== Well Details == | == Well Details == | ||
{| class="wikitable" width="95%" | {| class="wikitable" width="95%" | ||
− | | Well ID: 129-28567 | + | | Well ID: 42-129-28567 |
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.375272, -79.286622 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.375272, -79.286622 | width=100% | height=100% }} | ||
|- | |- |
Well ID: 42-129-28567 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.375272,"lon":-79.286622,"icon":""}]} |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: WPX ENERGY APPALACHIA LLC | |
Farm/Lease Name: FRYE SOUTH 1-2H | |
First Permit Date: 2011-03-29 | |
Last Permit Date: 2011-03-29 | |
Spud Date: 2011-04-11 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.375272 | |
Longitude: -79.286622 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1957271 | 2011-03-15 | No Violations Noted | Inspection was in response to OG-57 Waiver Request for a site within 100' of a pond and a stream. Waiver is being approved with the following comments:
Construction of site had begun. No disturbance had been made within the 100¿ of pond. Met HRI representatives on site and spoke with Tom McCombie (HRI) about project. It was agreed upon that a drainage swale/ditch with a sediment trap would be constructed between the toe of the slope and the pond. Compost socks would also be installed as indicated. All necessary BMPs need to be adequately constructed. |
|
1964443 | 2011-04-01 | No Violations Noted | Site visit was part of routine inspection.
Construction of on-site impoundment complete; but not yet lined. Excavation for off site impoundment ongoing. Well pad was being lined with geotextile fabric and stone. Diversion ditch had been installed along pond encroachment area. Ditch was holding some water. Back-up silt socks were installed. No violations noted at this time. |
|
1969098 | 2011-04-25 | No Violations Noted | Site visit was part of routine inspection.
Construction of on-site impoundment complete; but not yet lined. Excavation for off site impoundment ongoing. Rig was being constructed. Drill pits were installed and lined. No off site E&S issues. Diversion ditch had been installed along pond encroachment area. Ditch was holding some water. Back-up silt socks were installed. No violations noted at this time. |
|
1982095 | 2011-06-09 | No Violations Noted | Site visit was in response to reported spill on 6-7-11.
Met with company man during visit. Spill comprised of oil based drilling mud. Mud was contained in cellar and on pad. No fluid was lost. All recovered material was returned to circulation. Pits good. E&S controls stable. No violations noted at this time. |
|
1985336 | 2011-07-01 | No Violations Noted | Site visit was part of routine inspection.
Site was vacant axcept for water trucks (5) filling on-site impoundment. Water had a very green color with soap suds in spots. It appeared to be from other drilling sites. Site was stable. E&S sound. Pits ok with adequate freeboard. No violations noted at this time. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 326650.71 | 11.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 545478.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 24169.0 | 11.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 2275.27 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | RESERVED ENVIRONMENTAL SERVICES | MOUNT PLEASANT | PA |
2011-1 | DRILL CUTTINGS | 1854.0 | Tons | LANDFILL | 100419 | VEOLIA ES - CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
2012-1 | FRACING FLUID WASTE | 330.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 | RESERVED ENVIRONMENTAL SERVICES | MOUNT PLEASANT | PA |