X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22118"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22118
 
| Well ID: 37-003-22118
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.490972, -79.710277 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.490972, -79.710277 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: CLEMENTS 4
 
|-
 
|-
 
| First Permit Date: 2010-05-03
 
| First Permit Date: 2010-05-03
Line 16: Line 24:
 
|-
 
|-
 
| Horizontal: No
 
| Horizontal: No
 +
|-
 +
| Well Status: INACTIVE
 
|-
 
|-
 
| Violations: 1
 
| Violations: 1
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 16074.0
+
| style="text-align:right;" | 3625.0
 +
| style="text-align:right;" | 61.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 7.79
 +
| style="text-align:right;" | 61.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 27944.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 53.35
+
| style="text-align:right;" | 420.3
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
|-
 
|-
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 27944.0
+
| style="text-align:right;" | 16074.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 420.3
+
| style="text-align:right;" | 53.35
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 3625.0
+
| style="text-align:right;" | 14835.0
| style="text-align:right;" | 61.0
+
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 7.79
 
| style="text-align:right;" | 61.0
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 108:
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| FRACING FLUID WASTE
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 370.0
+
| style="text-align:right;" | 4.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0091472
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
| CREEKSIDE
+
| SALTSBURG
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| DRILLING FLUID WASTE
+
| FRACING FLUID WASTE
| style="text-align:right;" | 4980.0
+
| style="text-align:right;" | 370.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0095443
| TUNNELTON LIQUIDS COMPANY
+
| CREEKSIDE TREATMENT FACILITY
| SALTSBURG
+
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
Line 110: Line 135:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 121: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 129: Line 154:
 
| PRODUCED FLUID
 
| PRODUCED FLUID
 
| style="text-align:right;" | 5.0
 
| style="text-align:right;" | 5.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 35.0
 
| Bbl
 
| Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 137: Line 173:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 144: Line 186:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1875673
 
| 1875673
Line 149: Line 193:
 
| No Violations Noted
 
| No Violations Noted
 
| On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Little Plum Creek. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained.  Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table.
 
| On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Little Plum Creek. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained.  Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 156: Line 202:
 
| No Violations Noted
 
| No Violations Noted
 
| On June 10th, 2010 a conducted a routine inspection of the above site.  Drilling was currently taking place.  The access road was in good condition.  A site ID and E&S plan were posted on site.  The pits appeared to be in good condition.  E&S controls were in place according to the plan. No accelerated erosion was leaving site.
 
| On June 10th, 2010 a conducted a routine inspection of the above site.  Drilling was currently taking place.  The access road was in good condition.  A site ID and E&S plan were posted on site.  The pits appeared to be in good condition.  E&S controls were in place according to the plan. No accelerated erosion was leaving site.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 164: Line 212:
 
| On June 24th, 2010 I conducted a routine inspection of the above site.  Drilling was completed and a swabbing rig was on site.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit.  Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner.
 
| On June 24th, 2010 I conducted a routine inspection of the above site.  Drilling was completed and a swabbing rig was on site.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit.  Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner.
 
| 590177
 
| 590177
 +
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 +
|
 
|-
 
|-
 
|-
 
|-
Line 171: Line 221:
 
| On June 24th, 2010 I conducted a routine inspection of the above site.  Drilling was completed and a swabbing rig was on site.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit.  Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner.
 
| On June 24th, 2010 I conducted a routine inspection of the above site.  Drilling was completed and a swabbing rig was on site.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit.  Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner.
 
| 590177
 
| 590177
 +
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 +
|
 
|-
 
|-
 
|-
 
|-
Line 177: Line 229:
 
| No Violations Noted
 
| No Violations Noted
 
| HILL DRILLING @2602. TRUCK ADDING NEW STONE TO SITE.
 
| HILL DRILLING @2602. TRUCK ADDING NEW STONE TO SITE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 184: Line 238:
 
| No Violations Noted
 
| No Violations Noted
 
| HILL DRILLING WORKING TO GET 133/8" CASING DOWN HOLE.
 
| HILL DRILLING WORKING TO GET 133/8" CASING DOWN HOLE.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 191: Line 247:
 
| No Violations Noted
 
| No Violations Noted
 
| HILL DRILLING RIG AT 762 FT.  SITE,PIT,E&S,AND ACCESS,OK.
 
| HILL DRILLING RIG AT 762 FT.  SITE,PIT,E&S,AND ACCESS,OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 198: Line 256:
 
| No Violations Noted
 
| No Violations Noted
 
| On July 29th, 2010 I conducted a CEI inspection of the above site for violations noted on 6/24/2010.  The drilling pits had been closed and filled.  The site was partially graded and restoration had begun.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  E&S controls should continue to be inspected routinely and after each significant rainfall event until 70% uniform vegetative cover is reached.
 
| On July 29th, 2010 I conducted a CEI inspection of the above site for violations noted on 6/24/2010.  The drilling pits had been closed and filled.  The site was partially graded and restoration had begun.  A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site.  E&S controls should continue to be inspected routinely and after each significant rainfall event until 70% uniform vegetative cover is reached.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 205: Line 265:
 
| No Violations Noted
 
| No Violations Noted
 
| THIS GAS WELL IS COMPLETE AND HOOKED UP. THE PIT IS GONE BUT RESTORATION IS NOT COMPLETE. E&S, AND ACCESS, OK.
 
