X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0344200410000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0344200410000
 
| Well ID: 0344200410000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.8908652, -112.7778253 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.892146, -112.775881 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/10-04-034-20W4/0
 +
|-
 +
| Location Alias: 00/10-04-34-20 W4M
 +
|-
 +
| Location Alias 2: 00/10-04-034-20 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 034
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 04
 +
|-
 +
| County/Municipality: [[Starland County,_Alberta|Starland County]]
 
|-
 
|-
 
| Well Name: LADD RUMSEY 10-4-34-20
 
| Well Name: LADD RUMSEY 10-4-34-20
 
|-
 
|-
| Operator:
+
| Operator Name: [[Amax Petroleum Of Canada Inc.]]
 +
|-
 +
| License Number: 0084086
 
|-
 
|-
 
| License Date: 1980-07-11
 
| License Date: 1980-07-11
 
|-
 
|-
| Final Drilling Date: 1980-08-01
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1980-07-23
 +
|-
 +
| Final Drill Date: 1980-08-01
 +
|-
 +
| Well Total Depth: 1390.00 m
 +
|-
 +
| Surface Hole Latitude: 51.892146
 +
|-
 +
| Surface Hole Longitude: -112.775881
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-07-11
 +
| Obtained License
 +
|-
 +
| 1980-08-01
 +
| Finished Drilling
 +
|-
 +
| 1980-08-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1980-08-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-08-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-08-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-08-05
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-08-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-08-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-08-26
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1980-09-25
 +
| Well Began Production
 +
|-
 +
| 1980-09-25
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1980-09-25
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1981-10-06
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1981-10-06
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1982-06-10
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1982-06-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-06-10
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-06-10
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1982-06-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1983-06-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1983-12-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1983-12-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1983-12-01
 +
| Well Log Performed
 +
|-
 +
| 1983-12-02
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1984-07-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-07-25
 +
| Well Log Performed
 +
|-
 +
| 1984-07-26
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1984-12-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-12-28
 +
| Plug Back Performed
 +
|-
 +
| 1984-12-28
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1980-08-14
 +
| Perforation
 +
| style="text-align: right;" | 1354.00
 +
| style="text-align: right;" | 1358.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1983-12-02
 +
| Fracture
 +
| style="text-align: right;" | 321.00
 +
| style="text-align: right;" | 328.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-07-25
 +
| Perforation
 +
| style="text-align: right;" | 647.00
 +
| style="text-align: right;" | 650.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1984-07-26
 +
| Fracture
 +
| style="text-align: right;" | 647.00
 +
| style="text-align: right;" | 650.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-12-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 632.00
 +
| style="text-align: right;" | 640.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-12-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 302.00
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-08-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 1354.00
 +
| style="text-align: right;" | 1358.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-08-26
 +
| Fracture
 +
| style="text-align: right;" | 1354.00
 +
| style="text-align: right;" | 1358.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1390.0m
+
| 1982-06-10
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1354.00
 +
| style="text-align: right;" | 1358.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1982-06-10
 +
| Perforation
 +
| style="text-align: right;" | 1325.50
 +
| style="text-align: right;" | 1330.50
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Status: Abandoned Zone
+
| 1982-06-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 1325.50
 +
| style="text-align: right;" | 1330.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1983-06-13
 +
| Fracture
 +
| style="text-align: right;" | 1325.50
 +
| style="text-align: right;" | 1330.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 1983-12-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1312.00
 +
| style="text-align: right;" | 1320.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Violations:
+
| 1983-12-01
 +
| Perforation
 +
| style="text-align: right;" | 321.00
 +
| style="text-align: right;" | 328.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Latitude: 51.8908652
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -112.7778253
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1980
 +
| style="text-align: right;" | 526
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1981
 +
| style="text-align: right;" | 2294
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:59, 31 January 2021

Well Details

Well ID: 0344200410000
Loading map...
Location: 00/10-04-034-20W4/0
Location Alias: 00/10-04-34-20 W4M
Location Alias 2: 00/10-04-034-20 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 20
Section: 04
County/Municipality: Starland County
Well Name: LADD RUMSEY 10-4-34-20
Operator Name: Amax Petroleum Of Canada Inc.
License Number: 0084086
License Date: 1980-07-11
License Status: RecCertified
Spud Date: 1980-07-23
Final Drill Date: 1980-08-01
Well Total Depth: 1390.00 m
Surface Hole Latitude: 51.892146
Surface Hole Longitude: -112.775881

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-11 Obtained License
1980-08-01 Finished Drilling
1980-08-01 Well Mode changed to Drilled and Cased
1980-08-03 Drill Stem Test Performed
1980-08-04 Drill Stem Test Performed
1980-08-05 Drill Stem Test Performed
1980-08-05 Production Casing Operation Performed
1980-08-14 Perforation Treatment Performed - Jet Perforation
1980-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-26 Perforation Treatment Performed - Fractured
1980-09-25 Well Began Production
1980-09-25 Well Fluid changed to Crude Oil
1980-09-25 Well Mode changed to Pumping
1981-10-06 Well Fluid changed to Crude Oil
1981-10-06 Well Mode changed to Suspended
1982-06-10 Perforation Treatment Performed - Cement Squeeze
1982-06-10 Perforation Treatment Performed - Jet Perforation
1982-06-10 Well Fluid changed to Crude Oil
1982-06-10 Well Mode changed to Abandoned Zone
1982-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-13 Perforation Treatment Performed - Fractured
1983-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-12-01 Perforation Treatment Performed - Jet Perforation
1983-12-01 Well Log Performed
1983-12-02 Perforation Treatment Performed - Fractured
1984-07-25 Perforation Treatment Performed - Jet Perforation
1984-07-25 Well Log Performed
1984-07-26 Perforation Treatment Performed - Fractured
1984-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-28 Plug Back Performed
1984-12-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-14 Perforation 1354.00 1358.00 7
1983-12-02 Fracture 321.00 328.00 0
1984-07-25 Perforation 647.00 650.00 7
1984-07-26 Fracture 647.00 650.00 0
1984-12-28 Packing Device Capped w/Cement 632.00 640.00 0
1984-12-28 Packing Device Capped w/Cement 302.00 310.00 0
1980-08-17 Acid Treatment 1354.00 1358.00 0
1980-08-26 Fracture 1354.00 1358.00 0
1982-06-10 Cement Squeeze 1354.00 1358.00 0
1982-06-10 Perforation 1325.50 1330.50 7
1982-06-11 Acid Treatment 1325.50 1330.50 0
1983-06-13 Fracture 1325.50 1330.50 0
1983-12-01 Packing Device Capped w/Cement 1312.00 1320.00 0
1983-12-01 Perforation 321.00 328.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 526 0.0 0.0 0.0
1981 2294 0.0 0.0 0.0

For data sources see[5]

References