Well Details

Well ID: 34-175-20267
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1985-07-19
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 40.8994839897
Longitude: -83.1329235991

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1016037629 2005-03-31 Set packer at 2340 feet, about 8 feet above a collar. First attempt did not detonate, pull and rerun packer and detonate.
-1088265351 2014-01-09 Inspected the Goodman (SWIW #2) as part of a standard injection well status check. Check well, pressures, storage and identification. Status: ok.
-1112959221 2007-08-06 Inspect well. Site ok. Well under vacuum during inspection. Rate of 110 bbl/day.
-1153397309 2010-05-25 Inspect well. Pumping rate of 86 bbl / day at a pressure of 60 psi.
-1192428576 2005-04-28 Inspect Well. BBL meter is out of alignment to viewing window.
-1266212962 2006-05-30 Inspect Well. Pump Running. Pressure guage at 100 PSI. Pumping 375 BBL/Day. Site OK.
-1301479289 2005-03-21 Packer has been pulled and well will be acidized.
-1375103259 2009-04-06 Inspect well. Flow rate at 0.0 bbl / day.
-1400678190 2009-07-21 Inspect well. Pump operating during inspection. Current pumping rate 175 bbl/day. Site ok.
-1452661231 2012-09-05 Inspect Well. Site ok. Meter is illegible.
-1452995554 2001-06-15 FOLLOW UP TO NOV # 864800091 1210i19 FOLLOW UP TO NOV # 1210i19 Well site checked as result of complaint ( Linda Taylor). No gas leaks or H2S odors. Id faded and needs remarked. Checked scrubber plant while in area . Plant was operating slight H2. 9-9-05(A)10
-1452995554 2001-06-15 FOLLOW UP TO NOV # 864800091 1210i19 FOLLOW UP TO NOV # 1210i19 Well site checked as result of complaint ( Linda Taylor). No gas leaks or H2S odors. Id faded and needs remarked. Checked scrubber plant while in area . Plant was operating slight H2. NONE(F)
-1665239280 2013-12-10 Inspected the M. Goodman #1 (SWIW #2) as part of a standard injection well status check. Check well, storage and identification. No change in status from previous inspection. Status: ok. Unable to check pressures: gauge malfunctioning.
-177514582 2008-03-19 Inspect facility.
-1777435067 2003-10-21 Inspect well. Cannot collect reading. Fittings are in poor condition. Operator intends to upgrade the well head. Well is in use.
-185183501 2009-12-02 Inspect well location. 93 bbl/day. Operator has constructed a new prefabricated production dike area. No tanks have been set at this time. This area will not be utilized until spring. The dike area at the well head has been removed and reclaimed. Area looks good.
-1907438008 2008-09-09 Inspect Well and location with Jeff Fry. ID Posted. Well flowing at 77.5 bbl per day.
-1991815942 2008-06-03 inspect well and site. Site ok.
-2029169561 2005-04-04 Install new tubing 2 3/8 inch. fiberglass centron 2SP8-2500 D012005 Nominal wall 180, 28 joints at 29.3 feet each.
-2041659607 2005-09-28 Inspect well.
-2057997590 2010-03-30 Inspect well. Rate of 45.6 bbl/day.
-2059236708 2004-08-25 Inspect well. ID posted. Site has been cleaned up.
-2072187478 2014-02-11 Location Information. ENTRANCE: Lat. 40.89887 Long. -83.13167 / WELL HEAD: Lat. 40.89962 Long. -83.13299 / CENTER-OF-STORAGE: Lat. 40.89899 Long. -83.13127.
-246300222 2014-03-13 Inspected the Goodman #1 (SWIW #2) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: no change in status from previous inspection.
-314967665 2009-06-02 Inspect well. Site ok. ID posted. Operator reported the well was pressured up last week. Rate of 57 bbl/day.
-402950402 2007-09-24 inspect well. Site ok. Rate of 134 BBL/Day.
-457118117 2003-01-30 Insp. 11:45 a.m. Area snow covered. Inspection w/ Jeff Fry.Tubing was on vacum. Well appeared to be shut down for the winter. Check Columbus file to see how operator is testing the annulus since the reading was at 0 today.
-49728331 2004-04-21 Inspect Well. No identification posted.
-531431194 2008-07-28 Inspect location. Flow rate of 100 bbl/day.
-577433866
-61563929 2007-11-14 Inspect facility. Site ok. Rate of 173 bbbl/day.
-696775773 2009-01-27 Inspect well. Zero bbl/day rate.
-790108970 2004-12-27 Inspect well. Well has been winterized, access to injection line is limited. Dog house over pump reduce freezing.
-802070664 2007-05-21 Inspect well. Well head meter at 226 BBL per day on vacuum. One 300 BBL tanks.
-956303511 2003-10-09 Inspect well site. Well head has not been upgraded. Appears the diked area overflowed the dike and the subsequent clean up activities were performed.
-968245292 2012-11-26 Inspect well for integrity and pressure.
1020354100 2006-07-24 Inspect Well. Flow rate 70 BPD. Installation of new electric multi stage pump. Storage tank has been removed from well head location. All tanks are consolidated with production tanks.
1031323696 2002-09-06 Has a small amount of fluid inside of the dike. Can not chk the annulus pressure because the valve will not open. Need to replace the valve. Called and told Mike to do a pressure test.
1035210044 2002-10-16 Well inspection. System down due to disconnected power source. Tear in Tank battery liner. Accumulation of rain water in dike field. No pressure gauge valve port on well head piping. Over spray of oil impacted vegetation approximately 5 foot square near well head.
1043923993 2007-03-28 inspect well.
113004672 2012-04-30 Inspect Well.
1144068974 2006-03-29 Inspect Well. Flow rate 0 bbl/day.
1159964750 2006-10-02 Inspect well. Injection on vacuum during inspection.
1164990596 2006-11-29 Inspect well.
1173276280 2014-07-02 Inspect well for integrity and pressure. The meter has failed. The pump is in operation during inspection. Identification at well head is faded and is required to be posted at the tanks.
1201525735 2008-01-24 Inspect well. Site ok. Flow rate Zero.
1208992794 2005-02-22 Inspect Well. Well winterized, Dog house over pump. Subsequent to inspection, Inspector spoke with operator for procedure to view and read digital meter.
12473560 2001-10-31 Chk well and storage, injection pump is running at this time.
1290096385 2010-11-18 Inspect well. All equipment and tanks setup in new dike containment system.
1301665306 2011-04-01 On site to check well and storage, Hss positive pressure on the annulus but not enough to measue.
1306321727 2004-06-22 Inspect well.
1324382535 2011-06-29 Inspect well. site ok. Pump pressure 53 psi at rate of 164 bbl/day.
1384540823 2013-11-15 Inspected the Goodman #1 (SWIW #2) as part of a standard injection well status check. Check well, pressures, storage and identification. Status: ok.
1546319055 2013-09-10 Inspected the M. Goodman #1 (SWIW #2) as part of a standard injection well status check. Check well, storage and identification. Status: ok.
159524301 2003-09-09 Inspect Well and well site. Well has just been purchased by Frantz Ent. Ltd. Did not collect pressure readings. The injection valve is nonfunctional. No injection port on well head. Operator stated he would address and intended to replace the piping in the near future.
1624264754 2012-01-30 Inspect well. pumping rate at 155 bbl/day
165775352 2004-11-02 Inspect Well. Id posted. Well has been winterized.
1661303427 2004-03-01 Inspect site. Inspect well on 2-26-04 annulus at 0.0 psi. Operator contacted inspector on 3-1-04, stated he had pressured up annulus to 125 psi. Reinspect well on 3-1-04.
1768847052 2011-10-11 Inspect well.
1790180571 2007-01-22 Inspect well.
1903895025 2010-09-13 Inspect well. Site ok.
1966867538 2003-12-23 Inspect Injection well. Well has been retrofitted with new pipe run and needle valevs for guages. Thank you.
1972895486 2005-11-16 Inspect Well. Well operating at 75.64 BBl per day.
2029226582 2010-01-28 Inspect well. Site ok. Needle valve on injection at well head frozen shut. No pressure measured. 0 bbl / day.
2098523422 2010-07-26 Inspect well and tanks. Site ok.
233594908 2005-04-05 Test Annulus at 700 psi for 15 minutes with no loss in pressure.
379442146 2013-04-03 Inspect storage tanks and dike area. Measure dike area.
422456166 2009-09-16 Inspect well and location. Flow rate at 47 bbl/day.
452810224 2006-01-26 Inspect Well. Well winterized. Injection at 446 bbl/day.
4673489 2001-08-01 Follow up on Notice Of Violation. Dike still has fluid in it. Wrong permit number on identification sign. Took photos and prepared report.

