2012-02-25 Multi-Stage Fracture 2707.30 2707.40 0
2012-02-25 Multi-Stage Fracture 2632.00 2632.10 0
2012-02-25 Multi-Stage Fracture 2556.40 2556.50 0
2012-02-25 Multi-Stage Fracture 2481.30 2481.40 0
2012-02-25 Multi-Stage Fracture 2406.10 2406.20 0
2012-02-25 Multi-Stage Fracture 2330.50 2330.60 0
2012-02-25 Multi-Stage Fracture 2253.90 2254.00 0
2012-02-25 Multi-Stage Fracture 2178.40 2178.50 0
2012-02-15 Multi-Stage Fracture 2076.00 3315.00 0
2012-02-25 Multi-Stage Fracture 2117.30 2117.40 0
2012-02-16 Open Hole/Barefoot Completion 3315.00 3320.00 0
2012-02-25 Multi-Stage Fracture 3305.70 3305.80 0
2012-02-25 Multi-Stage Fracture 3224.70 3224.80 0
2012-02-25 Multi-Stage Fracture 3152.50 3152.60 0
2012-02-25 Multi-Stage Fracture 3078.40 3078.50 0
2012-02-25 Multi-Stage Fracture 3005.20 3005.30 0
2012-02-25 Multi-Stage Fracture 2929.80 2929.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6439 0.0 0.0 0.0
2013 8747 0.0 0.0 0.0
2014 8686 0.0 0.0 0.0
2015 8487 0.0 0.0 0.0
2016 8474 0.0 0.0 0.0
2017 8350 0.0 0.0 0.0
2018 8700 0.0 0.0 0.0
2019 7940 0.0 0.0 0.0
2020 1728 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-07 No Incident Encountered 0.00 0.00

For data sources see[8]

References