X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25227"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-25227
 
| Well ID: 37-059-25227
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.913491, -80.001069 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.913491, -80.001069 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Greene County, Pennsylvania|Greene]]
 
| County: [[Greene County, Pennsylvania|Greene]]
Line 9: Line 9:
 
| Municipality: [[Cumberland Township, Greene County, Pennsylvania|Cumberland Township]]
 
| Municipality: [[Cumberland Township, Greene County, Pennsylvania|Cumberland Township]]
 
|-
 
|-
| Operator Name: [[ATLAS RESOURCES LLC|ATLAS RESOURCES LLC]]
+
| Operator Name: [[ATLAS RESOURCES LLC]]
 
|-
 
|-
| Well Pad ID: [[147933]]
+
| Well Pad ID: [[147933|147933]]
 
|-
 
|-
 
| Farm/Lease Name: CARTER UNIT 12H
 
| Farm/Lease Name: CARTER UNIT 12H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 39.913491
 
| Latitude: 39.913491
 
|-
 
|-
 
| Longitude: -80.001069
 
| Longitude: -80.001069
|-
 
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
|-
 
| 1830954
 
| 2009-09-28
 
| No Violations Noted
 
|
 
|
 
|-
 
|-
 
| 1837610
 
| 2009-10-19
 
| No Violations Noted
 
|
 
|
 
|-
 
|-
 
| 1897060
 
| 2010-07-09
 
| No Violations Noted
 
| The operator submitted a request for a six month site restoration extension on 4/7/10 due to pipeline and frac equipment scheduling difficulties.  The well reached total depth on 10/18/09 and the ID sign and E&S plan was on site.  All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event.  The following extension has been approved, and the deadline for the site restoration is 1/18/11.  The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion along with weekly inspections and inspections that follow any significant precipitation that might cause a runoff event.
 
|
 
 
|-
 
|-
 
|}
 
|}
Line 73: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2012-2
+
| 2010-3
| style="text-align:right;" | 182216.0
+
| style="text-align:right;" | 601530.0
 +
| style="text-align:right;" | 203.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 431185.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-2
 +
| style="text-align:right;" | 431185.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-1
 +
| style="text-align:right;" | 318157.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-2
 +
| style="text-align:right;" | 257424.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 91: Line 107:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2012-2
| style="text-align:right;" | 257424.0
+
| style="text-align:right;" | 182216.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 159487.0
 +
| style="text-align:right;" | 181.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 118019.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 100: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2014-1
| style="text-align:right;" | 318157.0
+
| style="text-align:right;" | 128473.0
 
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 109: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2014-2
| style="text-align:right;" | 431185.0
+
| style="text-align:right;" | 117088.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 118: Line 152:
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2015-02
| style="text-align:right;" | 601530.0
+
| style="text-align:right;" | 16837.0
| style="text-align:right;" | 203.0
+
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 127: Line 161:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2015-01
 +
| style="text-align:right;" | 18829.0
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 17748.0
 +
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 136: Line 179:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 148: Line 197:
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 
|-
 
|-
| 2012-2
+
| 2010-3
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 635.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAR000519462
 +
| ADVANCED WASTE SERVICES OF PA LLC
 +
| NEW CASTLE
 +
| PA
 +
|-
 +
|-
 +
| 2010-3
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 530.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
| TUNNELTON LIQUIDS TREATMENT FACILITY
 +
| SALTSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2010-3
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 107.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PAR000519462
 +
| ADVANCED WASTE SERVICES OF PA LLC
 +
| NEW CASTLE
 +
| PA
 +
|-
 +
|-
 +
| 2010-3
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 9.0
 +
| Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 +
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2010-3
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 80.0
+
| style="text-align:right;" | 100.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0253723
+
| PAR000519462
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| ADVANCED WASTE SERVICES OF PA LLC
| MASONTOWN
+
| NEW CASTLE
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
| 2012-2
+
| 2010-3
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 315.0
+
| style="text-align:right;" | 590.0
 
| Bbl
 
| Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 
|  
 
|  
 
| PA
 
| PA
Line 172: Line 265:
 
| 2009-0
 
| 2009-0
 
| DRILLING
 
| DRILLING
| style="text-align:right;" | 1165.0
+
| style="text-align:right;" | 635.0
 
