If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.926208, -79.528344 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.926208, -79.528344 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[ | + | | County: [[Armstrong County, Pennsylvania|Armstrong]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Washington Township, Armstrong County, Pennsylvania|Washington Township]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[MDS ENERGY LTD|MDS ENERGY LTD]] |
|- | |- | ||
| Farm/Lease Name: WILLIAM & PHILIP MCAULEY 1M-99 | | Farm/Lease Name: WILLIAM & PHILIP MCAULEY 1M-99 |
Well ID: 005-30945 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.926208,"lon":-79.528344,"icon":""}]} |
County: Armstrong | |
Municipality: Washington Township | |
Operator Name: MDS ENERGY LTD | |
Farm/Lease Name: WILLIAM & PHILIP MCAULEY 1M-99 | |
First Permit Date: 2011-12-09 | |
Last Permit Date: 2011-12-09 | |
Spud Date: 2012-03-21 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.926208 | |
Longitude: -79.528344 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2052424 | 2012-03-21 | No Violations Noted | Site construction had commenced at the time of inspection. No accelerated erosion noted on the well pad or access road. The E&S plan was on site and being implemented at the time of inspection. | |
2086943 | 2012-07-27 | No Violations Noted | The Department notes that the day before the inspection the site received a very significant precipitation event. At the time of inspection the site appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road leaving the site at the time of inspection. The site was temporary stabilized and all erosion and sedimentation BMP's were properly installed and maintained. The pit located onsite appeared to be sound condition and had the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the E&S controls are maintained. | |
2127669 | 2013-01-02 | No Violations Noted | Site was covered with approximately 6 inches of snow. Drilling had been completed but site was not equipped for production. E&S controls were implemented in accordance with the on-site E&S plan and appeared adequate. Site had not yet been restored; soil pile and flow back pit were still present. Liner of the pit appeared to be in good condition.
Department requests operator restore the well site within 9 months after total depth (TD) is reached in accordance with § 3216(c) of the Oil and Gas Act. |
|
2128483 | 2013-01-07 | No Violations Noted | Well open on 7” x 2” swage and venting gas out installed vent pipe (moderate expression). Pit on location lined and freeboard maintained.
Drilling to 3512’ completed 07-29-12. Marcellus Vertical permit issued 12-09-11. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 270.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 | PATRIOT WATER TREATMENT | WARREN | OH |
2012-2 | FRACING FLUID WASTE | 240.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 | PATRIOT WATER TREATMENT | WARREN | OH |