01/07/04 per Sam Injection pressures not checked JF.

496475599 2011-01-27 Inspect well. Check pressures.
536642275 2014-02-11 Inspected the Goodman #1 (SWIW #2) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok, the site is currently snow covered.
5693463 2001-08-13 Dike still has oil in it.
5973503 2001-08-17 Follow-up on notice of violation. Fluid has been removed from dike and the storage tank has been cleaned. Electric line has been installed in preparation for installation of an injection pump.

01/07/04 per Sam Injection pressures not checked JF.

6873512 2001-08-23 Follow up on NOV issued by Jeff Fry. The dike has a small amount of water in it due to recent rains. No oil or residue floating on it at this time. Electric lines and a small load of dirt have been installed on the site in preperation for installation
689116211 2003-09-17 Update GPS data point.
846185796 2013-03-04 Inspected the Goodman #1 (SWIW #2) a part of a standard injection well status check. The complete storage consists of three tanks (#42381, #42382 and #42383) commingled with #299 and #315. The storage complex serves as storage for the disposal well (two plastic brine tanks) for the Goodman #2 (SWIW #2) and is completely surrounded by a 43'W x 66'L x 30"D galvanized steel sided gravel lined dike. The well identification and emergency contact information is posted at the injection well. The annulus registered 3 pounds on the state issued gauge. Status: ok.
895533261 2008-12-04 Inspect well. Rate of 118 bbl/day.
899800500 2005-07-27 Inspect Well. Well on vacuum. 15.6 bbl/day.
9573536 2001-09-26 Chk on the status of the well and storage facilities. The dike has some rain water in it no oil at this time. Has pump and motor installed but not hooked up to the injection line yet. Annulus pressure is 0 psi at this time.
PL16 Preliminary Restoration done information from Data Point
UIC1713 1998-04-09 1509.22 (5) FLUID IN DIKE
UIC1714 1998-04-09 1501: 9-3-04 (A) CONTAMINATION 9-3-04(A)
UIC1715 1998-04-09 1501: 9-3-06 (H) IDENTIFICATION