| Bbl
 
| Bbl
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
|  
 
|  
| CASTLE ENV
 
 
|  
 
|  
 
|  
 
|  
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| DRILLING
 +
| style="text-align:right;" | 530.0
 +
| Bbl
 +
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 +
| PA0091472
 +
| TUNNELTON LIQUIDS TREATMENT FACILITY
 +
| SALTSBURG
 +
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2009-0
 
| 2009-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 4882.0
+
| style="text-align:right;" | 107.0
 
| Bbl
 
| Bbl
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
| MUNICIPAL SEWAGE TREATMENT PLANT
 
|  
 
|  
| CASTLE ENV
+
|  
 
|  
 
|  
 
|  
 
|  
Line 194: Line 298:
 
| 2009-0
 
| 2009-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 4882.0
+
| style="text-align:right;" | 330.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| DANCHO/BROWN #5
+
|  
 
|  
 
|  
 
|  
 
|  
Line 205: Line 309:
 
| 2009-0
 
| 2009-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 4882.0
+
| style="text-align:right;" | 60.0
 
| Bbl
 
| Bbl
 
| OTHER
 
| OTHER
 
|  
 
|  
| NOT LISTED
+
|  
 
|  
 
|  
 
|  
 
|  
Line 216: Line 320:
 
| 2009-0
 
| 2009-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 4882.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| PRITTS #1
+
|  
 
|  
 
|  
 
|  
 
|  
Line 227: Line 331:
 
| 2009-0
 
| 2009-0
 
| FRACKING FLUID
 
| FRACKING FLUID
| style="text-align:right;" | 4882.0
+
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| SHYCHUK #7H
 
 
|  
 
|  
 
|  
 
|  
|-
 
|-
 
| 2009-0
 
| DRILLING
 
| style="text-align:right;" | 1165.0
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
|  
 
|  
| TUNNELTON LIQUIDS COMPANY
 
|
 
|
 
|-
 
|-
 
| 2010-3
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 635.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAR000519462
 
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2010-3
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 107.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAR000519462
 
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2010-3
 
| PRODUCED FLUID
 
| style="text-align:right;" | 100.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAR000519462
 
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
 
| NEW CASTLE
 
| PA
 
|-
 
|-
 
| 2010-3
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 9015.0
 
| Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
|
 
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 
|
 
| PA
 
|-
 
|-
 
| 2010-3
 
| PRODUCED FLUID
 
| style="text-align:right;" | 590.0
 
| Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
|
 
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 
|
 
| PA
 
|-
 
|-
 
| 2010-3
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 530.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 
|-
 
|-
Line 319: Line 346:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PAR000519462
 
| PAR000519462
| ADVANCED WASTE SERVICES OF PA (NEW CASTLE)
+
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| NEW CASTLE
 
| PA
 
| PA
Line 330: Line 357:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 343: Line 370:
 
| REUSE FOR DRILLING OR PLUGGING
 
| REUSE FOR DRILLING OR PLUGGING
 
|  
 
|  
| PA
+
|  
 +
|-
 +
|-
 +
| 2011-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 182.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 
|-
 
|-
 
|-
 
|-
Line 363: Line 401:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-099-23127
 
| 34-099-23127
| NORTH STAR BRINE DISPOSAL
+
| NORTHSTAR #1
 
| YOUNGSTOWN
 
| YOUNGSTOWN
 
| OH
 
| OH
|-
 
|-
 
| 2011-1
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 182.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
 
|-
 
|-
 
|-
 
|-
Line 385: Line 412:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 409: Line 436:
 
| REUSE FOR DRILLING OR PLUGGING
 
| REUSE FOR DRILLING OR PLUGGING
 
|  
 
|  
| PA
+
|  
 
|-
 
|-
 
|-
 
|-
Line 420: Line 447:
 
| REUSE FOR DRILLING OR PLUGGING
 
| REUSE FOR DRILLING OR PLUGGING
 
|  
 
|  
| PA
+
|  
 
|-
 
|-
 
|-
 
|-
Line 432: Line 459:
 