| THIS GAS WELL IS COMPLETE AND HOOKED UP. THE PIT IS GONE BUT RESTORATION IS NOT COMPLETE. E&S, AND ACCESS, OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 212: Line 274:
 
| No Violations Noted
 
| No Violations Noted
 
| On June 1st, 2011 I conducted a routine inspection of the above site.  The site was restored and well vegetated.  A well tag was present. The access road was in good condition.  Two tanks were on site and surrounded by an earthen dike.  No spills, leaks, or accelerated erosion were observed during the inspection.
 
| On June 1st, 2011 I conducted a routine inspection of the above site.  The site was restored and well vegetated.  A well tag was present. The access road was in good condition.  Two tanks were on site and surrounded by an earthen dike.  No spills, leaks, or accelerated erosion were observed during the inspection.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 220: Line 284:
 
| OIL AND GAS WELL IN GOOD SHAPE. EQUIPTED WITH JACK AND SEVERAL TANKS.
 
| OIL AND GAS WELL IN GOOD SHAPE. EQUIPTED WITH JACK AND SEVERAL TANKS.
 
SITE RESTORED.
 
SITE RESTORED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 225: Line 291:
 
| 2173553
 
| 2173553
 
| 2013-06-05
 
| 2013-06-05
| Allegheny
 
| Plum Boro
 
 
| No Violations Noted
 
| No Violations Noted
 +
| WELL MAINTAINED OIL AND GAS WELL. THE STORAGE TANKS ARE DIKED. THE SITE HAS BEEN RESTORED.
 +
|
 +
|
 +
|
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:25, 26 June 2015

Well Details

Well ID: 37-003-22118
Loading map...
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: CLEMENTS 4
First Permit Date: 2010-05-03
Last Permit Date: 2010-05-03
Spud Date: 2010-06-02
Unconventional: No
Horizontal: No
Well Status: INACTIVE
Violations: 1
Latitude: 40.490972
Longitude: -79.710277

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 3625.0 61.0 0.0 0.0 7.79 61.0
2011-0 27944.0 365.0 0.0 0.0 420.3 365.0
2012-0 19685.0 366.0 0.0 0.0 172.65 366.0
2013-0 16074.0 365.0 0.0 0.0 53.35 365.0
2014-0 14835.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 370.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-0 FRACING FLUID WASTE 580.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 PRODUCED FLUID 105.5 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2013-0 PRODUCED FLUID 5.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 35.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1875673 2010-04-08 No Violations Noted On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Little Plum Creek. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table.
1893057 2010-06-10 No Violations Noted On June 10th, 2010 a conducted a routine inspection of the above site. Drilling was currently taking place. The access road was in good condition. A site ID and E&S plan were posted on site. The pits appeared to be in good condition. E&S controls were in place according to the plan. No accelerated erosion was leaving site.
1893981 2010-06-24 Violation(s) Noted On June 24th, 2010 I conducted a routine inspection of the above site. Drilling was completed and a swabbing rig was on site. A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site. A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit. Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner. 590177 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
1893981 2010-06-24 Violation(s) Noted On June 24th, 2010 I conducted a routine inspection of the above site. Drilling was completed and a swabbing rig was on site. A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site. A portion of the berm surrounding the drilling pit had collapsed allowing the liner to fall into the pit. Drill cuttings and liquid wastes had overtopped the liner and were on the surface of the ground and had flowed behind the liner. 590177 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
1895108 2010-06-11 No Violations Noted HILL DRILLING @2602. TRUCK ADDING NEW STONE TO SITE.
1895128 2010-06-03 No Violations Noted HILL DRILLING WORKING TO GET 133/8" CASING DOWN HOLE.
1895130 2010-06-08 No Violations Noted HILL DRILLING RIG AT 762 FT. SITE,PIT,E&S,AND ACCESS,OK.
1910655 2010-07-29 No Violations Noted On July 29th, 2010 I conducted a CEI inspection of the above site for violations noted on 6/24/2010. The drilling pits had been closed and filled. The site was partially graded and restoration had begun. A site ID and E&S plan were posted on site. E&S controls were in place according to the plan. No accelerated erosion was leaving site. E&S controls should continue to be inspected routinely and after each significant rainfall event until 70% uniform vegetative cover is reached.
1927874 2010-10-25 No Violations Noted THIS GAS WELL IS COMPLETE AND HOOKED UP. THE PIT IS GONE BUT RESTORATION IS NOT COMPLETE. E&S, AND ACCESS, OK.
1984618 2011-06-01 No Violations Noted On June 1st, 2011 I conducted a routine inspection of the above site. The site was restored and well vegetated. A well tag was present. The access road was in good condition. Two tanks were on site and surrounded by an earthen dike. No spills, leaks, or accelerated erosion were observed during the inspection.
2064319 2012-04-11 No Violations Noted OIL AND GAS WELL IN GOOD SHAPE. EQUIPTED WITH JACK AND SEVERAL TANKS.

SITE RESTORED.

2173553 2013-06-05 No Violations Noted WELL MAINTAINED OIL AND GAS WELL. THE STORAGE TANKS ARE DIKED. THE SITE HAS BEEN RESTORED.

For data sources see[3]

References