| DEXTER CITY
 
| DEXTER CITY
 
| OH
 
| OH
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 315.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 80.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
| RONCO WASTE PROCESSING FACILITY
 +
| MASONTOWN
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 301.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE FOR DRILLING OR PLUGGING
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 340.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 230.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 330.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 +
| WARREN DRILLING CO #1 (SWIW #6)
 +
| DEXTER CITY
 +
| OH
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 290.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1830954
 +
| 2009-09-28
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1837610
 +
| 2009-10-19
 +
| No Violations Noted
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1897060
 +
| 2010-07-09
 +
| No Violations Noted
 +
| The operator submitted a request for a six month site restoration extension on 4/7/10 due to pipeline and frac equipment scheduling difficulties.  The well reached total depth on 10/18/09 and the ID sign and E&S plan was on site.  All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event.  The following extension has been approved, and the deadline for the site restoration is 1/18/11.  The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion along with weekly inspections and inspections that follow any significant precipitation that might cause a runoff event.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:56, 25 June 2015

Well Details

Well ID: 37-059-25227
Loading map...
County: Greene
Municipality: Cumberland Township
Operator Name: ATLAS RESOURCES LLC
Well Pad ID: 147933
Farm/Lease Name: CARTER UNIT 12H
First Permit Date: 2009-06-23
Last Permit Date: 2009-06-23
Spud Date: 2009-08-10
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.913491
Longitude: -80.001069

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 601530.0 203.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 431185.0 184.0 0.0 0.0 0.0 0.0
2010-2 431185.0 184.0 0.0 0.0 0.0 0.0
2011-1 318157.0 181.0 0.0 0.0 0.0 0.0
2011-2 257424.0 184.0 0.0 0.0 0.0 0.0
2012-1 204495.0 182.0 0.0 0.0 0.0 0.0
2012-2 182216.0 184.0 0.0 0.0 0.0 0.0
2013-1 159487.0 181.0 0.0 0.0 0.0 0.0
2013-2 118019.0 184.0 0.0 0.0 0.0 0.0
2014-1 128473.0 181.0 0.0 0.0 0.0 0.0
2014-2 117088.0 184.0 0.0 0.0 0.0 0.0
2015-02 16837.0 28.0 0.0 0.0 0.0 0.0
2015-01 18829.0 31.0 0.0 0.0 0.0 0.0
2015-03 17748.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 DRILLING FLUID WASTE 635.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-3 DRILLING FLUID WASTE 530.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-3 FRACING FLUID WASTE 107.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-3 FRACING FLUID WASTE 9.0 Bbl IDENTIFY METHOD IN COMMENTS NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS) PA
2010-3 PRODUCED FLUID 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-3 PRODUCED FLUID 590.0 Bbl IDENTIFY METHOD IN COMMENTS NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS) PA
2009-0 DRILLING 635.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT
2009-0 DRILLING 530.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2009-0 FRACKING FLUID 107.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT
2009-0 FRACKING FLUID 330.0 Bbl REUSE OTHER THAN ROAD SPREADING
2009-0 FRACKING FLUID 60.0 Bbl OTHER
2009-0 FRACKING FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING
2009-0 FRACKING FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING
2010-2 PRODUCED FLUID 335.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 PRODUCED FLUID 77.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 PRODUCED FLUID 213.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 FRACING FLUID WASTE 182.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 PRODUCED FLUID 195.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-1 PRODUCED FLUID 150.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTHSTAR #1 YOUNGSTOWN OH
2011-1 PRODUCED FLUID 36.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-2 PRODUCED FLUID 315.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2012-1 FRACING FLUID WASTE 85.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 67.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 220.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 315.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 PRODUCED FLUID 301.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 340.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 230.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 330.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 290.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1830954 2009-09-28 No Violations Noted
1837610 2009-10-19 No Violations Noted
1897060 2010-07-09 No Violations Noted The operator submitted a request for a six month site restoration extension on 4/7/10 due to pipeline and frac equipment scheduling difficulties. The well reached total depth on 10/18/09 and the ID sign and E&S plan was on site. All E&S controls were installed properly and need to be maintained and inspected after every significant rainfall event. The following extension has been approved, and the deadline for the site restoration is 1/18/11. The Department requests that the fill slop be inspected on a regular basis to hinder any accelerated erosion along with weekly inspections and inspections that follow any significant precipitation that might cause a runoff event.

For data sources see[3]

References